Right-of-Way Access/Driveway
Permit
| Address |
, |
| Parcel #: |
10557-000 |
| Acres: | 62.05 |
| Owner: | Collier Miriam T Trust, |
| Subdivision: | |
| Zoning: | A-3 |
| Flood Zone: | X |
| District: | 4 |
| Application #: | 67049 |
| Permit #: |
000051181 |
| Related Permit: |
|
| Submitted: | Monday, September 16, 2024 |
| Issued: | Monday, October 21, 2024 |
| Expires: | Thursday, April 13, 2028 |
| Completed: | |
| Status: |
Permit Issued |
| Septic Release? |
N/A |
Job Details
| Finished floor requirement |
|
| Fema map number |
12023C0430C |
| Standards |
Shall conform to Public Works Determinations as stated below |
| Requirements |
An 18” storm pipe of approved material is required with a minimum length of 24 feet straight ends no miters |
| Status |
Permanent |
| Type of connection for access road |
Rural Driveway |
| Type of construction of property |
Mobile Home |
| Normal vehicle usage: |
Automobiles |
| Side Drain required |
Yes |
| Side Drain Size (diameter in inches) |
18 |
| Study Required |
No |
| Estimated Number of Vehicle trips per day |
2 |
| Is the access for commercial or residential use? |
Residential |
| County Road Type |
Unpaved |
Review Notes
| 9/16/2024 |
Pending applicant completion and submission. |
| 9/16/2024 |
Final Review - Corrections Needed |
| 9/16/2024 |
Application submitted by applicant. |
| 9/16/2024 |
Pending Public Works Application Approval |
| 9/18/2024 |
Application Approved by Public Works |
| 10/11/2024 |
Final Review - Payment Needed |
| 10/11/2024 |
Pending initial driveway inspection |
| 10/21/2024 |
Permit Issued |
Contractors
| Name / Business |
License |
Title |
Role |
Inspections
| Inspection |
Notes |
Performed By |
Date |
| Passed: Engineering - ROW Access/Driveway connects to county maintained road |
|
Chad Williams |
9/16/2024 |
| Passed: Engineering - Initial Driveway |
|
Smith, Blake |
10/14/2024 |
| Passed: Engineering - Driveway Spot Check |
Culvert Pipe Installed With Damage To One End. Recommend Final Inspection Once Repairs Are Made To Pipe. |
Beach, Garrett |
4/14/2025 |
| Failed: Engineering - Driveway Spot Check |
inspection Notes: Driveway Needs To Be Finalized |
Smith, Blake |
4/20/2026 |
| (Requested) Engineering-Driveway Spot Check Failure Review |
|
|
|