Columbia County is committed to ensuring accessibility to this website regardless of disability. If anyone encounters a feature on this website that is inaccessible due to a disability, please contact the County Manger’s Office and the Columbia County Board of County Commissioners at (386) 758-1005. You may also email that office at patrick_weaver@columbiacountyfla.com and provide a brief description of the inaccessible feature. The County will either correct the inaccessible feature or, if correction is not possible due to technical limitations, provide the desired information through alternative means.

Skip to content

Columbia County, FL | Permit Details

Modular Building - Residential or Commerical Permit

Address 1608 SW SUNVIEW ST
FORT WHITE, FL 32038
Parcel #: 03745-213
Acres: 5.01
Owner: Buxton Alan L &
Subdivision: Sunview Estates
Zoning: ESA-2
Flood Zone: X
District: 2
Application #: 48018
Permit #: 000041151
Related Permit:
Submitted:
Issued: Wednesday, January 13, 2021
Expires: Tuesday, April 13, 2021
Completed: Tuesday, April 13, 2021
Status: Completed
Septic Release? Yes
Notes:

Job Details
Elevation regulation Minimum Requirement
Finished floor requirement One foot above the road
Fema map number 12023C0390C
In floodway N
Setbacks Front 30
Setback Side 1 25
Setback Side 2 25
Setbacks Rear 25
Stories 1
Heated Area (Sqft) 2100
Total Area (Sqft) 2100
Dev Permit # F023-
Building Height 15
Building Code Construction Type V
Building Code Element B
Building Code Occupancy Types Residential
Occupancy Use Title single family
Building Code Edition Florida Building Code 2017 6th Edition & 2014 National Electrical Code
Septic# (00-0000) or (X00-000) 20-1030
Modular frame type Off frame
Use Type: Residential
Review Notes
12/21/2020 Point Review - Received-Hard Copy Application
12/22/2020 Zoning Review - Reviewed
1/4/2021 Plan Review - Reviewed
1/8/2021 Zoning Review - Reviewed
1/8/2021 Final Review - Documents Required
1/12/2021 Final Review - Payment Needed
1/13/2021 Permit Issued Permit #000041151 created and approved.
Contractors
Name/ Business License Title Role
Inspections
Inspection Notes Performed By Date
Passed: Building - Footer Need Porto Let Toilet For Next Inspection Matt Forsyth 1/27/2021
Passed: Engineering - Setbacks Matt Forsyth 1/27/2021
Passed: Modular - Lintel/Tie Beam Matt Forsyth 2/4/2021
Passed: Modular - Strapping Matt Forsyth 2/22/2021
Septic Release Inspection Health Dept 3/2/2021
Failed: Modular - Permanent Power & Final Building Exterior Needs To Be Finished To Prevent Possible Water Damage Matt Forsyth 3/9/2021
Passed: Building - Final Matt Forsyth 4/13/2021