Building & Zoning

Inspection Request

Schedule a new inspection for your permit, or cancel one you have already scheduled.

  • Monday–Friday only
  • Requests after 5 PM can’t be for the next day
  • One active request per inspection
  1. Choose inspections
  2. Review & confirm
  3. Done

Request to Schedule Inspections

Enter your permit number, then tell us what you’d like to do.

Press Enter or tab out of the field to load this permit’s inspections.

New Residential Construction 188 NW ABRAHM PL WHITE SPRINGS, FL 32096

Date & contact

Tell us when you need the inspector and how to reach you.

Select inspections

Check each inspection you need. An inspection that is already scheduled can’t be requested again until it is cancelled.

* The final inspection cannot be requested because the assessment fees are owed on this property. Other inspections can still be requested. * Final inspection not available until "As-Built Survey" has been received.
  • Allows temporary power for construction use. Ref: NEC Art. 230
  • Verifies conduit, wiring, and grounding prior to backfill. Ref: NEC Art. 300.5
  • Inspects drainage and water piping before backfill. Ref: FBC-P 312 Inspection was completed on 2026.06.23.
  • Inspects reinforcement, vapor barrier, termite treatment, and plumbing prior to pour. Ref: FBC 110.3(1) Inspection was completed on 2026.07.07.
  • Checks roof sheathing attachment and fastener pattern per FBC wind zones. Ref: FBC 110.3(3)
  • Confirms nail/screw spacing and panel installation per plans. Ref: FBC 110.3(3)
  • Verifies wall sheathing, nailing, and exterior strapping per wind-load requirements. Ref: FBC 110.3, 1609
  • Reviews structural framing, load paths, fire blocking, and MEP rough-ins prior to insulation. Ref: FBC 110.3(3) Inspection was completed on 2026.08.12.
  • Checks wiring, panel placement, and boxes before cover-up. Ref: NEC Art. 110.3 Inspection was completed on 2026.08.12.
  • Checks ductwork, equipment location, and condensate before covering. Ref: FBC-M 603 Inspection was completed on 2026.08.12.
  • Reviews piping, venting, and fixtures before wall close. Ref: FBC-P 312 Inspection was completed on 2026.08.12.
  • Verifies water-tightness and slope before tile. Ref: FBC-P 312.9
  • Verifies insulation type, R-value, and installation before drywall. Ref: FBC Energy C101.5 Inspection was completed on 2026.08.24.
  • Releases power once service equipment is complete and safe. Ref: NEC Art. 230
  • Ensures structure is complete, safe, and code-compliant before Certificate of Occupancy. Ref: FBC 110.5 Missing document As-Built Survey.
    Assessment is owed.
    Missing required documents.
Enter a permit number above to see the inspections available for it.