Verifies conduit, wiring, and grounding prior to backfill. Ref: NEC Art. 300.5
-
Inspects drainage and water piping before backfill. Ref: FBC-P 312
Inspection was completed on 2025.09.30.
-
Reviews piping, venting, and fixtures before wall close. Ref: FBC-P 312
Inspection was completed on 2026.09.17.
-
Checks wiring, panel placement, and boxes before cover-up. Ref: NEC Art. 110.3
Inspection was completed on 2026.09.17.
-
Ensures driveway construction complies with Florida Department of Transportation standards when accessing a state-maintained road. Ref: FDOT Standard Index, Columbia County LDR 4.2.3
-
Verifies wall sheathing, nailing, and exterior strapping per wind-load requirements. Ref: FBC 110.3, 1609
-
Confirms fire-related wall assemblies meet UL/FBC details and penetrations are properly sealed. Ref: FBC 703
-
Inspects footing size, depth, and reinforcing steel before concrete placement. Ref: FBC 110.3(1)
Inspection was completed on 2025.09.17.
-
Reviews structural framing, load paths, fire blocking, and MEP rough-ins prior to insulation. Ref: FBC 110.3(3)
Inspection was completed on 2026.09.17.
-
Verifies insulation type, R-value, and installation before drywall. Ref: FBC Energy C101.5
Inspection was completed on 2026.09.21.
-
Checks stucco lath, weep screeds, and moisture barriers before application. Ref: FBC 110.3
-
Ensures lintel/tie beam reinforcing steel and anchorage are correct before pour. Ref: FBC 110.3
-
Confirms vertical and horizontal reinforcing per engineered plans. Ref: FBC 2122.2
-
Inspects reinforcement, vapor barrier, termite treatment, and plumbing prior to pour. Ref: FBC 110.3(1)
-
Verifies fastening and components for fire-rated walls, ceilings, or roofs. Ref: FBC 703
-
Checks roof sheathing attachment and fastener pattern per FBC wind zones. Ref: FBC 110.3(3)
Inspection was completed on 2026.08.27.
-
Checks ductwork, equipment location, and condensate before covering. Ref: FBC-M 603
Inspection was completed on 2026.09.17.
-
Ensures proper base, vapor barrier, reinforcing, and termite treatment before pour. Ref: FBC 110.3(1)
Inspection was completed on 2025.10.03.
-
Reviews hurricane straps, anchors, and connections, for uplift resistance. Ref: FBC 1609
Inspection was completed on 2026.09.17.
-
Allows temporary power for construction use. Ref: NEC Art. 230
-
Verifies water-tightness and slope before tile. Ref: FBC-P 312.9
-
Checks filled masonry cells or columns for reinforcing and grout. Ref: FBC 2122.2
-
Confirms nail/screw spacing and panel installation per plans. Ref: FBC 110.3(3)
Inspection was completed on 2026.08.27.
-
Verifies fastening of windows/doors for impact and wind load compliance. Ref: FBCR 609
-
Ensures structure is complete, safe, and code-compliant before Certificate of Occupancy. Ref: FBC 110.5
Assessment is owed.
-
Releases power once service equipment is complete and safe. Ref: NEC Art. 230