2/19/2025
|
Application pending.
|
2/19/2025
|
Application submitted by applicant.
|
2/20/2025
|
Point Review - Processing
|
3/10/2025
|
Plan Review - Building Approved
NEEDED:
*PRODUCT APPROVAL CODE FOR THE ROOFING MATERIAL
*PLAN REVIEWER TO DETERMINE IF ROOFING SUB NEEDED-- ROOFING SUBCONTRACTOR FORM REQUIRED IF YES
|
3/10/2025
|
Plan Review - Reviewed
NEEDED:
*PRODUCT APPROVAL CODE FOR THE ROOFING MATERIAL
*PLAN REVIEWER TO DETERMINE IF ROOFING SUB NEEDED-- ROOFING SUBCONTRACTOR FORM REQUIRED IF YES
|
3/10/2025
|
Plan Review - Reviewed
NEEDED:
*PRODUCT APPROVAL CODE FOR THE ROOFING MATERIAL
if structure is to be reroofed a sub form will be needed ?
|
3/10/2025
|
Zoning Review - Reviewed
NEEDED:
*PRODUCT APPROVAL CODE FOR THE ROOFING MATERIAL
*PLAN REVIEWER TO DETERMINE IF ROOFING SUB NEEDED-- ROOFING SUBCONTRACTOR FORM REQUIRED IF YES-- IF STRUCTURE IS TO BE REROOFED A SUB FORM WILL BE NEEDED-- IS STRUCTURE BEING REROOFED? ROOFER HAS NOT PULLED A SEPERATE PERMIT AND CAN BE LISTED AS A SUB
|
3/10/2025
|
Final Review - Documents Required
NEEDED:
*PRODUCT APPROVAL CODE FOR THE ROOFING MATERIAL
*PLAN REVIEWER TO DETERMINE IF ROOFING SUB NEEDED-- ROOFING SUBCONTRACTOR FORM REQUIRED IF YES-- IF STRUCTURE IS TO BE REROOFED A SUB FORM WILL BE NEEDED-- IS STRUCTURE BEING REROOFED? ROOFER HAS NOT PULLED A SEPERATE PERMIT AND CAN BE LISTED AS A SUB
|
3/14/2025
|
Final Review - Documents Required
NEEDED:
*PRODUCT APPROVAL CODE FOR THE ROOFING MATERIAL
*PLAN REVIEWER HAS DETERMINED ROOFER CAN BE LISTED AS A SUB, PLEASE HAVE ROOFER SIGN SUBCONTRACTOR FORM AND SUBMIT WITH THIS APPLICATION
|
3/21/2025
|
Final Review - Payment Needed
|
3/24/2025
|
Permit Issued
Permit #000052689 created and approved.
|