Inspection |
Notes |
Performed By |
Date |
Passed: Engineering - Initial Driveway |
|
Mccormick, David |
2/8/2021 |
Passed: Engineering - Setbacks |
|
Anthony Aslan |
2/10/2021 |
Passed: Electrical - Temporary Service |
|
Anthony Aslan |
2/10/2021 |
Release to power company |
|
Anthony Aslan |
2/10/2021 |
Passed: Building - Footer |
Wire Ties Rebar Back Porch, Send Pics |
Anthony Aslan |
2/10/2021 |
Passed: Plumbing/Gas - 1st Underground Rough–In |
|
Anthony Aslan |
3/4/2021 |
Passed: Building - Slab |
|
Anthony Aslan |
3/9/2021 |
Passed: Electrical - 1st Underground Rough–In |
|
Anthony Aslan |
3/9/2021 |
Passed: Building - Roof Decking |
|
Anthony Aslan |
4/5/2021 |
Passed: Building - Wall Sheathing |
Need Nails Marked With Red Marker. |
Anthony Aslan |
4/5/2021 |
Passed: Building - Strapping |
Just Window Inspection.
notes For Framing:
-g18 Truss Missing Lower Engineering
-g22 Truss Needs Heavier Strapping
-d04 Needs Studs Under Girder Truss, Have Single Stud
|
Anthony Aslan |
4/7/2021 |
Cancelled: Building - Framing |
|
Anthony Aslan |
4/15/2021 |
Cancelled: Building - Framing |
|
Anthony Aslan |
4/15/2021 |
Passed: Building - Framing |
Made Correction |
Anthony Aslan |
4/19/2021 |
Passed: Mechanical - Rough In |
|
Anthony Aslan |
4/19/2021 |
Cancelled: Mechanical - Rough In |
|
Anthony Aslan |
4/29/2021 |
Passed: Electrical - 2nd Rough-In |
Need To Fire Caulk Backside Of Main Electric Feeder At Panel Top Plate |
Anthony Aslan |
4/29/2021 |
Passed: Plumbing/Gas - 2nd Rough-In |
|
Anthony Aslan |
4/29/2021 |
Failed: Plumbing/Gas - Tub Set/Shower Pan |
Need Water In Tubs And Shower Pan |
Anthony Aslan |
4/29/2021 |
Failed: Building - Insulation |
Need Foam Around Windows, Top Of Doors, Interior Walls That Intersect Exterior Walls |
Anthony Aslan |
5/4/2021 |
Passed: Plumbing/Gas - Tub Set/Shower Pan |
|
Anthony Aslan |
5/5/2021 |
Passed: Building - Insulation |
|
Anthony Aslan |
5/5/2021 |
Septic Release Inspection |
|
Health Dept |
6/11/2021 |
Passed: Electrical - Permanent Power |
Need Culvert Release |
Anthony Aslan |
7/1/2021 |
Cancelled: Electrical - Permanent Power |
|
Melissa Garber |
7/16/2021 |
Release to power company |
|
Melissa Garber |
7/19/2021 |
Passed: Engineering - Final Driveway |
|
Mccormick, David |
7/19/2021 |
Passed: Building - Final |
Need Sticker On Panel ( Notice To Home Owner Equipment In Attic ) |
Anthony Aslan |
8/2/2021 |
Certificate-Release Certificate |
Rec'vd Picture Of Notice To Home Owner |
Anthony Aslan |
8/6/2021 |