Allows temporary power for construction use. Ref: NEC Art. 230
|
Inspection was completed on 2025.10.14.
|
|
|
Verifies location, layout, culvert size, and grade before driveway construction begins.
|
|
|
|
Inspects footing size, depth, and reinforcing steel before concrete placement. Ref: FBC 110.3(1)
|
Inspection was completed on 2026.03.10.
|
|
|
Approves finished driveway, verifying pavement, culvert, drainage, mitered ends, and safety compliance. Ref: Columbia County LDR 4.2.3
|
Assessment is owed. Initial Driveway must be passed prior to scheduling.Initial Driveway must be passed on a Right-of-Way Access/Driveway prior to scheduling.
|
|
|
Verifies conduit, wiring, and grounding prior to backfill. Ref: NEC Art. 300.5
|
|
|
|
Inspects drainage and water piping before backfill. Ref: FBC-P 312
|
Inspection was completed on 2026.04.23.
|
|
|
Ensures proper base, vapor barrier, reinforcing, and termite treatment before pour. Ref: FBC 110.3(1)
|
|
|
|
Checks filled masonry cells or columns for reinforcing and grout. Ref: FBC 2122.2
|
|
|
|
Confirms vertical and horizontal reinforcing per engineered plans. Ref: FBC 2122.2
|
|
|
|
Ensures lintel/tie beam reinforcing steel and anchorage are correct before pour. Ref: FBC 110.3
|
|
|
|
Checks roof sheathing attachment and fastener pattern per FBC wind zones. Ref: FBC 110.3(3)
|
|
|
|
Reviews piping, venting, and fixtures before wall close. Ref: FBC-P 312
|
|
|
|
Verifies water-tightness and slope before tile. Ref: FBC-P 312.9
|
|
|
|
Checks ductwork, equipment location, and condensate before covering. Ref: FBC-M 603
|
|
|
|
Checks wiring, panel placement, and boxes before cover-up. Ref: NEC Art. 110.3
|
|
|
|
Reviews structural framing, load paths, fire blocking, and MEP rough-ins prior to insulation. Ref: FBC 110.3(3)
|
|
|
|
Verifies insulation type, R-value, and installation before drywall. Ref: FBC Energy C101.5
|
|
|
|
Checks stucco lath, weep screeds, and moisture barriers before application. Ref: FBC 110.3
|
|
|
|
Releases power once service equipment is complete and safe. Ref: NEC Art. 230
|
|
|
|
Ensures structure is complete, safe, and code-compliant before Certificate of Occupancy. Ref: FBC 110.5
|
Assessment is owed.
|