Columbia County is committed to ensuring accessibility to this website regardless of disability. If anyone encounters a feature on this website that is inaccessible due to a disability, please contact the County Manger’s Office and the Columbia County Board of County Commissioners at (386) 758-1005. You may also email that office at patrick_weaver@columbiacountyfla.com and provide a brief description of the inaccessible feature. The County will either correct the inaccessible feature or, if correction is not possible due to technical limitations, provide the desired information through alternative means.

Skip to content

Columbia County, FL | Permit Details

New Residential Construction Permit

Address 7938 SE COUNTY ROAD 252
LULU, FL 32061
Parcel #: 10534-002
Acres: 5.74
Owner: Johnson Ashton Sonny & Cassidy
Subdivision:
Zoning: A-3
Flood Zone: X
District: 4
Application #: 51769
Permit #: 000042931
Related Permit:
Submitted: Thursday, February 3, 2022
Issued: Friday, October 8, 2021
Expires: Monday, April 4, 2022
Completed: Monday, April 4, 2022
Status: Completed
Septic Release? Yes
Notes:

Job Details
Elevation regulation Minimum Requirement
Finished floor requirement 32" above grade
Fema map number 12023C0401C
Mobile Home is a: Double Wide
Year Built 2025
Width (Ft.In) 32
Length (Ft.In) 66
Driveway access to home: Existing Drive
Installation Decal # 116120
Septic # (00-0000) or (X00-000) 24-0796
Setbacks Front 30'
Setback Side 1 25'
Setbacks Rear 25'
Dev Permit # F023-
Setback Side 2 25'
Serial # DES290GA24-14005AB
Wind Zone? 2
Residential or Commercial Use? Residential
Service Amps 200
How many of bedrooms does this home have? 3
How many bathrooms does this home have? 2
Review Notes
9/24/2021 Point Review - Received-Hard Copy Application NEEDED: *OWNER AND CONTRACTOR SIGNATURE PAGE *ROOF OPTION SELECTED
9/24/2021 Point Review - Reviewed NEEDED: *OWNER AND CONTRACTOR SIGNATURE PAGE *ROOF OPTION SELECTED
9/28/2021 Zoning Review - Reviewed NEEDED: *OWNER AND CONTRACTOR SIGNATURE PAGE *ROOF OPTION SELECTED
10/4/2021 Plan Review - Building Approved
10/4/2021 Plan Review - Electrical Approved
10/4/2021 Plan Review - Mechanical Approved
10/4/2021 Plan Review - Plumbing Approved
10/4/2021 Plan Review - Reviewed
10/7/2021 Zoning Review - Reviewed
10/7/2021 Final Review - Reviewed
10/7/2021 Final Review - Payment Needed
10/8/2021 Permit Issued Permit #000042931 created and approved.
2/22/2022 Final Review - Payment Needed
Contractors
Name/ Business License Title Role
Brian T Giebeig
Trent Giebeig Construction,inc.
CRC1330693 Residential Contractor Contractor
Everton D Ruddock
D&s Lighting Inc
EC13003800 Electrical Contractor Subcontractor
Derrick L Williams
Dl Williams Heating & Cooling Llc
CAC1816913 Class "b" A/c Contractor Subcontractor
Kenneth R Roche
Ken Roche Plumbing Inc Dba Plumbing Now
CFC1426527 Plumbing Contractor Subcontractor
Inspections
Inspection Notes Performed By Date
Passed: Building - Footer Anthony Aslan 10/13/2021
Passed: Engineering - Setbacks Anthony Aslan 10/13/2021
Passed: Plumbing/Gas - 1st Underground Rough–In Anthony Aslan 10/22/2021
Passed: Building - Slab Anthony Aslan 10/26/2021
Failed: Electrical - Temporary Service Ground Wire Not Connected In Meter Anthony Aslan 11/12/2021
Passed: Electrical - Temporary Service Ground Connected Anthony Aslan 11/15/2021
Release to power company Anthony Aslan 11/15/2021
Passed: Building - Roof Decking Anthony Aslan 12/15/2021
Passed: Building - Wall Sheathing Anthony Aslan 12/15/2021
Passed: Building - Framing Anthony Aslan 1/6/2022
Failed: Electrical - 2nd Rough-In Service Feeder More Than 50% Of Bearing Top Plate Anthony Aslan 1/6/2022
Failed: Mechanical - Rough In Incomplete Return, Hall Bath Exhausting Over Window, Check Tape On Boots Anthony Aslan 1/6/2022
Passed: Plumbing/Gas - 2nd Rough-In Anthony Aslan 1/6/2022
Passed: Plumbing/Gas - Tub Set/Shower Pan Anthony Aslan 1/6/2022
Passed: Building - Insulation Anthony Aslan 1/10/2022
Passed: Electrical - 2nd Rough-In Anthony Aslan 1/10/2022
Passed: Mechanical - Rough In Need 4" Min Around Supply & Return Ducts Anthony Aslan 1/10/2022
Release to power company Melissa Garber 2/22/2022
Cancelled: Electrical - Permanent Power Melissa Garber 2/22/2022
Passed: Electrical - Permanent Power Need Septic Release Anthony Aslan 2/22/2022
Septic Release Inspection Health Dept 2/22/2022
Failed: Building - Final Locking Caps And Tie Downs On Condenser, No Disconnect On Ahu Or Water Heater No With In Sight Of Panel. Anthony Aslan 4/1/2022
Passed: Building - Final Rec'd Pictures Of Corrections Anthony Aslan 4/4/2022