Inspection |
Notes |
Performed By |
Date |
Passed: Building - Footer |
|
Anthony Aslan |
10/13/2021 |
Passed: Engineering - Setbacks |
|
Anthony Aslan |
10/13/2021 |
Passed: Plumbing/Gas - 1st Underground Rough–In |
|
Anthony Aslan |
10/22/2021 |
Passed: Building - Slab |
|
Anthony Aslan |
10/26/2021 |
Failed: Electrical - Temporary Service |
Ground Wire Not Connected In Meter |
Anthony Aslan |
11/12/2021 |
Passed: Electrical - Temporary Service |
Ground Connected |
Anthony Aslan |
11/15/2021 |
Release to power company |
|
Anthony Aslan |
11/15/2021 |
Passed: Building - Roof Decking |
|
Anthony Aslan |
12/15/2021 |
Passed: Building - Wall Sheathing |
|
Anthony Aslan |
12/15/2021 |
Passed: Building - Framing |
|
Anthony Aslan |
1/6/2022 |
Failed: Electrical - 2nd Rough-In |
Service Feeder More Than 50% Of Bearing Top Plate |
Anthony Aslan |
1/6/2022 |
Failed: Mechanical - Rough In |
Incomplete Return, Hall Bath Exhausting Over Window, Check Tape On Boots |
Anthony Aslan |
1/6/2022 |
Passed: Plumbing/Gas - 2nd Rough-In |
|
Anthony Aslan |
1/6/2022 |
Passed: Plumbing/Gas - Tub Set/Shower Pan |
|
Anthony Aslan |
1/6/2022 |
Passed: Building - Insulation |
|
Anthony Aslan |
1/10/2022 |
Passed: Electrical - 2nd Rough-In |
|
Anthony Aslan |
1/10/2022 |
Passed: Mechanical - Rough In |
Need 4" Min Around Supply & Return Ducts |
Anthony Aslan |
1/10/2022 |
Release to power company |
|
Melissa Garber |
2/22/2022 |
Cancelled: Electrical - Permanent Power |
|
Melissa Garber |
2/22/2022 |
Passed: Electrical - Permanent Power |
Need Septic Release |
Anthony Aslan |
2/22/2022 |
Septic Release Inspection |
|
Health Dept |
2/22/2022 |
Failed: Building - Final |
Locking Caps And Tie Downs On Condenser, No Disconnect On Ahu Or Water Heater No With In Sight Of Panel. |
Anthony Aslan |
4/1/2022 |
Passed: Building - Final |
Rec'd Pictures Of Corrections |
Anthony Aslan |
4/4/2022 |