Columbia County is committed to ensuring accessibility to this website regardless of disability. If anyone encounters a feature on this website that is inaccessible due to a disability, please contact the County Manger’s Office and the Columbia County Board of County Commissioners at (386) 758-1005. You may also email that office at patrick_weaver@columbiacountyfla.com and provide a brief description of the inaccessible feature. The County will either correct the inaccessible feature or, if correction is not possible due to technical limitations, provide the desired information through alternative means.

Skip to content

Columbia County, FL | Building and Zoning

Request to Schedule Inspections - Step 1 of 2






New Residential Construction
334 SW BALLARD CT LAKE CITY, FL 32024

* No Inspections are allowed - No Notice of Commencement on file.
Select Inspection Message
Electrical - 1st Underground Rough–In
Verifies conduit, wiring, and grounding prior to backfill. Ref: NEC Art. 300.5
No Notice of Commencement on file.
Plumbing/Gas - 1st Underground Rough–In
Inspects drainage and water piping before backfill. Ref: FBC-P 312
Inspection was completed on 2025.08.14.
No Notice of Commencement on file.
Plumbing/Gas - 2nd Rough-In
Reviews piping, venting, and fixtures before wall close. Ref: FBC-P 312
Missing required documentation.
No Notice of Commencement on file.
Electrical - 2nd Rough-In
Checks wiring, panel placement, and boxes before cover-up. Ref: NEC Art. 110.3
Missing required documentation.
No Notice of Commencement on file.
Engineering - D.O.T Final Driveway
Ensures driveway construction complies with Florida Department of Transportation standards when accessing a state-maintained road. Ref: FDOT Standard Index, Columbia County LDR 4.2.3
No Notice of Commencement on file.
Building - Ext Strapping/Wall Sheathing
Verifies wall sheathing, nailing, and exterior strapping per wind-load requirements. Ref: FBC 110.3, 1609
Missing required documentation.
No Notice of Commencement on file.
Building - Fire Rated Wall
Confirms fire-related wall assemblies meet UL/FBC details and penetrations are properly sealed. Ref: FBC 703
Missing required documentation.
No Notice of Commencement on file.
Building - Footer
Inspects footing size, depth, and reinforcing steel before concrete placement. Ref: FBC 110.3(1)
Inspection was completed on 2025.12.16.
No Notice of Commencement on file.
Building - Framing
Reviews structural framing, load paths, fire blocking, and MEP rough-ins prior to insulation. Ref: FBC 110.3(3)
Missing required documentation.
No Notice of Commencement on file.
Building - Insulation
Verifies insulation type, R-value, and installation before drywall. Ref: FBC Energy C101.5
Missing required documentation.
No Notice of Commencement on file.
Building - Lath/Stucco
Checks stucco lath, weep screeds, and moisture barriers before application. Ref: FBC 110.3
Missing required documentation.
No Notice of Commencement on file.
Building - Lintel/Tie Beam
Ensures lintel/tie beam reinforcing steel and anchorage are correct before pour. Ref: FBC 110.3
Missing required documentation.
No Notice of Commencement on file.
Building - Masonry Wall Reinforcing
Confirms vertical and horizontal reinforcing per engineered plans. Ref: FBC 2122.2
No Notice of Commencement on file.
Building - Monolithic Slab
Inspects reinforcement, vapor barrier, termite treatment, and plumbing prior to pour. Ref: FBC 110.3(1)
Inspection was completed on 2025.08.29.
No Notice of Commencement on file.
Building - Rated Assembly Fastening
Verifies fastening and components for fire-rated walls, ceilings, or roofs. Ref: FBC 703
Missing required documentation.
No Notice of Commencement on file.
Building - Roof Decking
Checks roof sheathing attachment and fastener pattern per FBC wind zones. Ref: FBC 110.3(3)
Missing required documentation.
No Notice of Commencement on file.
Mechanical - Rough In
Checks ductwork, equipment location, and condensate before covering. Ref: FBC-M 603
Missing required documentation.
No Notice of Commencement on file.
Building - Slab
Ensures proper base, vapor barrier, reinforcing, and termite treatment before pour. Ref: FBC 110.3(1)
No Notice of Commencement on file.
Building - Strapping
Reviews hurricane straps, anchors, and connections, for uplift resistance. Ref: FBC 1609
Missing required documentation.
No Notice of Commencement on file.
Electrical - Temporary Power Service
Allows temporary power for construction use. Ref: NEC Art. 230
No Notice of Commencement on file.
Plumbing/Gas - Tub Set/Shower Pan
Verifies water-tightness and slope before tile. Ref: FBC-P 312.9
Missing required documentation.
No Notice of Commencement on file.
Building - Vertical Cells/Columns
Checks filled masonry cells or columns for reinforcing and grout. Ref: FBC 2122.2
Missing required documentation.
No Notice of Commencement on file.
Building - Wall Sheathing
Confirms nail/screw spacing and panel installation per plans. Ref: FBC 110.3(3)
Missing required documentation.
No Notice of Commencement on file.
Building - Window Attachment
Verifies fastening of windows/doors for impact and wind load compliance. Ref: FBCR 609
Missing required documentation.
No Notice of Commencement on file.
Building - Final
Ensures structure is complete, safe, and code-compliant before Certificate of Occupancy. Ref: FBC 110.5
Missing required documents.
Assessment is owed.
No Notice of Commencement on file.
Electrical - Permanent Power
Releases power once service equipment is complete and safe. Ref: NEC Art. 230
Missing required documentation.
No Notice of Commencement on file.