Right-of-Way Access/Driveway
Permit
| Application #: | 65238 |
| Permit #: |
000049816 |
| Related Permit: |
New Residential Construction: 000050420 |
| Submitted: | Wednesday, May 8, 2024 |
| Issued: | Wednesday, August 6, 2025 |
| Expires: | Thursday, August 14, 2025 |
| Completed: | Thursday, August 14, 2025 |
| Status: |
Completed |
| Septic Release? |
N/A |
Job Details
| Finished floor requirement |
|
| Fema map number |
12023C0390C |
| Standards |
Shall conform to Public Works Determinations as stated below |
| Requirements |
An 18” corr metal storm pipe of approved material is required with a minimum length of 24 feet. 4” Concrete Pads shall be located on each mitered end section, and shall be 5’ wide by 7’ long |
| Status |
Permanent |
| Side Drain required |
Yes |
| Side Drain Size |
18 |
| Study Required |
No |
| Construction Material Type |
Limerock/Gravel/Millings |
| Is the access for commercial or residential use? |
Residential |
| County Road Type |
Paved |
Review Notes
| 5/8/2024 |
Pending Public Works Application Approval |
| 5/8/2024 |
Application Approved by Public Works |
| 5/9/2024 |
Final Review - Payment Needed |
| 5/15/2024 |
Permit Issued |
| 8/6/2025 |
Permit Renewed |
| 8/6/2025 |
Permit Reissued |
Contractors
| Name / Business |
License |
Title |
Role |
Inspections
| Inspection |
Notes |
Performed By |
Date |
| Passed: Engineering - ROW Access/Driveway connects to county maintained road |
|
Chad Williams |
5/8/2024 |
| Passed: Engineering - Initial Driveway |
|
Smith, Blake |
5/13/2024 |
| Passed: Engineering - Driveway Spot Check |
Observed Building Construction At This Location, Driveway Not Complete. |
Beach, Garrett |
11/12/2024 |
| Passed: Engineering - Final Driveway |
|
Smith, Blake |
8/14/2025 |