Schedule a new inspection for your permit, or cancel one you have already scheduled.

  • Monday–Friday only
  • Requests after 5 PM can’t be for the next day
  • One active request per inspection
  1. Choose inspections
  2. Review & confirm
  3. Done

Request to Schedule Inspections

Enter your permit number, then tell us what you’d like to do.

Press Enter or tab out of the field to load this permit’s inspections.

Storage Building 2982 SW COUNTY ROAD 18 FORT WHITE, FL 32038

Date & contact

Tell us when you need the inspector and how to reach you.

Select inspections

Check each inspection you need. An inspection that is already scheduled can’t be requested again until it is cancelled.

  • Inspects footing size, depth, and reinforcing steel before concrete placement. Ref: FBC 110.3(1)
  • Verifies conduit, wiring, and grounding prior to backfill. Ref: NEC Art. 300.5
  • Inspects drainage and water piping before backfill. Ref: FBC-P 312 Inspection was completed on 2024.09.11.
  • Ensures proper base, vapor barrier, reinforcing, and termite treatment before pour. Ref: FBC 110.3(1) Inspection was completed on 2024.09.13.
  • Inspects reinforcement, vapor barrier, termite treatment, and plumbing prior to pour. Ref: FBC 110.3(1)
  • Reviews structural framing, load paths, fire blocking, and MEP rough-ins prior to insulation. Ref: FBC 110.3(3)
  • Verifies wall sheathing, nailing, and exterior strapping per wind-load requirements. Ref: FBC 110.3, 1609
  • Confirms nail/screw spacing and panel installation per plans. Ref: FBC 110.3(3)
  • Verifies insulation type, R-value, and installation before drywall. Ref: FBC Energy C101.5
  • Ensures lintel/tie beam reinforcing steel and anchorage are correct before pour. Ref: FBC 110.3
  • Confirms vertical and horizontal reinforcing per engineered plans. Ref: FBC 2122.2
  • Checks roof sheathing attachment and fastener pattern per FBC wind zones. Ref: FBC 110.3(3)
  • Checks filled masonry cells or columns for reinforcing and grout. Ref: FBC 2122.2
  • Checks wiring, panel placement, and boxes before cover-up. Ref: NEC Art. 110.3
  • Allows temporary power for construction use. Ref: NEC Art. 230
  • Reviews piping, venting, and fixtures before wall close. Ref: FBC-P 312
  • Ensures structure is complete, safe, and code-compliant before Certificate of Occupancy. Ref: FBC 110.5
  • Releases power once service equipment is complete and safe. Ref: NEC Art. 230 Inspection was completed on 2026.11.02.
Enter a permit number above to see the inspections available for it.