Rescheduled 3/17/2021:Plumbing/Gas - 1st Underground Rough–In |
|
Matt Forsyth |
3/16/2021 |
Passed: Plumbing/Gas - 1st Underground Rough–In |
|
Matt Forsyth |
3/17/2021 |
Cancelled: Plumbing/Gas - 2nd Rough-In |
|
Anthony Aslan |
3/19/2021 |
Passed: Building - Slab |
Fiber-mesh Concrete In Slab Need Concrete Tickets For Pour Left In Permit Box |
Matt Forsyth |
3/22/2021 |
Failed: Building - Ext Strapping/Wall Sheathing |
Porch Beam Strapping Not Complete. Gable End Diaphram Straps Missing |
Matt Forsyth |
4/30/2021 |
Failed: Building - Framing |
Need Anchor Bolts On Both Sides Of Soleplate Ends. Missing Anchor Bolts In Spots. Blocking Needed On Gable Ends And Nailed Thru Sheeting. On Nails Missing Framing Members Need To Be Removed And Re Nailed. Missing Garage Hold Down On One Side. |
Matt Forsyth |
4/30/2021 |
Failed: Building - Roof Decking |
All Nails Missing Framing Members Need To Be Removed Re Nailed |
Matt Forsyth |
4/30/2021 |
Failed: Building - Strapping |
|
Matt Forsyth |
4/30/2021 |
Failed: Building - Wall Sheathing |
All Nails Missing Framing Members Need To Be Removed And Re Nailed |
Matt Forsyth |
4/30/2021 |
Passed: Building - Framing |
|
Matt Forsyth |
5/6/2021 |
Passed: Building - Roof Decking |
|
Matt Forsyth |
5/6/2021 |
Passed: Building - Wall Sheathing |
|
Matt Forsyth |
5/6/2021 |
Failed: Mechanical - Rough In |
Need Gasket Seal On Boots |
Matt Forsyth |
5/26/2021 |
Cancelled: Mechanical - Rough In |
|
Matt Forsyth |
5/28/2021 |
Cancelled: Mechanical - Rough In |
|
Matt Forsyth |
5/28/2021 |
Failed: Plumbing/Gas - 2nd Rough-In |
No Pressure On System, Nail Guard Hall Hot Water For Shower. |
Anthony Aslan |
6/2/2021 |
Failed: Mechanical - Rough In |
Move Return, Return Not Required In Laundry, Strap Up Exhaust Fan Venting, Kitchen Hood Needs To Be Installed To Complete Mechanical Rough. |
Anthony Aslan |
6/2/2021 |
Passed: Electrical - 2nd Rough-In |
Move Smoke Detector In Hallway |
Anthony Aslan |
6/2/2021 |
Failed: Mechanical - Rough In |
Kitchen Hood Not Completed, Master Exhaust Venting Not Strapped Up. Return In Laundry No Required.
m1602.3balanced Return Air.
restricted Return Air Occurs In Buildings When Returns Are Located In Central Zones And Closed Interior Doors Impede Air Flow To The Return Grill Or When Ceiling Spaces Are Used As Return Plenums And Fire Walls Restrict Air Movement From One Portion Of The Return Plenum To Another. Provisions Shall Be Made In Both Residential And Commercial Buildings To Avoid Unbalanced Air Flows And Pressure Differentials Caused By Restricted Return Air. Pressure Differentials Across Closed Doors Where Returns Are Centrally Located Shall Be Limited To 0.01 Inch W.c. (2.5 Pa) Or Less. Pressure Differentials Across Fire Walls In Ceiling Space Plenums Shall Be Limited To 0.01 Inch W.c. (2.5 Pa) By Providing Air Duct Pathways Or Air Transfer Pathways From The High Pressure Zone To The Low Zone.
exceptions:
1.transfer Ducts May Achieve This By Increasing The Return Transfer 11/2 Times The Cross Sectional Area (square Inches) Of The Supply Duct Entering The Room Or Space It Is Serving And The Door Having At Least An Unrestricted 1-inch Undercut To Achieve Proper Return Air Balance.
2.transfer Grilles Shall Use 50 Square Inches (of Grille Area) To 100 Cfm (of Supply Air) For Sizing Throughthe-wall Transfer Grilles And Using An Unrestricted 1-inch Undercutting Of Doors To Achieve Proper Return Air Balance.
3.habitable Rooms Only Shall Be Required To Meet These Requirements For Proper Balanced Return Air Excluding Bathrooms, Closets, Storage Rooms And Laundry Rooms, Except That All Supply Air Into The Master Suite Shall Be Included. |
Anthony Aslan |
6/4/2021 |
Passed: Plumbing/Gas - 2nd Rough-In |
|
Anthony Aslan |
6/4/2021 |
Passed: Mechanical - Rough In |
|
Matt Forsyth |
6/8/2021 |
Cancelled: Building - Framing |
|
Melissa Garber |
6/10/2021 |
Cancelled: Building - Roof Decking |
|
Melissa Garber |
6/10/2021 |
Cancelled: Building - Wall Sheathing |
|
Melissa Garber |
6/10/2021 |
Cancelled: Building - Insulation |
|
Melissa Garber |
6/10/2021 |
Passed: Building - Insulation |
Walls Only |
Matt Forsyth |
6/10/2021 |
Failed: Electrical - Permanent Power |
Need Meter Can Work Finished Septic Releas |
Matt Forsyth |
9/13/2021 |
Cancelled: Electrical - Temporary Service |
|
Matt Forsyth |
9/13/2021 |
Passed: Electrical - Permanent Power |
Need Septic Released Then We Can Release Power |
Matt Forsyth |
9/14/2021 |
Release to power company |
|
Melissa Garber |
9/20/2021 |
Septic Release Inspection |
|
Health Dept |
9/20/2021 |
Passed: Building - Insulation |
Ceiling |
Matt Forsyth |
10/28/2021 |
Passed: Building - Final |
|
Matt Forsyth |
10/28/2021 |