Allows temporary power for construction use. Ref: NEC Art. 230
|
Inspection was completed on 2026.04.10.
|
|
|
Inspects footing size, depth, and reinforcing steel before concrete placement. Ref: FBC 110.3(1)
|
|
|
|
Reviews sanitary sewer piping installation. Ref: FBC-P 312
|
Missing document Surveyor Letter Confirming Finished Floor Elevation.
|
|
|
Checks water service piping for pressure and sizing. Ref: FBC-P 312.5
|
Missing document Surveyor Letter Confirming Finished Floor Elevation.
|
|
|
Ensures proper base, vapor barrier, reinforcing, and termite treatment before pour. Ref: FBC 110.3(1)
|
|
|
|
Checks roof sheathing attachment and fastener pattern per FBC wind zones. Ref: FBC 110.3(3)
|
Missing document Surveyor Letter Confirming Finished Floor Elevation.
|
|
|
Confirms nail/screw spacing and panel installation per plans. Ref: FBC 110.3(3)
|
Missing document Surveyor Letter Confirming Finished Floor Elevation.
|
|
|
Reviews structural framing, load paths, fire blocking, and MEP rough-ins prior to insulation. Ref: FBC 110.3(3)
|
Missing document Surveyor Letter Confirming Finished Floor Elevation.
|
|
|
Checks wiring, panel placement, and boxes before cover-up. Ref: NEC Art. 110.3
|
Missing document Surveyor Letter Confirming Finished Floor Elevation.
|
|
|
Checks ductwork, equipment location, and condensate before covering. Ref: FBC-M 603
|
Missing document Surveyor Letter Confirming Finished Floor Elevation.
|
|
|
Reviews piping, venting, and fixtures before wall close. Ref: FBC-P 312
|
Missing document Surveyor Letter Confirming Finished Floor Elevation.
|
|
|
Verifies water-tightness and slope before tile. Ref: FBC-P 312.9
|
Missing document Surveyor Letter Confirming Finished Floor Elevation.
|
|
|
Verifies insulation type, R-value, and installation before drywall. Ref: FBC Energy C101.5
|
Missing document Surveyor Letter Confirming Finished Floor Elevation.
|
|
|
Conducted when required by the City to verify proper connection and availability of utility services. Ref: City of Lake City
|
|
|
|
Releases power once service equipment is complete and safe. Ref: NEC Art. 230
|
Missing document Surveyor Letter Confirming Finished Floor Elevation.
|
|
|
Ensures all zoning-related site requirements (buffers, landscaping, setbacks, parking) are satisfied before CO.
Columbia County LDR
|
Assessment is owed.
|
|
|
Full review of fire systems before occupancy. Ref: FBC 907
|
Missing document Surveyor Letter Confirming Finished Floor Elevation.
|
|
|
Ensures driveway construction complies with Florida Department of Transportation standards when accessing a state-maintained road. Ref: FDOT Standard Index, Columbia County LDR 4.2.3
|
|
|
|
Ensures structure is complete, safe, and code-compliant before Certificate of Occupancy. Ref: FBC 110.5
|
Assessment is owed. D.O.T Final Driveway must be passed prior to scheduling.
|