Right-of-Way Access/Driveway
Permit
| Application #: | 65227 |
| Permit #: |
000050215 |
| Related Permit: |
|
| Submitted: | Wednesday, May 8, 2024 |
| Issued: | Wednesday, June 26, 2024 |
| Expires: | Thursday, January 15, 2026 |
| Completed: | Thursday, January 15, 2026 |
| Status: |
Completed |
| Septic Release? |
N/A |
Job Details
| Finished floor requirement |
|
| Fema map number |
12023C0305D |
| Standards |
Shall conform to Public Works Determinations as stated below |
| Requirements |
An 18” storm pipe of approved material is required with a minimum length of 32 feet. 4” Concrete Pads shall be located on each mitered end section, and shall be 5’ wide by 7’ long |
| Status |
Permanent |
| Type of construction of property |
Mobile Home |
| Normal vehicle usage: |
Automobiles |
| Side Drain required |
Yes |
| Side Drain Size |
18 |
| Study Required |
No |
| Estimated Number of Vehicle trips per day |
4 |
| Is the access for commercial or residential use? |
Residential |
| County Road Type |
Unpaved |
Review Notes
| 5/8/2024 |
Pending Public Works Application Approval |
| 5/8/2024 |
Application Approved by Public Works |
| 5/9/2024 |
Final Review - Payment Needed |
| 6/25/2024 |
Pending initial driveway inspection |
| 6/26/2024 |
Permit Issued |
Contractors
| Name / Business |
License |
Title |
Role |
Inspections
| Inspection |
Notes |
Performed By |
Date |
| Passed: Engineering - ROW Access/Driveway connects to county maintained road |
|
Chad Williams |
5/8/2024 |
| Passed: Engineering - Initial Driveway |
|
Smith, Blake |
6/26/2024 |
| Passed: Engineering - Driveway Spot Check |
No Work Being Done |
Smith, Blake |
1/3/2025 |
| Failed: Engineering - Driveway Spot Check |
|
Beach, Garrett |
1/6/2026 |
| Passed: Engineering - Final Driveway |
|
Beach, Garrett |
1/15/2026 |
| Passed: Engineering - Driveway Spot Check |
|
Beach, Garrett |
1/20/2026 |