|
|
Allows temporary power for construction use. Ref: NEC Art. 230
|
|
|
|
Verifies conduit, wiring, and grounding prior to backfill. Ref: NEC Art. 300.5
|
|
|
|
Inspects drainage and water piping before backfill. Ref: FBC-P 312
|
|
|
|
Inspects reinforcement, vapor barrier, termite treatment, and plumbing prior to pour. Ref: FBC 110.3(1)
|
|
|
|
Reviews structural framing, load paths, fire blocking, and MEP rough-ins prior to insulation. Ref: FBC 110.3(3)
|
|
|
|
Confirms fire-related wall assemblies meet UL/FBC details and penetrations are properly sealed. Ref: FBC 703
|
|
|
|
Confirms rated wall assemblies meet fire-resistance standards. Ref: FBC 703
|
|
|
|
Reviews piping, venting, and fixtures before wall close. Ref: FBC-P 312
|
|
|
|
Checks wiring, panel placement, and boxes before cover-up. Ref: NEC Art. 110.3
|
|
|
|
Inspects conduit, junctions, and wiring above ceilings before close-up. Ref: NEC Art. 300.11
|
|
|
|
Verifies insulation type, R-value, and installation before drywall. Ref: FBC Energy C101.5
|
|
|
|
Ensures driveway construction complies with Florida Department of Transportation standards when accessing a state-maintained road. Ref: FDOT Standard Index, Columbia County LDR 4.2.3
|
|
|
|
Releases power once service equipment is complete and safe. Ref: NEC Art. 230
|
|
|
|
Ensures structure is complete, safe, and code-compliant before Certificate of Occupancy. Ref: FBC 110.5
|
Assessment is owed.
|
|
|
Full review of fire systems before occupancy. Ref: FBC 907
|
|
|
|
Ensures all zoning-related site requirements (buffers, landscaping, setbacks, parking) are satisfied before CO.
Columbia County LDR
|
Assessment is owed.
|