Inspection |
Notes |
Performed By |
Date |
Passed: Building - Footer |
|
Troy Crews |
5/10/2021 |
Passed: Engineering - Setbacks |
|
Troy Crews |
5/10/2021 |
Passed: Electrical - Temporary Service |
|
Troy Crews |
5/10/2021 |
Release to power company |
|
Troy Crews |
5/10/2021 |
Passed: Plumbing/Gas - 1st Underground Rough–In |
|
Troy Crews |
6/14/2021 |
Passed: Building - Slab |
|
Troy Crews |
6/17/2021 |
Passed: Building - Roof Decking |
|
Troy Crews |
9/7/2021 |
Failed: Building - Framing |
Anchor Bolts Missing Check At Green Paint, Also Check 4 Ft. Spacing, Check Truss Bracing And Strapping, Need Heavy Girder Tie Downs Each Side Of Garage Opening, Need To Strap All Headers |
Troy Crews |
9/7/2021 |
Failed: Building - Framing |
A-7 Truss Needs Straps Put Interior Studs Back In |
Troy Crews |
10/6/2021 |
Failed: Electrical - 2nd Rough-In |
Plug For Whirlpool Must Be Installed Prior To Insulation |
Troy Crews |
10/6/2021 |
Passed: Mechanical - Rough In |
|
Troy Crews |
10/6/2021 |
Passed: Plumbing/Gas - 2nd Rough-In |
|
Troy Crews |
10/6/2021 |
Passed: Building - Insulation |
|
Troy Crews |
11/8/2021 |
Passed: Building - Framing |
Items Corrected |
Troy Crews |
11/8/2021 |
Passed: Electrical - 2nd Rough-In |
Plug Installed. |
Troy Crews |
11/8/2021 |
Failed: Electrical - Permanent Power |
Need Final Septic Inspection, Need Garage Door And All Exterior Doors Lockable, Need Ground Rods Connected. |
Troy Crews |
2/18/2022 |
Passed: Electrical - Permanent Power |
Need Final Septic Release |
Troy Crews |
3/21/2022 |
Release to power company |
|
Melissa Garber |
4/13/2022 |
Septic Release Inspection |
|
Health Dept |
4/13/2022 |
Failed: Building - Final |
Need Blower Door Test, Final Termite Treatment, No Gfci Protection In Areas Needed Breakers Appear To Be Only Afci |
Troy Crews |
5/31/2022 |
Passed: Building - Final |
Contractor To Put Gfci On Washer Plug In Garage |
Troy Crews |
6/9/2022 |