Mobile Home
Permit
| Application #: | 60918 |
| Permit #: |
000047253 |
| Related Permit: |
|
| Submitted: | Monday, April 24, 2023 |
| Issued: | Wednesday, May 17, 2023 |
| Expires: | Friday, June 16, 2023 |
| Completed: | Friday, June 16, 2023 |
| Status: |
Completed |
| Septic Release? |
Yes |
Notes
MFE = 1' ABOVE THE ROAD
Job Details
| Elevation regulation |
Minimum Requirement |
| Finished floor requirement |
One foot above the road |
| Fema map number |
12023C0459C |
| In floodway |
N |
| Mobile Home is a: |
Single Wide |
| Year Built |
2023 |
| Width (Ft.In) |
16 |
| Length (Ft.In) |
66 |
| Driveway access to home: |
Culvert Waiver |
| Installation Decal # |
99352 |
| Septic # |
23-0324 |
| Setbacks Front |
30' |
| Setback Side 1 |
10' |
| Setbacks Rear |
25' |
| Dev Permit # |
F023- |
| Setback Side 2 |
10' |
| Are you applying for a 5 year temporary permit? |
No |
| Serial # |
052-000-H-A521007A |
| Wind Zone? |
2 |
| Residential or Commercial Use? |
Residential |
| Service Amps |
200 |
Review Notes
| 4/24/2023 |
Application pending. |
| 4/24/2023 |
Application submitted by applicant. |
| 4/25/2023 |
Point Review - Printed-Online Application |
| 4/25/2023 |
Point Review - Reviewed |
| 5/2/2023 |
Zoning Review - Reviewed |
| 5/3/2023 |
Plan Review - Reviewed |
| 5/3/2023 |
Final Review - Documents Required |
| 5/8/2023 |
Final Review - Documents Required |
| 5/16/2023 |
Final Review - Reviewed |
| 5/17/2023 |
Final Review - Payment Needed |
| 5/17/2023 |
Permit Issued |
Contractors
| Name / Business |
License |
Title |
Role |
Ernest S Johnson Dependable Mobile Home Service
|
IH1025249 |
Mh Installer (ih) |
Contractor |
Timothy D Shatto Shatto Heating & Air, Inc.
|
CAC057875 |
A/c Class B |
Subcontractor |
Glenn Whittington Whittington Electric Inc
|
EC13002957 |
Electrical Contractor |
Subcontractor |
Inspections
| Inspection |
Notes |
Performed By |
Date |
| Passed: Mobile Home - Mobile Home Set-Up Final |
Septic To Complete Permit |
Matt Forsyth |
6/8/2023 |
| Release to power company |
|
Melissa Garber |
6/16/2023 |
| Certificate-Release Certificate |
|
Matt Forsyth |
6/16/2023 |
| Septic Release Inspection |
|
Health Dept |
6/16/2023 |
| (Requested) Engineering-Setbacks |
|
|
|