| Application #: | 49408 |
| Permit #: |
000043553 |
| Related Permit: |
|
| Submitted: | Friday, May 21, 2021 |
| Issued: | Thursday, January 20, 2022 |
| Expires: | Wednesday, June 8, 2022 |
| Completed: | Wednesday, June 8, 2022 |
| Status: |
Completed |
| Septic Release? |
Yes |
| Elevation regulation |
Minimum Requirement |
| Finished floor requirement |
One foot above the road |
| Fema map number |
12023C0280D |
| In floodway |
N |
| Mobile Home is a: |
Double Wide |
| Year Built |
2022 |
| Width (Ft.In) |
32 |
| Length (Ft.In) |
76 |
| Driveway access to home: |
Culvert Permit |
| Installation Decal # |
78678 |
| Septic # |
21-1062 |
| Setbacks Front |
25' |
| Setback Side 1 |
10' |
| Setbacks Rear |
15' |
| Dev Permit # |
F023- |
| Setback Side 2 |
10' |
| Are you applying for a 5 year temporary permit? |
No |
| Serial # |
lohga20036993ab |
| Wind Zone? |
2 |
| Residential or Commercial Use? |
Residential |
| 5/21/2021 |
Application pending. |
| 5/25/2021 |
Zoning Review - Reviewed |
| 5/27/2021 |
Plan Review - Reviewed |
| 5/27/2021 |
Final Review - Documents Required |
| 6/21/2021 |
Point Review - Printed-Online Application |
| 6/21/2021 |
Point Review - Reviewed |
| 6/21/2021 |
Final Review - Documents Required |
| 6/29/2021 |
Final Review - Documents Required |
| 7/29/2021 |
Final Review - Documents Required |
| 9/3/2021 |
Final Review - Documents Required |
| 10/28/2021 |
Final Review - Documents Required |
| 11/24/2021 |
Final Review - Documents Required |
| 12/15/2021 |
Final Review - Documents Required |
| 12/22/2021 |
Final Review - Documents Required |
| 1/13/2022 |
Final Review - Payment Needed |
| 1/20/2022 |
Permit Issued |
| Name / Business |
License |
Title |
Role |
David Albright David Albright Mobile Home Svc Llc
|
IH1129420 |
Mh Installer (ih) |
Contractor |
Glenn Whittington Whittington Electric Inc
|
EC13002957 |
Electrical Contractor |
Subcontractor |
Ronald Bonds Sr Style Crest Inc
|
CAC1817658 |
Class "b" A/c Contractor |
Subcontractor |
| Inspection |
Notes |
Performed By |
Date |
| Passed: Mobile Home - Mobile Home Set-Up Final |
Need Septic Final |
Troy Crews |
6/1/2022 |
| Passed: Engineering - Setbacks |
|
Troy Crews |
6/1/2022 |
| Release to power company |
|
Melissa Garber |
6/8/2022 |
| Certificate-Release Certificate |
|
Melissa Garber |
6/8/2022 |
| Septic Release Inspection |
|
Health Dept |
6/8/2022 |