Building & Zoning

Inspection Request

Schedule a new inspection for your permit, or cancel one you have already scheduled.

  • Monday–Friday only
  • Requests after 5 PM can’t be for the next day
  • One active request per inspection
  1. Choose inspections
  2. Review & confirm
  3. Done

Request to Schedule Inspections

Enter your permit number, then tell us what you’d like to do.

Press Enter or tab out of the field to load this permit’s inspections.

New Residential Construction 224 SW TRENTON TER FORT WHITE, FL 32038

Date & contact

Tell us when you need the inspector and how to reach you.

Select inspections

Check each inspection you need. An inspection that is already scheduled can’t be requested again until it is cancelled.

  • Allows temporary power for construction use. Ref: NEC Art. 230
  • Reviews structural framing, load paths, fire blocking, and MEP rough-ins prior to insulation. Ref: FBC 110.3(3)
  • Reviews piping, venting, and fixtures before wall close. Ref: FBC-P 312
  • Verifies water-tightness and slope before tile. Ref: FBC-P 312.9
  • Checks wiring, panel placement, and boxes before cover-up. Ref: NEC Art. 110.3
  • Checks ductwork, equipment location, and condensate before covering. Ref: FBC-M 603
  • Verifies insulation type, R-value, and installation before drywall. Ref: FBC Energy C101.5
  • Releases power once service equipment is complete and safe. Ref: NEC Art. 230
  • Ensures structure is complete, safe, and code-compliant before Certificate of Occupancy. Ref: FBC 110.5
Enter a permit number above to see the inspections available for it.