Inspection |
Notes |
Performed By |
Date |
Passed: Building - Footer |
|
Troy Crews |
2/11/2021 |
Passed: Engineering - Setbacks |
|
Troy Crews |
2/11/2021 |
Passed: Electrical - Temporary Service |
|
Troy Crews |
3/4/2021 |
Release to power company |
|
Troy Crews |
3/4/2021 |
Passed: Plumbing/Gas - 1st Underground Rough–In |
|
Troy Crews |
3/19/2021 |
Passed: Building - Slab |
|
Troy Crews |
4/1/2021 |
Passed: Building - Wall Sheathing |
|
Anthony Aslan |
5/28/2021 |
Passed: Building - Roof Decking |
|
Anthony Aslan |
5/28/2021 |
Passed: Building - Framing |
|
Anthony Aslan |
5/28/2021 |
Passed: Electrical - 2nd Rough-In |
|
Anthony Aslan |
6/9/2021 |
Failed: Plumbing/Gas - 2nd Rough-In |
Nail Guard In Master Bath Supply Lines Less Than 1.25" Of Edge Top Plate. |
Anthony Aslan |
6/9/2021 |
Failed: Mechanical - Rough In |
1.) Fresh Air And Bath Exhaust By Garage Are To Close Together.
1a.) Bath Exhaust From Master Bath On Back Porch To Close To Door Opening.
m1506.3exhaust Openings.
air Exhaust Openings Shall Terminate Not Less Than 3 Feet (914 Mm) From Property Lines; 3 Feet (914 Mm) From Operable And Nonoperable Openings Into The Building And 10 Feet (3048 Mm) From Mechanical Air Intakes Except Where The Opening Is Located 3 Feet (914 Mm) Above The Air Intake. Openings Shall Comply With Sections R303.5.2 And R303.6.
2.) Fresh Air Needs To Be Automatic Damper.
3.) Dryer Vent Needs Nail Plates And Needs To Be In The Wall.
also Minimum Clearance Around Plenum Ducts In 4"in. |
Anthony Aslan |
6/9/2021 |
Passed: Mechanical - Rough In |
|
Anthony Aslan |
6/10/2021 |
Passed: Plumbing/Gas - 2nd Rough-In |
|
Anthony Aslan |
6/10/2021 |
Passed: Building - Insulation |
Need To Get Front & Back Porch Windows In |
Anthony Aslan |
6/16/2021 |
Passed: Electrical - Permanent Power |
Need Septic And Drive Final |
Troy Crews |
8/11/2021 |
Release to power company |
|
Melissa Garber |
8/17/2021 |
Septic Release Inspection |
|
Health Dept |
8/17/2021 |
Passed: Building - Final |
|
Anthony Aslan |
9/20/2021 |