|
|
Allows temporary power for construction use. Ref: NEC Art. 230
|
|
|
|
Verifies conduit, wiring, and grounding prior to backfill. Ref: NEC Art. 300.5
|
Inspection was completed on 2026.05.14.
|
|
|
Inspects drainage and water piping before backfill. Ref: FBC-P 312
|
Inspection was completed on 2026.05.08.
|
|
|
Inspects footing size, depth, and reinforcing steel before concrete placement. Ref: FBC 110.3(1)
|
This inspection has already been scheduled on 2026.05.15
|
|
|
Inspects reinforcement, vapor barrier, termite treatment, and plumbing prior to pour. Ref: FBC 110.3(1)
|
This inspection has already been scheduled on 2026.05.15
|
|
|
Checks roof sheathing attachment and fastener pattern per FBC wind zones. Ref: FBC 110.3(3)
|
|
|
|
Reviews structural framing, load paths, fire blocking, and MEP rough-ins prior to insulation. Ref: FBC 110.3(3)
|
|
|
|
Confirms rated wall assemblies meet fire-resistance standards. Ref: FBC 703
|
|
|
|
Confirms fire-related wall assemblies meet UL/FBC details and penetrations are properly sealed. Ref: FBC 703
|
|
|
|
Ensures dampers and duct penetrations are properly installed. Ref: FBC-M 607
|
|
|
|
Verifies fastening and components for fire-rated walls, ceilings, or roofs. Ref: FBC 703
|
|
|
|
Checks ductwork, equipment location, and condensate before covering. Ref: FBC-M 603
|
|
|
|
Checks wiring, panel placement, and boxes before cover-up. Ref: NEC Art. 110.3
|
|
|
|
Reviews piping, venting, and fixtures before wall close. Ref: FBC-P 312
|
|
|
|
Verifies water-tightness and slope before tile. Ref: FBC-P 312.9
|
|
|
|
Full review of fire systems before occupancy. Ref: FBC 907
|
|
|
|
Verifies insulation type, R-value, and installation before drywall. Ref: FBC Energy C101.5
|
|
|
|
Verifies fire alarm functionality. Ref: NFPA 72
|
|
|
|
Flow test for sprinkler/standpipe system. Ref: NFPA 13/14
|
|
|
|
Flushes underground water main. Ref: NFPA 25
|
|
|
|
Hydrostatic test of underground fire main. Ref: NFPA 25
|
|
|
|
Verifies underground piping installation. Ref: NFPA
|
|
|
|
Conducted when required by the City to verify proper connection and availability of utility services. Ref: City of Lake City
|
|
|
|
Releases power once service equipment is complete and safe. Ref: NEC Art. 230
|
Lake City Utilities Tap Inspection must be passed prior to scheduling.
|
|
|
Ensures structure is complete, safe, and code-compliant before Certificate of Occupancy. Ref: FBC 110.5
|
|
|
|
Ensures all zoning-related site requirements (buffers, landscaping, setbacks, parking) are satisfied before CO.
Columbia County LDR
|
This inspection has already been scheduled on 2026.05.15
|