Inspects footing size, depth, and reinforcing steel before concrete placement. Ref: FBC 110.3(1)
Inspection was completed on 2026.06.16.
-
Verifies conduit, wiring, and grounding prior to backfill. Ref: NEC Art. 300.5
-
Inspects drainage and water piping before backfill. Ref: FBC-P 312
Inspection was completed on 2026.07.30.
-
Ensures proper base, vapor barrier, reinforcing, and termite treatment before pour. Ref: FBC 110.3(1)
Inspection was completed on 2026.08.03.
-
Checks roof sheathing attachment and fastener pattern per FBC wind zones. Ref: FBC 110.3(3)
Inspection was completed on 2026.10.15.
-
Confirms nail/screw spacing and panel installation per plans. Ref: FBC 110.3(3)
Inspection was completed on 2026.10.15.
-
Verifies wall sheathing, nailing, and exterior strapping per wind-load requirements. Ref: FBC 110.3, 1609
Inspection was completed on 2026.10.15.
-
Reviews structural framing, load paths, fire blocking, and MEP rough-ins prior to insulation. Ref: FBC 110.3(3)
Inspection was completed on 2026.10.20.
-
Checks wiring, panel placement, and boxes before cover-up. Ref: NEC Art. 110.3
Inspection was completed on 2026.10.15.
-
Checks ductwork, equipment location, and condensate before covering. Ref: FBC-M 603
-
Reviews piping, venting, and fixtures before wall close. Ref: FBC-P 312
Inspection was completed on 2026.10.15.
-
Verifies insulation type, R-value, and installation before drywall. Ref: FBC Energy C101.5
Inspection was completed on 2026.10.23.
-
Releases power once service equipment is complete and safe. Ref: NEC Art. 230
-
Ensures structure is complete, safe, and code-compliant before Certificate of Occupancy. Ref: FBC 110.5
Enter a permit number above to see the inspections available for it.
- 1 Choose inspections
- 2 Review & confirm
- 3 Done
Confirm your request: Schedule Inspections
Please check the details below. Nothing is sent until you confirm.
- Permit number
- Inspection date
- Contact phone
- Special instructions
- Inspections
- 1 Choose inspections
- 2 Review & confirm
- 3 Done
Your request has been submitted
Building and Zoning has received it. You can request or cancel more inspections at any time.
Loading inspections…