  • Monday–Friday only
  • Requests after 5 PM can’t be for the next day
  • One active request per inspection
  1. Choose inspections
  2. Review & confirm
  3. Done

Request to Schedule Inspections

Enter your permit number, then tell us what you’d like to do.

Press Enter or tab out of the field to load this permit’s inspections.

New Commercial Construction 18960 SW STATE RD 47 FORT WHITE, FL 32038

Date & contact

Tell us when you need the inspector and how to reach you.

Select inspections

Check each inspection you need. An inspection that is already scheduled can’t be requested again until it is cancelled.

* The final inspection cannot be requested because the assessment fees are owed on this property. Other inspections can still be requested. * Some inspections may not be available until Surveyor letter (FFE) is provided.
  • Allows temporary power for construction use. Ref: NEC Art. 230
  • Inspects drainage and water piping before backfill. Ref: FBC-P 312 Inspection was completed on 2026.10.20.
  • Verifies conduit, wiring, and grounding prior to backfill. Ref: NEC Art. 300.5 Inspection was completed on 2026.10.20.
  • Inspects footing size, depth, and reinforcing steel before concrete placement. Ref: FBC 110.3(1)
  • Inspects reinforcement, vapor barrier, termite treatment, and plumbing prior to pour. Ref: FBC 110.3(1) Inspection was completed on 2026.10.27.
  • Confirms vertical and horizontal reinforcing per engineered plans. Ref: FBC 2122.2
  • Checks filled masonry cells or columns for reinforcing and grout. Ref: FBC 2122.2
  • Ensures lintel/tie beam reinforcing steel and anchorage are correct before pour. Ref: FBC 110.3
  • Checks roof sheathing attachment and fastener pattern per FBC wind zones. Ref: FBC 110.3(3)
  • Confirms nail/screw spacing and panel installation per plans. Ref: FBC 110.3(3)
  • Reviews structural framing, load paths, fire blocking, and MEP rough-ins prior to insulation. Ref: FBC 110.3(3)
  • Reviews sanitary sewer piping installation. Ref: FBC-P 312
  • Checks ductwork, equipment location, and condensate before covering. Ref: FBC-M 603
  • Checks water service piping for pressure and sizing. Ref: FBC-P 312.5
  • Verifies insulation type, R-value, and installation before drywall. Ref: FBC Energy C101.5
  • Releases power once service equipment is complete and safe. Ref: NEC Art. 230
  • Ensures structure is complete, safe, and code-compliant before Certificate of Occupancy. Ref: FBC 110.5 Assessment is owed.
  • Full review of fire systems before occupancy. Ref: FBC 907