Request to Schedule Inspections

Enter your permit number, then tell us what you’d like to do.

Press Enter or tab out of the field to load this permit’s inspections.

New Residential Construction 551 SW STERLING TER HIGH SPRINGS, FL 32643

Date & contact

Tell us when you need the inspector and how to reach you.

Select inspections

Check each inspection you need. An inspection that is already scheduled can’t be requested again until it is cancelled.

* The final inspection cannot be requested because the assessment fees are owed on this property. Other inspections can still be requested.
  • Allows temporary power for construction use. Ref: NEC Art. 230 Inspection was completed on 2026.08.11.
  • Inspects footing size, depth, and reinforcing steel before concrete placement. Ref: FBC 110.3(1) Inspection was completed on 2026.08.11.
  • Verifies conduit, wiring, and grounding prior to backfill. Ref: NEC Art. 300.5 Inspection was completed on 2026.09.03.
  • Inspects drainage and water piping before backfill. Ref: FBC-P 312 Inspection was completed on 2026.08.31.
  • Ensures proper base, vapor barrier, reinforcing, and termite treatment before pour. Ref: FBC 110.3(1) Inspection was completed on 2026.09.03.
  • Checks roof sheathing attachment and fastener pattern per FBC wind zones. Ref: FBC 110.3(3) Inspection was completed on 2026.10.08.
  • Confirms nail/screw spacing and panel installation per plans. Ref: FBC 110.3(3) Inspection was completed on 2026.10.08.
  • Verifies wall sheathing, nailing, and exterior strapping per wind-load requirements. Ref: FBC 110.3, 1609 Inspection was completed on 2026.11.02.
  • Reviews structural framing, load paths, fire blocking, and MEP rough-ins prior to insulation. Ref: FBC 110.3(3) Inspection was completed on 2026.11.02.
  • Checks wiring, panel placement, and boxes before cover-up. Ref: NEC Art. 110.3 Inspection was completed on 2026.11.02.
  • Reviews piping, venting, and fixtures before wall close. Ref: FBC-P 312 Inspection was completed on 2026.11.02.
  • Verifies water-tightness and slope before tile. Ref: FBC-P 312.9 Inspection was completed on 2026.11.02.
  • Checks ductwork, equipment location, and condensate before covering. Ref: FBC-M 603 Inspection was completed on 2026.11.02.
  • Verifies insulation type, R-value, and installation before drywall. Ref: FBC Energy C101.5 Inspection was completed on 2026.11.12.
  • Releases power once service equipment is complete and safe. Ref: NEC Art. 230
  • Ensures structure is complete, safe, and code-compliant before Certificate of Occupancy. Ref: FBC 110.5 Assessment is owed.
Enter a permit number above to see the inspections available for it.