Building & Zoning

Inspection Request

Schedule a new inspection for your permit, or cancel one you have already scheduled.

  • Monday–Friday only
  • Requests after 5 PM can’t be for the next day
  • One active request per inspection
  1. Choose inspections
  2. Review & confirm
  3. Done

Request to Schedule Inspections

Enter your permit number, then tell us what you’d like to do.

Press Enter or tab out of the field to load this permit’s inspections.

New Commercial Construction 8255 SW US HIGHWAY 27 FORT WHITE, FL 32038

Date & contact

Tell us when you need the inspector and how to reach you.

Select inspections

Check each inspection you need. An inspection that is already scheduled can’t be requested again until it is cancelled.

* The final inspection cannot be requested because the assessment fees are owed on this property. Other inspections can still be requested.
  • Allows temporary power for construction use. Ref: NEC Art. 230 Inspection was completed on 2026.07.20.
  • Verifies conduit, wiring, and grounding prior to backfill. Ref: NEC Art. 300.5 Inspection was completed on 2026.07.20.
  • Inspects drainage and water piping before backfill. Ref: FBC-P 312 Inspection was completed on 2026.07.15.
  • Inspects reinforcement, vapor barrier, termite treatment, and plumbing prior to pour. Ref: FBC 110.3(1)
  • Reviews structural framing, load paths, fire blocking, and MEP rough-ins prior to insulation. Ref: FBC 110.3(3)
  • Confirms fire-related wall assemblies meet UL/FBC details and penetrations are properly sealed. Ref: FBC 703
  • Confirms rated wall assemblies meet fire-resistance standards. Ref: FBC 703
  • Reviews piping, venting, and fixtures before wall close. Ref: FBC-P 312
  • Checks wiring, panel placement, and boxes before cover-up. Ref: NEC Art. 110.3
  • Inspects conduit, junctions, and wiring above ceilings before close-up. Ref: NEC Art. 300.11
  • Verifies insulation type, R-value, and installation before drywall. Ref: FBC Energy C101.5
  • Ensures driveway construction complies with Florida Department of Transportation standards when accessing a state-maintained road. Ref: FDOT Standard Index, Columbia County LDR 4.2.3
  • Releases power once service equipment is complete and safe. Ref: NEC Art. 230
  • Ensures structure is complete, safe, and code-compliant before Certificate of Occupancy. Ref: FBC 110.5 Assessment is owed.
  • Full review of fire systems before occupancy. Ref: FBC 907
  • Ensures all zoning-related site requirements (buffers, landscaping, setbacks, parking) are satisfied before CO. Columbia County LDR Assessment is owed.
Enter a permit number above to see the inspections available for it.