Inspects drainage and water piping before backfill. Ref: FBC-P 312
|
Inspection was completed on 2021.01.20.
|
|
|
Reviews piping, venting, and fixtures before wall close. Ref: FBC-P 312
|
Inspection was completed on 2023.01.19.
|
|
|
Checks wiring, panel placement, and boxes before cover-up. Ref: NEC Art. 110.3
|
|
|
|
Inspects conduit, junctions, and wiring above ceilings before close-up. Ref: NEC Art. 300.11
|
Inspection was completed on 2024.01.17.
|
|
|
Pressure test of sprinkler piping aboveground. Ref: NFPA 13 §25.2
|
|
|
|
Visual review of aboveground sprinkler piping layout. Ref: NFPA 13 §8.6
|
|
|
|
Verifies wall sheathing, nailing, and exterior strapping per wind-load requirements. Ref: FBC 110.3, 1609
|
|
|
|
Full review of fire systems before occupancy. Ref: FBC 907
|
|
|
|
Confirms fire-related wall assemblies meet UL/FBC details and penetrations are properly sealed. Ref: FBC 703
|
|
|
|
Confirms rated wall assemblies meet fire-resistance standards. Ref: FBC 703
|
|
|
|
Inspects footing size, depth, and reinforcing steel before concrete placement. Ref: FBC 110.3(1)
|
|
|
|
Reviews structural framing, load paths, fire blocking, and MEP rough-ins prior to insulation. Ref: FBC 110.3(3)
|
Inspection was completed on 2021.04.26.
|
|
|
Ensures dampers and duct penetrations are properly installed. Ref: FBC-M 607
|
|
|
|
Inspects fire safety, anchoring, and venting of fuel tanks. Ref: NFPA 30
|
|
|
|
Tests hydrant water flow and pressure. Ref: NFPA 14
|
|
|
|
Verifies insulation type, R-value, and installation before drywall. Ref: FBC Energy C101.5
|
|
|
|
Confirms grease/oil interceptor installation and connections. Ref: FBC-P 1003
|
|
|
|
Inspects grease duct, clearances, and fire suppression tie-in. Ref: FBC-M 506
|
Inspection was completed on 2025.01.14.
|
|
|
Confirms hood suppression system works. Ref: NFPA 96
|
|
|
|
Checks stucco lath, weep screeds, and moisture barriers before application. Ref: FBC 110.3
|
|
|
|
Confirms duct/shaft tightness by testing for air-leakage. Ref: FBC-M 603.9
|
|
|
|
Inspects smoke/shaft tightness by light test. Ref: FBC 907.5
|
|
|
|
Ensures lintel/tie beam reinforcing steel and anchorage are correct before pour. Ref: FBC 110.3
|
|
|
|
Confirms vertical and horizontal reinforcing per engineered plans. Ref: FBC 2122.2
|
|
|
|
Ensures medical gas piping is properly installed and tested. Ref: NFPA 99
|
|
|
|
Verifies fire alarm functionality. Ref: NFPA 72
|
|
|
|
Tests special hazard extinguishing system. Ref: NFPA 4
|
|
|
|
Runs and verifies fire pump performance. Ref: NFPA 20
|
|
|
|
Flow test for sprinkler/standpipe system. Ref: NFPA 13/14
|
|
|
|
Ensures HVAC system airflow matches design. Ref: FBC Energy C403.2
|
|
|
|
Releases power once service equipment is complete and safe. Ref: NEC Art. 230
|
|
|
|
Verifies refrigerant and condensate piping pressure integrity. Ref: FBC-M 1108
|
|
|
|
Checks roof drain and rain leader piping installation. Ref: FBC-P 1101
|
|
|
|
Verifies fastening and components for fire-rated walls, ceilings, or roofs. Ref: FBC 703
|
|
|
|
Inspects commercial refrigeration piping and systems. Ref: FBC-M 1108
|
|
|
|
Checks roof sheathing attachment and fastener pattern per FBC wind zones. Ref: FBC 110.3(3)
|
|
|
|
Checks ductwork, equipment location, and condensate before covering. Ref: FBC-M 603
|
Inspection was completed on 2025.01.14.
|
|
|
Reviews sanitary sewer piping installation. Ref: FBC-P 312
|
|
|
|
Ensures proper base, vapor barrier, reinforcing, and termite treatment before pour. Ref: FBC 110.3(1)
|
Inspection was completed on 2021.01.25.
|
|
|
Inspects modified sprinkler system installation. Ref: NFPA 13 §25.2
|
|
|
|
Verifies water-tightness and slope before tile. Ref: FBC-P 312.9
|
|
|
|
Flushes underground water main. Ref: NFPA 25
|
|
|
|
Hydrostatic test of underground fire main. Ref: NFPA 25
|
|
|
|
Verifies underground piping installation. Ref: NFPA
|
|
|
|
Checks filled masonry cells or columns for reinforcing and grout. Ref: FBC 2122.2
|
|
|
|
Confirms nail/screw spacing and panel installation per plans. Ref: FBC 110.3(3)
|
|
|
|
Checks water service piping for pressure and sizing. Ref: FBC-P 312.5
|
Inspection was completed on 2023.01.19.
|
|
|
Verifies fastening of windows/doors for impact and wind load compliance. Ref: FBCR 609
|
|
|
|
Ensures all zoning-related site requirements (buffers, landscaping, setbacks, parking) are satisfied before CO.
Columbia County LDR
|
|
|
|
Ensures structure is complete, safe, and code-compliant before Certificate of Occupancy. Ref: FBC 110.5
|
|