Allows temporary power for construction use. Ref: NEC Art. 230
|
No Notice of Commencement on file.
|
|
|
Inspects footing size, depth, and reinforcing steel before concrete placement. Ref: FBC 110.3(1)
|
No Notice of Commencement on file.
|
|
|
Reviews sanitary sewer piping installation. Ref: FBC-P 312
|
Missing document Grading and Fill Report (volume, compaction, etc). Missing document Surveyor Letter Confirming Finished Floor Elevation. No Notice of Commencement on file.
|
|
|
Checks water service piping for pressure and sizing. Ref: FBC-P 312.5
|
Missing document Grading and Fill Report (volume, compaction, etc). Missing document Surveyor Letter Confirming Finished Floor Elevation. No Notice of Commencement on file.
|
|
|
Ensures proper base, vapor barrier, reinforcing, and termite treatment before pour. Ref: FBC 110.3(1)
|
No Notice of Commencement on file.
|
|
|
Inspects reinforcement, vapor barrier, termite treatment, and plumbing prior to pour. Ref: FBC 110.3(1)
|
No Notice of Commencement on file.
|
|
|
Confirms vertical and horizontal reinforcing per engineered plans. Ref: FBC 2122.2
|
No Notice of Commencement on file.
|
|
|
Reviews structural framing, load paths, fire blocking, and MEP rough-ins prior to insulation. Ref: FBC 110.3(3)
|
Missing document Grading and Fill Report (volume, compaction, etc). Missing document Surveyor Letter Confirming Finished Floor Elevation. No Notice of Commencement on file.
|
|
|
Checks roof sheathing attachment and fastener pattern per FBC wind zones. Ref: FBC 110.3(3)
|
Missing document Grading and Fill Report (volume, compaction, etc). Missing document Surveyor Letter Confirming Finished Floor Elevation. No Notice of Commencement on file.
|
|
|
Checks ductwork, equipment location, and condensate before covering. Ref: FBC-M 603
|
Missing document Grading and Fill Report (volume, compaction, etc). Missing document Surveyor Letter Confirming Finished Floor Elevation. No Notice of Commencement on file.
|
|
|
Verifies water-tightness and slope before tile. Ref: FBC-P 312.9
|
Missing document Grading and Fill Report (volume, compaction, etc). Missing document Surveyor Letter Confirming Finished Floor Elevation. No Notice of Commencement on file.
|
|
|
Confirms fire-related wall assemblies meet UL/FBC details and penetrations are properly sealed. Ref: FBC 703
|
Missing document Grading and Fill Report (volume, compaction, etc). Missing document Surveyor Letter Confirming Finished Floor Elevation. No Notice of Commencement on file.
|
|
|
Confirms rated wall assemblies meet fire-resistance standards. Ref: FBC 703
|
Missing document Grading and Fill Report (volume, compaction, etc). Missing document Surveyor Letter Confirming Finished Floor Elevation. No Notice of Commencement on file.
|
|
|
Verifies insulation type, R-value, and installation before drywall. Ref: FBC Energy C101.5
|
Missing document Grading and Fill Report (volume, compaction, etc). Missing document Surveyor Letter Confirming Finished Floor Elevation. No Notice of Commencement on file.
|
|
|
Ensures dampers and duct penetrations are properly installed. Ref: FBC-M 607
|
Missing document Grading and Fill Report (volume, compaction, etc). Missing document Surveyor Letter Confirming Finished Floor Elevation. No Notice of Commencement on file.
|
|
|
Confirms grease/oil interceptor installation and connections. Ref: FBC-P 1003
|
Missing document Grading and Fill Report (volume, compaction, etc). Missing document Surveyor Letter Confirming Finished Floor Elevation. No Notice of Commencement on file.
|
|
|
Inspects grease duct, clearances, and fire suppression tie-in. Ref: FBC-M 506
|
Missing document Grading and Fill Report (volume, compaction, etc). Missing document Surveyor Letter Confirming Finished Floor Elevation. No Notice of Commencement on file.
|
|
|
Confirms hood suppression system works. Ref: NFPA 96
|
Missing document Grading and Fill Report (volume, compaction, etc). Missing document Surveyor Letter Confirming Finished Floor Elevation. No Notice of Commencement on file.
|
|
|
Checks stucco lath, weep screeds, and moisture barriers before application. Ref: FBC 110.3
|
Missing document Grading and Fill Report (volume, compaction, etc). Missing document Surveyor Letter Confirming Finished Floor Elevation. No Notice of Commencement on file.
|
|
|
Ensures lintel/tie beam reinforcing steel and anchorage are correct before pour. Ref: FBC 110.3
|
Missing document Grading and Fill Report (volume, compaction, etc). Missing document Surveyor Letter Confirming Finished Floor Elevation. No Notice of Commencement on file.
|
|
|
Verifies fire alarm functionality. Ref: NFPA 72
|
Missing document Grading and Fill Report (volume, compaction, etc). Missing document Surveyor Letter Confirming Finished Floor Elevation. No Notice of Commencement on file.
|
|
|
Runs and verifies fire pump performance. Ref: NFPA 20
|
Missing document Grading and Fill Report (volume, compaction, etc). Missing document Surveyor Letter Confirming Finished Floor Elevation. No Notice of Commencement on file.
|
|
|
Flow test for sprinkler/standpipe system. Ref: NFPA 13/14
|
Missing document Grading and Fill Report (volume, compaction, etc). Missing document Surveyor Letter Confirming Finished Floor Elevation. No Notice of Commencement on file.
|
|
|
Ensures HVAC system airflow matches design. Ref: FBC Energy C403.2
|
Missing document Grading and Fill Report (volume, compaction, etc). Missing document Surveyor Letter Confirming Finished Floor Elevation. No Notice of Commencement on file.
|
|
|
Verifies refrigerant and condensate piping pressure integrity. Ref: FBC-M 1108
|
Missing document Grading and Fill Report (volume, compaction, etc). Missing document Surveyor Letter Confirming Finished Floor Elevation. No Notice of Commencement on file.
|
|
|
Checks roof drain and rain leader piping installation. Ref: FBC-P 1101
|
Missing document Grading and Fill Report (volume, compaction, etc). Missing document Surveyor Letter Confirming Finished Floor Elevation. No Notice of Commencement on file.
|
|
|
Verifies fastening and components for fire-rated walls, ceilings, or roofs. Ref: FBC 703
|
Missing document Grading and Fill Report (volume, compaction, etc). Missing document Surveyor Letter Confirming Finished Floor Elevation. No Notice of Commencement on file.
|
|
|
Inspects commercial refrigeration piping and systems. Ref: FBC-M 1108
|
Missing document Grading and Fill Report (volume, compaction, etc). Missing document Surveyor Letter Confirming Finished Floor Elevation. No Notice of Commencement on file.
|
|
|
Reviews hurricane straps, anchors, and connections, for uplift resistance. Ref: FBC 1609
|
Missing document Grading and Fill Report (volume, compaction, etc). Missing document Surveyor Letter Confirming Finished Floor Elevation. No Notice of Commencement on file.
|
|
|
Flushes underground water main. Ref: NFPA 25
|
No Notice of Commencement on file.
|
|
|
Hydrostatic test of underground fire main. Ref: NFPA 25
|
No Notice of Commencement on file.
|
|
|
Verifies underground piping installation. Ref: NFPA
|
No Notice of Commencement on file.
|
|
|
Checks filled masonry cells or columns for reinforcing and grout. Ref: FBC 2122.2
|
Missing document Grading and Fill Report (volume, compaction, etc). Missing document Surveyor Letter Confirming Finished Floor Elevation. No Notice of Commencement on file.
|
|
|
Confirms nail/screw spacing and panel installation per plans. Ref: FBC 110.3(3)
|
Missing document Grading and Fill Report (volume, compaction, etc). Missing document Surveyor Letter Confirming Finished Floor Elevation. No Notice of Commencement on file.
|
|
|
Conducted when required by the City to verify proper connection and availability of utility services. Ref: City of Lake City
|
No Notice of Commencement on file.
|
|
|
Releases power once service equipment is complete and safe. Ref: NEC Art. 230
|
Missing document Grading and Fill Report (volume, compaction, etc). Missing document Surveyor Letter Confirming Finished Floor Elevation. No Notice of Commencement on file.
|
|
|
Full review of fire systems before occupancy. Ref: FBC 907
|
Missing document Grading and Fill Report (volume, compaction, etc). Missing document Surveyor Letter Confirming Finished Floor Elevation. No Notice of Commencement on file.
|
|
|
Ensures all zoning-related site requirements (buffers, landscaping, setbacks, parking) are satisfied before CO.
Columbia County LDR
|
Missing document As-Built Survey. Assessment is owed. No Notice of Commencement on file.
|
|
|
Ensures structure is complete, safe, and code-compliant before Certificate of Occupancy. Ref: FBC 110.5
|
Missing document As-Built Survey. Assessment is owed. No Notice of Commencement on file.
|