| Inspection |
Notes |
Performed By |
Date |
| Passed: Plumbing/Gas - 1st Underground Rough–In |
Electrical Conduit Was Also Inspected Under Slab |
Matt Forsyth |
10/28/2024 |
| Failed: Building - Footer |
Need Bare Copper Wire For Bonding To Rebar Also Footing Needs More Chairs For Support Rebar |
Matt Forsyth |
11/6/2024 |
| Passed: Engineering - Setbacks |
|
Matt Forsyth |
11/6/2024 |
| Passed: Building - Slab |
|
Matt Forsyth |
11/6/2024 |
| Passed: Building - Footer |
|
Matt Forsyth |
11/15/2024 |
| Passed: Engineering - Setbacks |
|
Matt Forsyth |
11/15/2024 |
| Passed: Building - Slab |
Porches |
Matt Forsyth |
11/15/2024 |
| Passed: Electrical - Temporary Service |
|
Matt Forsyth |
1/9/2025 |
| Release to power company |
|
Matt Forsyth |
1/9/2025 |
| Passed: Building - Framing |
Envelope Of The Building Is Complete |
Matt Forsyth |
1/28/2025 |
| Passed: Building - Framing |
All Interior Walls And Ceilings |
Matt Forsyth |
3/6/2025 |
| Passed: Electrical - 2nd Rough-In |
|
Matt Forsyth |
3/6/2025 |
| Passed: Mechanical - Rough In |
|
Matt Forsyth |
3/6/2025 |
| Passed: Plumbing/Gas - 2nd Rough-In |
Sidewall Venting |
Matt Forsyth |
3/6/2025 |
| Passed: Plumbing/Gas - Tub Set/Shower Pan |
|
Matt Forsyth |
3/6/2025 |
| Failed: Building - Insulation |
Spraying Was In Progress Please Reschedule |
Matt Forsyth |
3/17/2025 |
| Passed: Building - Insulation |
|
Matt Forsyth |
3/18/2025 |
| Cancelled: Building - Insulation |
|
Matt Forsyth |
3/19/2025 |
| Septic Release Inspection |
|
Health Dept |
4/23/2025 |
| Passed: Electrical - Permanent Power |
|
Matt Forsyth |
5/12/2025 |
| Release to power company |
|
Melissa Garber |
5/15/2025 |
| Passed: Building - Final |
Termite Final,-- Rcv'd 5-28-25 Na
fresh Air Damper (bdt) Verified (aa) |
Anthony Aslan |
5/23/2025 |