Inspection |
Notes |
Performed By |
Date |
Passed: Electrical - Temporary Service |
|
Troy Crews |
1/27/2021 |
Release to power company |
|
Troy Crews |
1/27/2021 |
Passed: Plumbing/Gas - 1st Underground Rough–In |
6 Units |
Troy Crews |
3/12/2021 |
Passed: Building - Monolithic Slab |
Make Sure All Plastic Is In Place |
Troy Crews |
3/25/2021 |
Passed: Engineering - Setbacks |
|
Troy Crews |
3/25/2021 |
Passed: Building - Roof Decking |
|
Troy Crews |
4/28/2021 |
Passed: Building - Wall Sheathing |
|
Troy Crews |
4/28/2021 |
Passed: Building - Strapping |
Porch Post Strapped |
Troy Crews |
5/18/2021 |
Failed: Building - Framing |
Need Revision Letter From Architect For Change From Block Separation Walls, Also Need To Address Fire Rated Roof Deck Missing Between Two North Units. |
Troy Crews |
5/18/2021 |
Failed: Building - Framing |
Need Letter For Change From Block Fire Walls, Framing In Bathroom North Apartment Loose, Need To Treat Underside Of Decking Two North Apartments. |
Troy Crews |
6/14/2021 |
Passed: Electrical - 2nd Rough-In |
|
Troy Crews |
6/14/2021 |
Failed: Mechanical - Rough In |
Need Seals On All Registers And Return Boxes. |
Troy Crews |
6/14/2021 |
Passed: Plumbing/Gas - 2nd Rough-In |
|
Troy Crews |
6/14/2021 |
Passed: Building - Insulation |
|
Troy Crews |
6/25/2021 |
Passed: Building - Fire Rated Wall |
|
Troy Crews |
6/25/2021 |
Passed: Building - Framing |
Deck Fire Treated |
Troy Crews |
6/25/2021 |
Passed: Mechanical - Rough In |
Gaskets On Boots |
Troy Crews |
6/25/2021 |
Passed: Electrical - Permanent Power |
|
Troy Crews |
8/31/2021 |
Release to power company |
|
Troy Crews |
8/31/2021 |
Passed: Building - Final |
Release Pending Zoning Final |
Troy Crews |
9/24/2021 |
Failed: Engineering - Zoning Final |
Spoke With Blake Lunde (contractor), Mark Touchstone (owner), And Carol Chadwick (engineer). There Are A Few Minor Issues To Resolve. Ms. Chadwick Is Going To Submit A Minor Revision To An Approved Site Plan For The Alternate Drainage And Ada Access. Mr. Lundy Is Going To Get A Ada Sidewalk Poured Between The Ada Access Isle And The Existing Sidewalk. Mr. Touchstone Is Going To Have Landscaping Put In On Tuesday, September 28. I Will Reinspect On Tuesday. If All Issues Have Been Addressed On Tuesday, Then A Certificate Of Occupancy Can Be Issued. |
Brandon Stubbs |
9/24/2021 |
Certificate-Release Certificate |
|
Troy Crews |
10/5/2021 |
Passed: Engineering - Zoning Final |
All Outstanding Issues Have Been Resolved. |
Brandon Stubbs |
10/5/2021 |