Permit Details

Permit Search

Permit

New Residential Construction

10011 SW TUSTENUGGEE AVE
LAKE CITY, FL 32024

Permit #
000041246
Application #
48027
Status Completed
  1. Submitted Jan 18, 2021
  2. Issued Feb 3, 2021
  3. Expires Mar 19, 2022
  4. Completed Sep 20, 2021

Property

Parcel #
09612-000
Owner
Dorcas Wayne L & Michelle L Dorcas
Acres
18.22
Subdivision
—
Zoning
A-3
Flood zone
X
District
4

Permit

Status
Completed
Septic release
Released
Related permit
—

Job Details

Elevation regulation
Minimum Requirement
Finished floor requirement
One foot above the road
Fema map number
12023C0485C
In floodway
N
This is the construction of a
Single Family Dwelling
Setbacks Front
30'
Setback Side 1
25'
Setback Side 2
25'
Setbacks Rear
25'
Stories
1
Heated Area (Sqft)
1868
Total Area (Sqft)
3245
Building Height
21
Building Code Construction Type
V
Building Code Element
B
Building Code Occupancy Types
Residential
Occupancy Use Title
single family
Building Code Edition
Florida Building Code 2017 6th Edition & 2014 National Electrical Code
Septic# (00-0000) or (X00-000)
21-0021

Status & Review History

  1. Application pending.
  2. Point Review - Printed-Online Application
  3. Point Review - Reviewed
  4. Zoning Review - Reviewed
  5. Plan Review - Reviewed
  6. Zoning Review - Reviewed
  7. Final Review - Reviewed
  8. Final Review - Payment Needed
  9. Permit Issued
  10. Point Review - Reviewed
  11. Final Review - Payment Needed

Contractors

  • Bryan Zecher

    Bryan Zecher Homes Inc

    License
    CBC1257343
    Title
    Building Contractor
    Role
    Contractor
  • Marcus Matthews

    Matthews Electric Llc

    License
    EC13005459
    Title
    Electrical Contractor
    Role
    Subcontractor
  • Anthony R Franks

    Franks & Lane Heating And Air Llc

    License
    CAC1818631
    Title
    Cert. A/c Class “b”
    Role
    Subcontractor

    County License & State License Expired.

  • Cody Barrs

    Barrs Plumbing Inc

    License
    CFC1427145
    Title
    Plumbing Contractor
    Role
    Subcontractor
  • Robert Ogles Ii

    Ogles Roofing & Construction Llc

    License
    CCC1328699
    Title
    Cert Roofing
    Role
    Subcontractor

    County License & State License Expired.

Inspections

  1. Feb 11, 2021

    Passed: Building - Footer

    Inspected by Troy Crews

  2. Feb 11, 2021

    Passed: Engineering - Setbacks

    Inspected by Troy Crews

  3. Mar 4, 2021

    Passed: Electrical - Temporary Service

    Inspected by Troy Crews

  4. Mar 4, 2021

    Release to power company

    Inspected by Troy Crews

  5. Mar 19, 2021

    Passed: Plumbing/Gas - 1st Underground Rough–In

    Inspected by Troy Crews

  6. Apr 1, 2021

    Passed: Building - Slab

    Inspected by Troy Crews

  7. May 28, 2021

    Passed: Building - Wall Sheathing

    Inspected by Anthony Aslan

  8. May 28, 2021

    Passed: Building - Roof Decking

    Inspected by Anthony Aslan

  9. May 28, 2021

    Passed: Building - Framing

    Inspected by Anthony Aslan

  10. Jun 9, 2021

    Passed: Electrical - 2nd Rough-In

    Inspected by Anthony Aslan

  11. Jun 9, 2021

    Failed: Plumbing/Gas - 2nd Rough-In

    Nail Guard In Master Bath Supply Lines Less Than 1.25" Of Edge Top Plate.

    Inspected by Anthony Aslan

  12. Jun 9, 2021

    Failed: Mechanical - Rough In

    1.) Fresh Air And Bath Exhaust By Garage Are To Close Together. 1a.) Bath Exhaust From Master Bath On Back Porch To Close To Door Opening. m1506.3exhaust Openings. air Exhaust Openings Shall Terminate Not Less Than 3 Feet (914 Mm) From Property Lines; 3 Feet (914 Mm) From Operable And Nonoperable Openings Into The Building And 10 Feet (3048 Mm) From Mechanical Air Intakes Except Where The Opening Is Located 3 Feet (914 Mm) Above The Air Intake. Openings Shall Comply With Sections R303.5.2 And R303.6. 2.) Fresh Air Needs To Be Automatic Damper. 3.) Dryer Vent Needs Nail Plates And Needs To Be In The Wall. also Minimum Clearance Around Plenum Ducts In 4"in.

    Inspected by Anthony Aslan

  13. Jun 10, 2021

    Passed: Mechanical - Rough In

    Inspected by Anthony Aslan

  14. Jun 10, 2021

    Passed: Plumbing/Gas - 2nd Rough-In

    Inspected by Anthony Aslan

  15. Jun 16, 2021

    Passed: Building - Insulation

    Need To Get Front & Back Porch Windows In

    Inspected by Anthony Aslan

  16. Aug 11, 2021

    Passed: Electrical - Permanent Power

    Need Septic And Drive Final

    Inspected by Troy Crews

  17. Aug 17, 2021

    Release to power company

    Inspected by Melissa Garber

  18. Aug 17, 2021

    Septic Release Inspection

    Inspected by Health Dept

  19. Sep 20, 2021

    Passed: Building - Final

    Inspected by Anthony Aslan

Documents