Columbia County is committed to ensuring accessibility to this website regardless of disability. If anyone encounters a feature on this website that is inaccessible due to a disability, please contact the County Manger’s Office and the Columbia County Board of County Commissioners at (386) 758-1005. You may also email that office at patrick_weaver@columbiacountyfla.com and provide a brief description of the inaccessible feature. The County will either correct the inaccessible feature or, if correction is not possible due to technical limitations, provide the desired information through alternative means.

Skip to content

Columbia County, FL | Permit Details

Roof Replacement or Repair Permit
Address 5809 NW LAKE JEFFERY RD
LAKE CITY, FL 32055
Parcel #: 02045-102
Acres: 10.17
Owner: Smith Charles W Jr
Subdivision:
Zoning: A-3
Flood Zone: X
District: 1
Application #: 49452
Permit #: 000042024
Related Permit:
Submitted:
Issued: Thursday, May 27, 2021
Expires: Monday, August 30, 2021
Completed: Monday, August 30, 2021
Status: Completed
Septic Release? na
Notes:
PICS AND AFFIDAVIT REC'D
Job Details
Type Roofing Job Overlay with Metal
Type of structure House
Commercial or Residential Residential
Roof Area (for this job) Sq Ft 3500
No. of Stories 1
Ventilation: Ridge Vent
Flashing: Replace All
Drip Edge: Replace All
Valley Treatment: New Metal
Roof Pitch 4:12 or Greater
Is the existing roof being removed? No
Type of New Roofing Product Metal
Florida Product Approval Number fl24508.9
Product Manufacturer reeds metal
Product Description 26 ga rib panel over purlins
Sealed roof decking options: (Must select an option.) Other (explain)
Sealed roof decking explanation for other option. metal over shingles
Building Code Edition 2020 Florida Building Code 7th Edition and Florida Statute 553.844
Fema map number 12023C0280D
Review Notes
5/27/2021 Permit Issued Permit #000042024 created and approved.
Contractors
Name/ Business License Title Role
William P Duffield
Duffield Home Improvement
CCC1325785 Roofing Contractor Contractor
Inspections
Inspection Notes Performed By Date
Passed: Re-Roof - In Progress Matt Forsyth 7/9/2021
Passed: Re-Roof - Final Troy Crews 8/30/2021