| Inspection |
Notes |
Performed By |
Date |
| Rescheduled 6/8/2020:Plumbing/Gas - 1st Underground Rough–In |
|
Melissa Garber |
6/5/2020 |
| Failed: Plumbing/Gas - 1st Underground Rough–In |
Need Water On System |
Matt Forsyth |
6/8/2020 |
| Failed: Plumbing/Gas - 1st Underground Rough–In |
No Water In System |
Matt Forsyth |
6/9/2020 |
| Passed: Plumbing/Gas - 1st Underground Rough–In |
|
Matt Forsyth |
6/16/2020 |
| Passed: Building - Monolithic Slab |
|
Troy Crews |
6/23/2020 |
| Passed: Engineering - Setbacks |
|
Troy Crews |
6/23/2020 |
| Passed: Building - Wall Sheathing |
First Floor |
Troy Crews |
10/12/2020 |
| Passed: Building - Framing |
Partial |
Troy Crews |
2/23/2021 |
| Passed: Electrical - 2nd Rough-In |
Add Smoke Detectors And 220 Amp Circuits In Kitchen |
Troy Crews |
11/28/2022 |
| Passed: Electrical - 2nd Rough-In |
Smoke Detectors Added Also 20 Amp Circuits For Kitchen |
Troy Crews |
2/14/2023 |
| Cancelled: Plumbing/Gas - 2nd Rough-In |
|
Troy Crews |
2/14/2023 |
| Passed: Plumbing/Gas - 2nd Rough-In |
|
Troy Crews |
6/30/2023 |
| Passed: Engineering - Spot Check |
|
Troy Crews |
12/11/2023 |
| Passed: Engineering - Spot Check |
|
Troy Crews |
7/3/2024 |
| Passed: Electrical - Permanent Power |
Need Septic Final |
Troy Crews |
8/26/2024 |
| Release to power company |
|
Melissa Garber |
4/23/2025 |
| Septic Release Inspection |
|
Health Dept |
4/23/2025 |
| Passed: Building - Spot Check |
Owner Arranging For Blower Door Test |
Troy Crews |
5/19/2025 |
| Rescheduled 11/21/2025:Building - Final |
|
Tcrews |
11/20/2025 |
| Passed: Building - Final |
*pictures Of Handrail And Kitchen Sink Required Prior To Co, Termite Final Required-- 3.18.26 Mg |
Troy Crews |
11/21/2025 |