Permit Details

Permit Search

Permit

New Residential Construction

3531 SW COUNTY ROAD 138
FORT WHITE, FL 32038

Permit #
000048047
Application #
61629
Status Permit Issued
  1. Submitted Jun 20, 2023
  2. Issued Sep 7, 2023
  3. Expires Feb 17, 2027
  4. Completed —

Property

Parcel #
04299-003
Owner
Gainey Michael A & Debra K Gainey Revocable Living Trust Dated February 27, 2014,
Acres
38.77
Subdivision
—
Zoning
A-3
Flood zone
X
District
2

Permit

Status
Permit Issued
Septic release
Released
Related permit
—

Job Details

Elevation regulation
Minimum Requirement
Finished floor requirement
One foot above the road
Fema map number
12023C0527C
In floodway
N
This is the construction of a
Single Family Dwelling
Heated Area (Sqft)
1536
Total Area (Sqft)
3536
Stories
1
Building Height
26
Building Code Construction Type
V
Building Code Element
B
Building Code Occupancy Types
Residential
Setbacks Front
30
Setback Side 1
25
Setback Side 2
25
Setbacks Rear
25
Septic# (00-0000) or (X00-000)
26-0758
Service Amps
200
Building Code Edition
2020 Florida Building Code 7th Edition and 2017 National Electrical Code
Sealed roof decking options. (Must select one option per FBC 2023 8th Edition)
a minimum 4-inch wide strip of selfadhering polymer-modified bitumen complying with ASTM D1970 or a minimum 3 ¾ - inch wide strip of selfadhering flexible flashing tape complying with AAMA 711, applied over all joints in the roof decking. A felt underlayment complying with ASTM D226 Type II, ASTM D4869 Type Ill or IV, or ASTM D6757, or a synthetic underlayment meeting the performance requirements specified, is required to be applied over the strips/tape over the entire roof.

Status & Review History

  1. Application pending.
  2. Application submitted by applicant.
  3. Application Converted
  4. Point Review - Printed-Online Application
  5. Point Review - Reviewed
  6. Plan Review - Documents Required
  7. Plan Review - Building Approved
  8. Plan Review - Electrical Approved
  9. Plan Review - Mechanical Approved
  10. Plan Review - Plumbing Approved
  11. Plan Review - Fuel/Gas Approved
  12. Plan Review - Reviewed
  13. Zoning Review - Reviewed
  14. Final Review - Processing
  15. Final Review - Reviewed
  16. Final Review - Payment Needed
  17. Permit Issued

Contractors

No contractors are listed on this permit.

  1. May 16, 2024

    Passed: Engineering - Spot Check

    Bolts For Ledger Board

    Inspected by Anthony Aslan

  2. Jun 20, 2024

    Passed: Building - Vertical Cells/Columns

    Recevied Photos

    Inspected by Anthony Aslan

  3. Dec 17, 2024

    Passed: Building - Spot Check

    Extend Permit

    Inspected by Anthony Aslan

  4. Jun 16, 2025

    Passed: Building - Spot Check

    Plumbing In Progress

    Inspected by Anthony Aslan

  5. Dec 5, 2025

    Cancelled: Building - Ext Strapping/Wall Sheathing

    Inspected by Mgarber

  6. Dec 8, 2025

    Passed: Building - Spot Check

    Inspected by Troy Crews

  7. May 22, 2026

    Passed: Building - Framing

    Inspected by Christian Allen

  8. Aug 21, 2026

    Passed: Building - Roof Decking

    Inspected by Christian Allen

  9. Aug 21, 2026

    Passed: Building - Wall Sheathing

    Inspected by Christian Allen

  10. Oct 19, 2026

    Septic Release Inspection

    Inspected by Health Dept

Documents