Columbia County is committed to ensuring accessibility to this website regardless of disability. If anyone encounters a feature on this website that is inaccessible due to a disability, please contact the County Manger’s Office and the Columbia County Board of County Commissioners at (386) 758-1005. You may also email that office at patrick_weaver@columbiacountyfla.com and provide a brief description of the inaccessible feature. The County will either correct the inaccessible feature or, if correction is not possible due to technical limitations, provide the desired information through alternative means.

Skip to content

Columbia County, FL | Permit Details

New Residential Construction Permit

Address 798 SW ROSEMARY DR
LAKE CITY, FL 32024
Parcel #: 02731-139
Acres: 0.27
Owner: Adams Homes Of Northwest Florida, Inc,
Subdivision: Preserve At Laurel Lake Unit 1
Zoning: PRD
Flood Zone: X
District: 3
Application #: 70609
Permit #: 000053084
Related Permit:
Submitted: Thursday, May 1, 2025
Issued: Monday, May 12, 2025
Expires: Monday, May 11, 2026
Completed:
Status: Permit Status Update Notification
Septic Release? Yes
Notes:
*MFE = 117.3' PER ENGINEER LETTER, SETBACKS TO BE CONFIRMED-- ELEVATION CONFIRMATION REC'D @ 117.58', SETBACKS CONFIRMED *DRIVE FINAL REQUIRED PRIOR TO POWER RELEASE *CITY TAP INSPECTION REQUIRED PRIOR TO FINAL-- REQUEST THROUGH COUNTY
LAKE CITY UTLITY CUSTOMER SERVICE NOTES 05/16/25 The Utility Department approved the tap application for water and sewer services for this location. Locates must be obtained to ensure that the existing utility infrastructure is not damaged or obstructed.
Job Details
Finished floor requirement
Fema map number 12023C0285D
What is the power service for? Storage Building
Power Company Florida Power and Light
Septic # (00-0000) or (X00-000) x24-082
Electrical Code Edition 2020 National Electrical Code
Number of requested AMPS for electrical service: 200
Is the power service? Upgrading Existing Service
Residential or Commercial? Residential
Review Notes
5/1/2025 Application pending.
5/1/2025 Application submitted by applicant.
5/1/2025 City of Lake City Utilities Notified.
5/1/2025 Point Review - Printed-Online Application
5/1/2025 Point Review - Reviewed
5/1/2025 Zoning Review - Reviewed
5/1/2025 Plan Review - Plumbing Approved
5/1/2025 Plan Review - Mechanical Approved
5/1/2025 Plan Review - Electrical Approved
5/1/2025 Plan Review - Building Approved
5/1/2025 Plan Review - Reviewed
5/1/2025 Final Review - Processing
5/1/2025 Final Review - Payment Needed
5/9/2025 Final Review - Payment Needed
5/12/2025 Permit Issued
11/11/2025 Final Review - Payment Needed
11/21/2025 Permit Status Update Notification
Contractors
Name/ Business License Title Role
William Adams
Adams Homes Of Northwest Florida Inc
CRC1330146 Cert. Residential Contractor
Shawn I Reynolds
N.c.f Electrical Services Llc
Liability Insurance Expired.
EC13011480 Cert. Electrical Subcontractor
Derrick L Williams
D L Williams Heating & Cooling Llc
CAC1816913 Class "b" A/c Contractor Subcontractor
Cody Barrs
Barrs Plumbing Inc
CFC1427145 Plumbing Contractor Subcontractor
Benjamin T Keeler
Keeler Roofing, Llc
CCC1330509 Cert. Roofing Subcontractor
Inspections
Inspection Notes Performed By Date
Passed: Plumbing/Gas - 1st Underground Rough–In Anthony Aslan 7/18/2025
Passed: Building - Monolithic Slab Troy Crews 7/22/2025
Passed: Engineering - Setbacks Surveyor To Confirm Setbacks Troy Crews 7/22/2025
Passed: Building - Ext Strapping/Wall Sheathing Troy Crews 8/19/2025
Passed: Building - Roof Decking Troy Crews 8/19/2025
Passed: Building - Strapping Troy Crews 8/19/2025
Passed: Building - Wall Sheathing Troy Crews 8/19/2025
Failed: Building - Framing Multiple Anchor Bolts Missing Nuts Check The Entire Perimeter Call Back In Prior To Installation Troy Crews 8/29/2025
Passed: Plumbing/Gas - 2nd Rough-In Troy Crews 8/29/2025
Passed: Electrical - 2nd Rough-In Troy Crews 8/29/2025
Passed: Mechanical - Rough In Troy Crews 8/29/2025
Passed: Plumbing/Gas - Tub Set/Shower Pan Troy Crews 8/29/2025
Passed: Building - Framing Anchor Bolts Corrected Troy Crews 9/2/2025
Passed: Building - Insulation Troy Crews 9/4/2025
Passed: Electrical - Permanent Power Need Final Drive And Tap Inspection To Release Pwr 11/7/25 Troy Crews 11/7/2025
Release to power company Ok To Release Power, Assessments Owed Prior To Final Being Granted-- 11.24.25 Mg Mgarber 11/11/2025
Passed: City of Lake City Utilities - Lake City Utilities Tap Inspection City Of Lake City Distribution And Collections Department 11/12/2025
Submitted Power Release through FPL Portal Garber, Melissa 11/24/2025
Documents
File Name Date File Size