Inspection Request

Request to Schedule Inspections — Step 1 of 2

Remodel

162 SW SPENCER CT LAKE CITY, FL 32024

Inspections not allowed. Contact Building Dept.

Select Inspections

Select Inspection Type Notes / Requirements
Inspects drainage and water piping before backfill. Ref: FBC-P 312 Inspections not allowed. Contact Building Dept.
Reviews piping, venting, and fixtures before wall close. Ref: FBC-P 312 Inspection was completed on 2026.04.28.
Inspections not allowed. Contact Building Dept.
Checks wiring, panel placement, and boxes before cover-up. Ref: NEC Art. 110.3 Inspection was completed on 2026.04.28.
Inspections not allowed. Contact Building Dept.
Inspects conduit, junctions, and wiring above ceilings before close-up. Ref: NEC Art. 300.11 Inspections not allowed. Contact Building Dept.
Pressure test of sprinkler piping aboveground. Ref: NFPA 13 §25.2 Inspections not allowed. Contact Building Dept.
Visual review of aboveground sprinkler piping layout. Ref: NFPA 13 §8.6 Inspections not allowed. Contact Building Dept.
Verifies wall sheathing, nailing, and exterior strapping per wind-load requirements. Ref: FBC 110.3, 1609 Inspections not allowed. Contact Building Dept.
Full review of fire systems before occupancy. Ref: FBC 907 Inspections not allowed. Contact Building Dept.
Confirms fire-related wall assemblies meet UL/FBC details and penetrations are properly sealed. Ref: FBC 703 Inspections not allowed. Contact Building Dept.
Confirms rated wall assemblies meet fire-resistance standards. Ref: FBC 703 Inspections not allowed. Contact Building Dept.
Inspects footing size, depth, and reinforcing steel before concrete placement. Ref: FBC 110.3(1) Inspections not allowed. Contact Building Dept.
Reviews structural framing, load paths, fire blocking, and MEP rough-ins prior to insulation. Ref: FBC 110.3(3) Inspection was completed on 2026.04.28.
Inspections not allowed. Contact Building Dept.
Ensures dampers and duct penetrations are properly installed. Ref: FBC-M 607 Inspections not allowed. Contact Building Dept.
Inspects fire safety, anchoring, and venting of fuel tanks. Ref: NFPA 30 Inspections not allowed. Contact Building Dept.
Tests hydrant water flow and pressure. Ref: NFPA 14 Inspections not allowed. Contact Building Dept.
Verifies insulation type, R-value, and installation before drywall. Ref: FBC Energy C101.5 Inspections not allowed. Contact Building Dept.
Confirms grease/oil interceptor installation and connections. Ref: FBC-P 1003 Inspections not allowed. Contact Building Dept.
Inspects grease duct, clearances, and fire suppression tie-in. Ref: FBC-M 506 Inspections not allowed. Contact Building Dept.
Confirms hood suppression system works. Ref: NFPA 96 Inspections not allowed. Contact Building Dept.
Checks stucco lath, weep screeds, and moisture barriers before application. Ref: FBC 110.3 Inspections not allowed. Contact Building Dept.
Confirms duct/shaft tightness by testing for air-leakage. Ref: FBC-M 603.9 Inspections not allowed. Contact Building Dept.
Inspects smoke/shaft tightness by light test. Ref: FBC 907.5 Inspections not allowed. Contact Building Dept.
Ensures lintel/tie beam reinforcing steel and anchorage are correct before pour. Ref: FBC 110.3 Inspections not allowed. Contact Building Dept.
Confirms vertical and horizontal reinforcing per engineered plans. Ref: FBC 2122.2 Inspections not allowed. Contact Building Dept.
Ensures medical gas piping is properly installed and tested. Ref: NFPA 99 Inspections not allowed. Contact Building Dept.
Verifies fire alarm functionality. Ref: NFPA 72 Inspections not allowed. Contact Building Dept.
Tests special hazard extinguishing system. Ref: NFPA 4 Inspections not allowed. Contact Building Dept.
Runs and verifies fire pump performance. Ref: NFPA 20 Inspections not allowed. Contact Building Dept.
Flow test for sprinkler/standpipe system. Ref: NFPA 13/14 Inspections not allowed. Contact Building Dept.
Ensures HVAC system airflow matches design. Ref: FBC Energy C403.2 Inspections not allowed. Contact Building Dept.
Releases power once service equipment is complete and safe. Ref: NEC Art. 230 Inspections not allowed. Contact Building Dept.
Verifies refrigerant and condensate piping pressure integrity. Ref: FBC-M 1108 Inspections not allowed. Contact Building Dept.
Checks roof drain and rain leader piping installation. Ref: FBC-P 1101 Inspections not allowed. Contact Building Dept.
Verifies fastening and components for fire-rated walls, ceilings, or roofs. Ref: FBC 703 Inspections not allowed. Contact Building Dept.
Inspects commercial refrigeration piping and systems. Ref: FBC-M 1108 Inspections not allowed. Contact Building Dept.
Checks roof sheathing attachment and fastener pattern per FBC wind zones. Ref: FBC 110.3(3) Inspections not allowed. Contact Building Dept.
Checks ductwork, equipment location, and condensate before covering. Ref: FBC-M 603 Inspections not allowed. Contact Building Dept.
Reviews sanitary sewer piping installation. Ref: FBC-P 312 Inspections not allowed. Contact Building Dept.
Ensures proper base, vapor barrier, reinforcing, and termite treatment before pour. Ref: FBC 110.3(1) Inspections not allowed. Contact Building Dept.
Inspects modified sprinkler system installation. Ref: NFPA 13 §25.2 Inspections not allowed. Contact Building Dept.
Verifies water-tightness and slope before tile. Ref: FBC-P 312.9 Inspections not allowed. Contact Building Dept.
Flushes underground water main. Ref: NFPA 25 Inspections not allowed. Contact Building Dept.
Hydrostatic test of underground fire main. Ref: NFPA 25 Inspections not allowed. Contact Building Dept.
Verifies underground piping installation. Ref: NFPA Inspections not allowed. Contact Building Dept.
Checks filled masonry cells or columns for reinforcing and grout. Ref: FBC 2122.2 Inspections not allowed. Contact Building Dept.
Confirms nail/screw spacing and panel installation per plans. Ref: FBC 110.3(3) Inspections not allowed. Contact Building Dept.
Checks water service piping for pressure and sizing. Ref: FBC-P 312.5 Inspections not allowed. Contact Building Dept.
Verifies fastening of windows/doors for impact and wind load compliance. Ref: FBCR 609 Inspections not allowed. Contact Building Dept.
Ensures all zoning-related site requirements (buffers, landscaping, setbacks, parking) are satisfied before CO. Columbia County LDR Inspections not allowed. Contact Building Dept.
Ensures structure is complete, safe, and code-compliant before Certificate of Occupancy. Ref: FBC 110.5 Inspections not allowed. Contact Building Dept.

Message

Contact Us

Building Department

Office Hours

Monday-Friday
8:00 A.M. - 4:30 P.M.

Contact Information

Phone: 386-758-1008
Fax: 386-758-2160

Email: bldginfo@columbiacountyfla.com

Location

135 NE Hernando Ave.
Lake City, FL 32055 (opens in new window)

Mailing Address

P.O. Box 1529
Lake City, FL 32056-1529

Public Records

Public records policy and fees

Board of County Commissioners
Tel. (386) 758-1326
Fax: (386) 758-2182
Email: publicrecords@columbiacountyfla.com

Mailing Address:
P.O. Box 1529
Lake City, FL 32056-1529

Citizen Feedback

Let us know how we're doing

ADA Accessibility

Columbia County is committed to ensuring accessibility to this website regardless of disability. If anyone encounters a feature on this website that is inaccessible due to a disability, please contact the Columbia County ADA Coordinator at (386) 758-3344. You may also email that office at hr@columbiacountyfla.com and provide a brief description of the inaccessible feature.

Columbia County strives to provide reasonable accommodations to help people with disabilities have an equal opportunity to participate in our public meetings. Please notify our ADA Coordinator at least 48 hours prior to the public meeting by calling (386) 758-3344.