Permit Details

Permit Search

Permit

New Commercial Construction

4243 SW CAMBRIDGE GLN
LAKE CITY , FL 32024

Permit #
000044714
Application #
54066
Status Completed
  1. Submitted Apr 14, 2022
  2. Issued Jun 21, 2022
  3. Expires Nov 22, 2023
  4. Completed Jun 1, 2023

Property

Parcel #
02465-115
Owner
North Florida Primary Care Pllc
Acres
0.55
Subdivision
Stonegate Park
Zoning
—
Flood zone
X
District
3

Permit

Status
Completed
Septic release
Released
Related permit
—

Job Details

Elevation regulation
Site & Development Plan
Finished floor requirement
164 FT.
Requirement needed
By Permanent Power Inspection
Document needed is
a Surveyor letter giving the Finished Floor Elevation
Document receieved
Yes
Fema map number
12023C0290D
This is the construction of a:
Commercial building
Driveway access to property:
Existing Drive
Is there a Fire Sprinkler System?
No
Setbacks Front
20
Setback Side 1
10
Setback Side 2
10
Setback Rear
15
Describe commercial use:
Medical Office
Stories
1
Heated Area (Sqft)
4500
Total Area (Sqft)
7500
Building Height
18
Building Code Construction Type
I
Building Code Element
A
Occupancy Use Title
Business
Dev Permit #
F023-
Design Occupant Load
79
Building Code Edition
2020 Florida Building Code 7th Edition and 2017 National Electrical Code
Septic# (00-0000) or (X00-000)
x-city
Sealed roof decking options. (Must select one.)
N/A
Service Amps
600

Status & Review History

  1. Application pending.
  2. City of Lake City Notified of Application within City of Lake City LC_GAS, LC_WATER, LC_SEWER.
  3. Point Review - On Hold-Incomplete
  4. Point Review - Printed-Online Application
  5. Point Review - Reviewed
  6. Point Review - Reviewed
  7. Plan Review - Documents Required
  8. Plan Review - Documents Required
  9. Plan Review - Plumbing Approved
  10. Plan Review - Mechanical Approved
  11. Plan Review - Electrical Approved
  12. Plan Review - Building Approved
  13. Plan Review - Reviewed
  14. Zoning Review - Documents Required
  15. Final Review - Reviewed
  16. Final Review - Payment Needed
  17. Zoning Review - Reviewed
  18. Permit Issued

Contractors

  • Bryan Zecher

    Bryan Zecher Homes Inc

    License
    CBC1257343
    Title
    Building Contractor
    Role
    Contractor
  • Cody Barrs

    Barrs Plumbing Inc

    License
    CFC1427145
    Title
    Plumbing Contractor
    Role
    Subcontractor
  • Robert Ogles

    Ogles Roofing & Construction Llc

    License
    CCC1328699
    Title
    Cert Roofing
    Role
    Subcontractor

    County License & State License Expired.

  • Donald R Hollingsworth

    Holly Electric Inc

    License
    EC13005429
    Title
    Electrical
    Role
    Subcontractor
  • Anthony R Franks

    Lane Heating & Air Llc

    License
    CAC1818631
    Title
    Cert. A/c Class “b”
    Role
    Subcontractor

    County License & State License Expired.

Inspections

  1. Jul 18, 2022

    Passed: Electrical - Temporary Service

    Inspected by Troy Crews

  2. Jul 18, 2022

    Release to power company

    Inspected by Troy Crews

  3. Jul 22, 2022

    Passed: Plumbing/Gas - 1st Underground Rough–In

    Inspected by Troy Crews

  4. Aug 10, 2022

    Passed: Building - Monolithic Slab

    Inspected by Troy Crews

  5. Aug 10, 2022

    Passed: Engineering - Setbacks

    Inspected by Troy Crews

  6. Nov 30, 2022

    Rescheduled 12/5/2022:Electrical - 2nd Rough-In

    Inspected by Emaleigh Williams

  7. Nov 30, 2022

    Rescheduled 12/5/2022:Mechanical - Rough In

    Inspected by Emaleigh Williams

  8. Nov 30, 2022

    Rescheduled 12/5/2022:Plumbing/Gas - 2nd Rough-In

    Inspected by Emaleigh Williams

  9. Dec 5, 2022

    Passed: Building - Framing

    Interior Only Need To Inspect Storefront Before Metal Framing Is Coverred.

    Inspected by Troy Crews

  10. Dec 5, 2022

    Passed: Electrical - 2nd Rough-In

    Inspected by Troy Crews

  11. Dec 5, 2022

    Passed: Mechanical - Rough In

    Inspected by Troy Crews

  12. Dec 5, 2022

    Passed: Plumbing/Gas - 2nd Rough-In

    Inspected by Troy Crews

  13. Dec 5, 2022

    Rescheduled 12/9/2022:Building - Framing

    Inspected by Troy Crews

  14. Dec 9, 2022

    Passed: Building - Framing

    Facade Framing, Leave Front Porch Ceiling Open For Final Framing Of Facade, Braces Etc

    Inspected by Troy Crews

  15. Dec 22, 2022

    Passed: Building - Framing

    Inspected by Troy Crews

  16. Dec 22, 2022

    Passed: Building - Insulation

    Check Bottom Of Parapet For Insulation Prior To Porch Ceiling

    Inspected by Troy Crews

  17. Dec 29, 2022

    Passed: Building - Lath/Stucco

    Inspected by Troy Crews

  18. Feb 17, 2023

    Passed: Electrical - Above Ceiling

    Inspected by Troy Crews

  19. Mar 6, 2023

    Rescheduled 3/10/2023:Electrical - Permanent Power

    Inspected by Janice Williams

  20. Mar 10, 2023

    Passed: Electrical - Permanent Power

    Need Elevation Confirmation Letter Electrician May Need To Tie In Wires In Trough

    Inspected by Troy Crews

  21. Mar 15, 2023

    Release to power company

    Elevation Confirmed In Email From Surveyor Letter Forethcomung.

    Inspected by Troy Crews

  22. May 24, 2023

    Rescheduled 5/25/2023:Building - Final

    Inspected by Troy Crews

  23. May 25, 2023

    Passed: Building - Final

    Need Fire Final, Replace Sewer Cleanout Plug In Handicap Aisle With Flush Mount Plug And Label Electric Panel For Co Release.

    Inspected by Troy Crews

  24. May 26, 2023

    Passed: Fire - Fire Final

    Inspected by Dwight Boozer

  25. Jun 1, 2023

    Certificate-Release Certificate

    Items Corrected

    Inspected by Troy Crews