Building & Zoning

Inspection Request

Schedule a new inspection for your permit, or cancel one you have already scheduled.

  • Monday–Friday only
  • Requests after 5 PM can’t be for the next day
  • One active request per inspection
  1. Choose inspections
  2. Review & confirm
  3. Done

Request to Schedule Inspections

Enter your permit number, then tell us what you’d like to do.

Press Enter or tab out of the field to load this permit’s inspections.

Electrical Service - NEW (DO NOT use for Service Upgrade or Generator Install) 169 NW DALTON GLN LAKE CITY, FL 32055

Date & contact

Tell us when you need the inspector and how to reach you.

Select inspections

Check each inspection you need. An inspection that is already scheduled can’t be requested again until it is cancelled.

  • Inspects system before re-energizing an existing service. Ref: NEC Art. 230
  • Reviews upgraded service panel, grounding, and clearances. Ref: NEC Art. 230
  • Verifies pole, meter, and service conductors for compliance. Ref: NEC Art. 230
  • Verifies location, layout, culvert size, and grade before driveway construction begins. ROW Access/Driveway connects to county maintained road must be passed prior to scheduling.
  • Approves finished driveway, verifying pavement, culvert, drainage, mitered ends, and safety compliance. Ref: Columbia County LDR 4.2.3 Initial Driveway must be passed prior to scheduling.Initial Driveway must be passed on a Right-of-Way Access/Driveway prior to scheduling.
Enter a permit number above to see the inspections available for it.