Inspection Request

Schedule a new inspection for your permit, or cancel one you have already scheduled.

  • Monday–Friday only
  • Requests after 5 PM can’t be for the next day
  • One active request per inspection
  1. Choose inspections
  2. Review & confirm
  3. Done

Request to Schedule Inspections

Enter your permit number, then tell us what you’d like to do.

Press Enter or tab out of the field to load this permit’s inspections.

New Commercial Construction 116 NW LAWTEY WAY LAKE CITY, FL 32055

Date & contact

Tell us when you need the inspector and how to reach you.

Select inspections

Check each inspection you need. An inspection that is already scheduled can’t be requested again until it is cancelled.

  • Allows temporary power for construction use. Ref: NEC Art. 230
  • Verifies conduit, wiring, and grounding prior to backfill. Ref: NEC Art. 300.5
  • Inspects drainage and water piping before backfill. Ref: FBC-P 312 Inspection was completed on 2026.06.16.
  • Inspects footing size, depth, and reinforcing steel before concrete placement. Ref: FBC 110.3(1)
  • Inspects reinforcement, vapor barrier, termite treatment, and plumbing prior to pour. Ref: FBC 110.3(1)
  • Checks roof sheathing attachment and fastener pattern per FBC wind zones. Ref: FBC 110.3(3) Inspection was completed on 2026.09.23.
  • Confirms nail/screw spacing and panel installation per plans. Ref: FBC 110.3(3) Missing document Surveyor Letter Confirming Finished Floor Elevation.
  • Reviews structural framing, load paths, fire blocking, and MEP rough-ins prior to insulation. Ref: FBC 110.3(3) Inspection was completed on 2026.09.23.
  • Checks wiring, panel placement, and boxes before cover-up. Ref: NEC Art. 110.3 Missing document Surveyor Letter Confirming Finished Floor Elevation.
  • Reviews piping, venting, and fixtures before wall close. Ref: FBC-P 312 Missing document Surveyor Letter Confirming Finished Floor Elevation.
  • Checks ductwork, equipment location, and condensate before covering. Ref: FBC-M 603 Missing document Surveyor Letter Confirming Finished Floor Elevation.
  • Verifies insulation type, R-value, and installation before drywall. Ref: FBC Energy C101.5 Missing document Surveyor Letter Confirming Finished Floor Elevation.
  • Releases power once service equipment is complete and safe. Ref: NEC Art. 230 Missing document Surveyor Letter Confirming Finished Floor Elevation.
  • Ensures structure is complete, safe, and code-compliant before Certificate of Occupancy. Ref: FBC 110.5
  • Ensures all zoning-related site requirements (buffers, landscaping, setbacks, parking) are satisfied before CO. Columbia County LDR
Enter a permit number above to see the inspections available for it.