Inspection Request

Request to Schedule Inspections — Step 1 of 2

Remodel

2932 N. US HIGHWAY 441 LAKE CITY, FL 32055

Select Inspections

Select Inspection Type Notes / Requirements
Inspects drainage and water piping before backfill. Ref: FBC-P 312 Inspection was completed on 2021.01.20.
Reviews piping, venting, and fixtures before wall close. Ref: FBC-P 312 Inspection was completed on 2023.01.19.
Checks wiring, panel placement, and boxes before cover-up. Ref: NEC Art. 110.3
Inspects conduit, junctions, and wiring above ceilings before close-up. Ref: NEC Art. 300.11 Inspection was completed on 2024.01.17.
Pressure test of sprinkler piping aboveground. Ref: NFPA 13 §25.2
Visual review of aboveground sprinkler piping layout. Ref: NFPA 13 §8.6
Verifies wall sheathing, nailing, and exterior strapping per wind-load requirements. Ref: FBC 110.3, 1609
Full review of fire systems before occupancy. Ref: FBC 907
Confirms fire-related wall assemblies meet UL/FBC details and penetrations are properly sealed. Ref: FBC 703
Confirms rated wall assemblies meet fire-resistance standards. Ref: FBC 703
Inspects footing size, depth, and reinforcing steel before concrete placement. Ref: FBC 110.3(1)
Reviews structural framing, load paths, fire blocking, and MEP rough-ins prior to insulation. Ref: FBC 110.3(3) Inspection was completed on 2021.04.26.
Ensures dampers and duct penetrations are properly installed. Ref: FBC-M 607
Inspects fire safety, anchoring, and venting of fuel tanks. Ref: NFPA 30
Tests hydrant water flow and pressure. Ref: NFPA 14
Verifies insulation type, R-value, and installation before drywall. Ref: FBC Energy C101.5
Confirms grease/oil interceptor installation and connections. Ref: FBC-P 1003
Inspects grease duct, clearances, and fire suppression tie-in. Ref: FBC-M 506 Inspection was completed on 2025.01.14.
Confirms hood suppression system works. Ref: NFPA 96
Checks stucco lath, weep screeds, and moisture barriers before application. Ref: FBC 110.3
Confirms duct/shaft tightness by testing for air-leakage. Ref: FBC-M 603.9
Inspects smoke/shaft tightness by light test. Ref: FBC 907.5
Ensures lintel/tie beam reinforcing steel and anchorage are correct before pour. Ref: FBC 110.3
Confirms vertical and horizontal reinforcing per engineered plans. Ref: FBC 2122.2
Ensures medical gas piping is properly installed and tested. Ref: NFPA 99
Verifies fire alarm functionality. Ref: NFPA 72
Tests special hazard extinguishing system. Ref: NFPA 4
Runs and verifies fire pump performance. Ref: NFPA 20
Flow test for sprinkler/standpipe system. Ref: NFPA 13/14
Ensures HVAC system airflow matches design. Ref: FBC Energy C403.2
Releases power once service equipment is complete and safe. Ref: NEC Art. 230
Verifies refrigerant and condensate piping pressure integrity. Ref: FBC-M 1108
Checks roof drain and rain leader piping installation. Ref: FBC-P 1101
Verifies fastening and components for fire-rated walls, ceilings, or roofs. Ref: FBC 703
Inspects commercial refrigeration piping and systems. Ref: FBC-M 1108
Checks roof sheathing attachment and fastener pattern per FBC wind zones. Ref: FBC 110.3(3)
Checks ductwork, equipment location, and condensate before covering. Ref: FBC-M 603 Inspection was completed on 2025.01.14.
Reviews sanitary sewer piping installation. Ref: FBC-P 312
Ensures proper base, vapor barrier, reinforcing, and termite treatment before pour. Ref: FBC 110.3(1) Inspection was completed on 2021.01.25.
Inspects modified sprinkler system installation. Ref: NFPA 13 §25.2
Verifies water-tightness and slope before tile. Ref: FBC-P 312.9
Flushes underground water main. Ref: NFPA 25
Hydrostatic test of underground fire main. Ref: NFPA 25
Verifies underground piping installation. Ref: NFPA
Checks filled masonry cells or columns for reinforcing and grout. Ref: FBC 2122.2
Confirms nail/screw spacing and panel installation per plans. Ref: FBC 110.3(3)
Checks water service piping for pressure and sizing. Ref: FBC-P 312.5 Inspection was completed on 2023.01.19.
Verifies fastening of windows/doors for impact and wind load compliance. Ref: FBCR 609
Ensures all zoning-related site requirements (buffers, landscaping, setbacks, parking) are satisfied before CO. Columbia County LDR
Ensures structure is complete, safe, and code-compliant before Certificate of Occupancy. Ref: FBC 110.5

Message

Contact Us

Building Department

Office Hours

Monday-Friday
8:00 A.M. - 4:30 P.M.

Contact Information

Phone: 386-758-1008
Fax: 386-758-2160

Email: bldginfo@columbiacountyfla.com

Location

135 NE Hernando Ave.
Lake City, FL 32055 (opens in new window)

Mailing Address

P.O. Box 1529
Lake City, FL 32056-1529

Public Records

Public records policy and fees

Board of County Commissioners
Tel. (386) 758-1326
Fax: (386) 758-2182
Email: publicrecords@columbiacountyfla.com

Mailing Address:
P.O. Box 1529
Lake City, FL 32056-1529

Citizen Feedback

Let us know how we're doing

ADA Accessibility

Columbia County is committed to ensuring accessibility to this website regardless of disability. If anyone encounters a feature on this website that is inaccessible due to a disability, please contact the Columbia County ADA Coordinator at (386) 758-3344. You may also email that office at hr@columbiacountyfla.com and provide a brief description of the inaccessible feature.

Columbia County strives to provide reasonable accommodations to help people with disabilities have an equal opportunity to participate in our public meetings. Please notify our ADA Coordinator at least 48 hours prior to the public meeting by calling (386) 758-3344.