6/2/2025
|
City of Lake City Utilities Notified.
City of Lake City Notified of Application within Utility Service Areas LC_GAS, LC_WATER, LC_SEWER.
|
6/4/2025
|
Point Review - Received-Hard Copy Application
NEEDED:
*CITY AVAILABILITY LETTER
*PROPOSED SITE PLAN WITH DIMENSIONS PROPERTY LINES TO PROPOSED LOCATION OF ADDITION
*ROOF UNDERLAYMENT OPTION SELECTED
*SUBCONTRACTOR FORM FOR TRADES (MECHANICAL, ELECTRICAL, PLUMBING)
*PLAN REVIEWER TO DETERMINE IF TRUSS ENGINEERING IS REQUIRED
|
6/4/2025
|
Zoning Review - Documents Required
NEEDED:
*CITY AVAILABILITY LETTER
*PROPOSED SITE PLAN WITH DIMENSIONS PROPERTY LINES TO PROPOSED LOCATION OF ADDITION
*ROOF UNDERLAYMENT OPTION SELECTED
*SUBCONTRACTOR FORM FOR TRADES (MECHANICAL, ELECTRICAL, PLUMBING)
*PLAN REVIEWER TO DETERMINE IF TRUSS ENGINEERING IS REQUIRED
*OWNER DISCLOSURE STATEMENT NOT SIGNED/NOTARIZED
|
6/15/2025
|
Zoning Review - Reviewed
NEEDED:
*not on city sewer-- env health needed-- contact 386.758.1058
*PLAN REVIEWER TO DETERMINE IF TRUSS ENGINEERING and termite treatment IS REQUIRED
*MARRIAGE CERT or loa from jacqueline dickson to homer hines
*owner disclosure statment needs pg 1-3
*will there be any mechanical, electrical, or plumbing? please provide a signed subform for relative trades or submit with n/a
|
6/16/2025
|
Plan Review - Documents Required
NEEDED:
*NOT ON CITY SEWER-- ENV HEALTH NEEDED-- CONTACT 386.758.1058
**need sealed TRUSS ENGINEERING AND TERMITE TREATMENT IS REQUIRED
*MARRIAGE CERT OR LOA FROM JACQUELINE DICKSON TO HOMER HINES
*OWNER DISCLOSURE STATMENT NEEDS PG 1-3
*WILL THERE BE ANY MECHANICAL, ELECTRICAL, OR PLUMBING? PLEASE PROVIDE A SIGNED SUBFORM FOR RELATIVE TRADES OR SUBMIT WITH N/A
|
6/21/2025
|
Plan Review - Documents Required
NEEDED:
**NEED SEALED TRUSS ENGINEERING AND TERMITE TREATMENT IS REQUIRED
|
6/23/2025
|
Plan Review - On Hold-Incomplete
NEEDED:
**NEED SEALED TRUSS ENGINEERING AND TERMITE TREATMENT IS REQUIRED
|
6/27/2025
|
Plan Review - On Hold-Incomplete
NEEDED:
**NEED SEALED TRUSS ENGINEERING AND TERMITE TREATMENT IS REQUIRED
|
6/30/2025
|
Plan Review - On Hold-Incomplete
NEEDED:
**NEED SEALED TRUSS ENGINEERING AND TERMITE TREATMENT IS REQUIRED
|
7/1/2025
|
Plan Review - Building Approved
NEEDED:
TERMITE TREATMENT REQUIRED
|
7/1/2025
|
Plan Review - Electrical Approved
NEEDED:
TERMITE TREATMENT REQUIRED
|
7/1/2025
|
Plan Review - Reviewed
NEEDED:
TERMITE TREATMENT REQUIRED
|
7/2/2025
|
Point Review - Received-Hard Copy Application
NEEDED:
TERMITE TREATMENT REQUIRED
|
7/2/2025
|
Plan Review - Reviewed
NEEDED:
must use conventionally framed rafters
TERMITE TREATMENT REQUIRED
|
7/2/2025
|
Final Review - Reviewed
|
7/2/2025
|
Final Review - Payment Needed
|
7/3/2025
|
Permit Issued
Permit #000053515 created and approved.
|