4/29/2024
|
Application pending.
|
4/29/2024
|
Application submitted by applicant.
|
5/2/2024
|
Point Review - Printed-Online Application
NEEDED
* ENVIRONMENTAL HEALTH SIGNED SITE PLAN - CONTACT 386-758-1058
|
5/3/2024
|
Zoning Review - Reviewed
NEEDED
* ENVIRONMENTAL HEALTH SIGNED SITE PLAN - CONTACT 386-758-1058
ZONING:
** ELECTRIC COMPANY MAY REQUIRE ACCESS TO ELEVATED METER. ALL UTILITES NEED TO BE 1 FT ABOVE BFE OF 35FT.
** ELEVATION CERTIFICATE WILL BE REQUIRED AT FINAL.
|
5/13/2024
|
Plan Review - Reviewed
NEEDED
** ELECTRIC COMPANY MAY REQUIRE ACCESS TO ELEVATED METER. ALL UTILITES NEED TO BE 1 FT ABOVE BFE OF 35FT.
** 2 ELEVATION CERTIFICATES WILL BE REQUIRED-- PROPOSED FINISHED FLOOR (PRIOR TO PERMIT ISSUANCE) AND FINAL.
* PLEASE CONFIRM # OF BEEDROOMS IN MH - EMAIL BLDGINFO@COLUMBIACOUNTYFLA.COM
|
5/14/2024
|
Zoning Review - Documents Required
NEEDED
** ELECTRIC COMPANY MAY REQUIRE ACCESS TO ELEVATED METER. ALL UTILITES NEED TO BE 1 FT ABOVE BFE OF 35FT.
*1' RISE CERTIFICATION
** 2 ELEVATION CERTIFICATES WILL BE REQUIRED-- PROPOSED FINISHED FLOOR (PRIOR TO PERMIT ISSUANCE) AND FINAL.
* PLEASE CONTACT EH TO CORRECT NUMBER OF BEDROOMS, ALL PAPERWORK REFLECTS 2 AT THIS TIME, NOT 3
.***STAFF-- DEVELOPMENT PERMIT FEE NEEDED
|
5/21/2024
|
Zoning Review - Documents Required
NEEDED
ZONING:
*1' RISE CERTIFICATION NEED PRIOR TO ISSUANCE OF PERMIT
ZONING NOTES:
** ELEVATION CERTIFICATE WILL BE REQUIRED PRIOR TO FINAL.
** SURVEYOR TO PROVIDE INFORMATION ON FINAL EC REGARDING ENGINEERED OR NON-ENGINEERED FLOW-THROUGH SKIRTING.
** ELECTRIC COMPANY MAY REQUIRE ACCESS TO ELEVATED METER. ALL UTILITES NEED TO BE 1 FT ABOVE BFE OF 35FT.
.***STAFF-- DEVELOPMENT PERMIT FEE NEEDED
|
5/21/2024
|
Zoning Review - Reviewed
NEEDED
ZONING NOTES:
** ELEVATION CERTIFICATE WILL BE REQUIRED PRIOR TO FINAL.
** SURVEYOR TO PROVIDE INFORMATION ON FINAL EC REGARDING ENGINEERED OR NON-ENGINEERED FLOW-THROUGH SKIRTING.
** ELECTRIC COMPANY MAY REQUIRE ACCESS TO ELEVATED METER. ALL UTILITES NEED TO BE 1 FT ABOVE BFE OF 34FT.
.***STAFF-- DEVELOPMENT PERMIT FEE NEEDED
|
5/22/2024
|
Final Review - Processing
**DRIVEWAY APPROVAL NEEDED**
|
5/23/2024
|
Final Review - Payment Needed
|
5/23/2024
|
Permit Issued
Permit # created and approved from payment.
|
4/30/2025
|
Point Review - Printed-Online Application
|