Columbia County is committed to ensuring accessibility to this website regardless of disability. If anyone encounters a feature on this website that is inaccessible due to a disability, please contact the County Manger’s Office and the Columbia County Board of County Commissioners at (386) 758-1005. You may also email that office at patrick_weaver@columbiacountyfla.com and provide a brief description of the inaccessible feature. The County will either correct the inaccessible feature or, if correction is not possible due to technical limitations, provide the desired information through alternative means.

Skip to content

Columbia County, FL | Permit Details

New Commercial Construction Permit

Address 294 NW I-10 WEST REST AREA LOOP
LAKE CITY, FL 32055
Parcel #: 00109-001
Acres: 13.50
Owner: Tiitf/dot-rest Area
Subdivision:
Zoning: A-3
Flood Zone: X
District: 1
Application #: 47871
Permit #: 000041141
Related Permit:
Submitted: Tuesday, December 1, 2020
Issued: Monday, January 11, 2021
Expires: Thursday, November 17, 2022
Completed: Thursday, November 17, 2022
Status: Completed
Septic Release? Yes
Notes:
STRUCTURE PERMIT FOR THIS PROJECT FOUNDATION PERMIT 40647 ELEVATION CONFIRMATION RECEIVED 123 FT.
Job Details
Elevation regulation Site & Development Plan
Finished floor requirement 123'
Requirement needed By Nailing Inspection
Document needed is a Surveyor letter giving the Finished Floor Elevation
Document receieved Yes
Fema map number 12023C0170D
This is the construction of a: Rest Area
Driveway access to property: Existing Drive
Is there a Fire Sprinkler System? No
Setbacks Front 30'
Setback Side 1 25'
Setback Side 2 25'
Setback Rear 25'
Describe commercial use: Public Use
Stories 1
Heated Area (Sqft) 8375
Total Area (Sqft) 8375
Building Height 33
Building Code Construction Type II
Building Code Element B
Building Code Occupancy Types Assembly
Occupancy Use Title a-3
Dev Permit # F023-
Design Occupant Load 227
Building Code Edition Florida Building Code 2017 6th Edition & 2014 National Electrical Code
Septic# (00-0000) or (X00-000) x20
Review Notes
12/1/2020 Application pending.
12/1/2020 Point Review - Printed-Online Application
12/1/2020 Point Review - Reviewed
12/28/2020 Plan Review - Documents Required
12/31/2020 Plan Review - Reviewed
1/8/2021 Zoning Review - Reviewed
1/11/2021 Permit Issued Permit #000041141 created and approved.
8/12/2022 Final Review - Payment Needed 5.3.21 - JORDAN GRAY REQUESTED TO CHANGE THE APPLICANT EMAIL TO GREG BIRDSONG AS ACTING JOB MANAGER. (JGRAY@GRAY-CONSTRUCTION.COM TO GBIRDSONG@GRAY-CONSTRUCTION.COM)
8/12/2022 Final Review - Payment Needed 5.3.21 - JORDAN GRAY REQUESTED TO CHANGE THE APPLICANT EMAIL TO GREG BIRDSONG AS ACTING JOB MANAGER. (JGRAY@GRAY-CONSTRUCTION.COM TO GBIRDSONG@GRAY-CONSTRUCTION.COM)
Contractors
Name/ Business License Title Role
Matthew T Gray
Gray Construction Services Inc
County License & State License Expired.
CGC062854 Cert General Contractor
Erik W Worthmann
Comfort Temp Company
Workers Comp Expired.
CFC1428364 Cert. Plumbing Subcontractor
David P Wood
Wood's Electrical Services Inc
EC13002213 Electrical Contractor Subcontractor
Thomas Worthmann
Comfort Temp Company
County License & State License & Liability Insurance & Workers Comp Expired.
CMC039605 Mechanical Contractor Subcontractor
Benjamin T Keeler
Keeler Roofing, Llc
CCC1330509 Cert. Roofing Subcontractor
Inspections
Inspection Notes Performed By Date
Passed: Fire - Plan Review Tad Cervantes 1/4/2021
Passed: Building - Vertical Cells/Columns C-16 Column 20#6 Bars Installed East Side Of Breezeway Troy Crews 2/17/2021
Rescheduled 2/26/2021:Building - Slab Troy Crews 2/25/2021
Passed: Building - Slab Womens Side And Electric Room Troy Crews 2/26/2021
Passed: Building - Monolithic Slab Mens Side Troy Crews 3/9/2021
Passed: Engineering - Setbacks Troy Crews 3/9/2021
Cancelled: Building - Lintel/Tie Beam Troy Crews 3/15/2021
Cancelled: Building - Masonry Wall Reinforcing Troy Crews 3/15/2021
Cancelled: Building - Vertical Cells/Columns Troy Crews 3/15/2021
Passed: Building - Masonry Wall Reinforcing 4 Ft. Womens Side Troy Crews 3/17/2021
Passed: Building - Masonry Wall Reinforcing Troy Crews 3/23/2021
Passed: Building - Masonry Wall Reinforcing Troy Crews 3/26/2021
Passed: Building - Footer 2 10x20x2 Ft. Deep Troy Crews 3/29/2021
Passed: Engineering - Setbacks Troy Crews 3/29/2021
Passed: Building - Masonry Wall Reinforcing Mens Side Second Lift Troy Crews 4/5/2021
Passed: Building - Masonry Wall Reinforcing Troy Crews 4/7/2021
Passed: Building - Masonry Wall Reinforcing Troy Crews 4/9/2021
Passed: Building - Vertical Cells/Columns Troy Crews 4/13/2021
Passed: Building - Masonry Wall Reinforcing Triple Bond Beam Mens Side Troy Crews 4/13/2021
Passed: Building - Lintel/Tie Beam Front Tie Beam At Entrance 40 Inch, And Two Side Beams To Building Corners. Troy Crews 4/20/2021
Passed: Building - Masonry Wall Reinforcing Division Wall Interior Mens And Womens And Top Bond Beam Two End Walls. Troy Crews 4/20/2021
Passed: Building - Lintel/Tie Beam R-b 2 East End And North South Tommorrow Troy Crews 4/22/2021
Passed: Building - Lintel/Tie Beam Remainder Of East End Tie Beams Troy Crews 4/23/2021
Passed: Building - Masonry Wall Reinforcing Troy Crews 5/3/2021
Passed: Building - Masonry Wall Reinforcing Troy Crews 5/4/2021
Passed: Building - Masonry Wall Reinforcing Troy Crews 5/14/2021
Passed: Building - Masonry Wall Reinforcing Troy Crews 5/18/2021
Passed: Building - Masonry Wall Reinforcing Troy Crews 5/26/2021
Passed: Building - Masonry Wall Reinforcing Troy Crews 5/27/2021
Passed: Building - Masonry Wall Reinforcing Troy Crews 6/2/2021
Passed: Building - Vertical Cells/Columns Done On 6-2-21 Troy Crews 6/2/2021
Passed: Building - Lintel/Tie Beam West End Rake Beam Troy Crews 6/8/2021
Passed: Building - Masonry Wall Reinforcing Troy Crews 6/9/2021
Passed: Building - Masonry Wall Reinforcing Troy Crews 6/15/2021
Passed: Building - Masonry Wall Reinforcing Troy Crews 6/22/2021
Passed: Building - Masonry Wall Reinforcing Troy Crews 6/24/2021
Passed: Building - Lintel/Tie Beam Troy Crews 6/30/2021
Passed: Building - Masonry Wall Reinforcing Approved As Requested In Email Troy Crews 7/9/2021
Passed: Building - Vertical Cells/Columns Troy Crews 7/12/2021
Passed: Building - Lintel/Tie Beam Troy Crews 7/12/2021
Passed: Building - Masonry Wall Reinforcing Troy Crews 7/14/2021
Passed: Building - Masonry Wall Reinforcing West Gable End Breezeway ,east Gable End Of Breezeway, Middle Gable Center Building Troy Crews 7/16/2021
Passed: Building - Masonry Wall Reinforcing Pictures Received Troy Crews 7/23/2021
Passed: Building - Lintel/Tie Beam Pictures Received Medical Center Troy Crews 8/4/2021
Passed: Building - Lintel/Tie Beam 4 Beams Inspected Troy Crews 8/10/2021
Passed: Building - Masonry Wall Reinforcing Interior Walls Mens And Womens Troy Crews 8/16/2021
Passed: Building - Masonry Wall Reinforcing As Requested Troy Crews 8/25/2021
Passed: Building - Masonry Wall Reinforcing Troy Crews 8/27/2021
Passed: Building - Masonry Wall Reinforcing North Storage Room Troy Crews 9/1/2021
Passed: Building - Masonry Wall Reinforcing Pictures Sent Troy Crews 9/3/2021
Passed: Building - Lintel/Tie Beam Troy Crews 9/7/2021
Passed: Building - Lintel/Tie Beam Two Front Gable Rake Beams Troy Crews 9/14/2021
Passed: Building - Masonry Wall Reinforcing Troy Crews 9/16/2021
Passed: Building - Masonry Wall Reinforcing Troy Crews 9/24/2021
Passed: Building - Lintel/Tie Beam Troy Crews 10/6/2021
Passed: Building - Masonry Wall Reinforcing Troy Crews 10/7/2021
Passed: Building - Masonry Wall Reinforcing Troy Crews 10/15/2021
Passed: Building - Masonry Wall Reinforcing Troy Crews 10/21/2021
Passed: Building - Footer Troy Crews 10/22/2021
Passed: Engineering - Setbacks Troy Crews 10/22/2021
Passed: Building - Monolithic Slab East End And Front On East End. Troy Crews 11/1/2021
Passed: Engineering - Setbacks Troy Crews 11/1/2021
Passed: Building - Masonry Wall Reinforcing Troy Crews 11/3/2021
Passed: Building - Monolithic Slab 4 Pavillion Slabs Troy Crews 11/22/2021
Passed: Engineering - Setbacks Troy Crews 11/22/2021
Passed: Building - Roof Decking East Side Pine Roof On Porches. Troy Crews 11/29/2021
Passed: Building - Monolithic Slab Troy Crews 11/29/2021
Passed: Engineering - Setbacks Troy Crews 11/29/2021
Passed: Building - Slab Troy Crews 12/3/2021
Passed: Building - Masonry Wall Reinforcing Troy Crews 12/8/2021
Passed: Building - Masonry Wall Reinforcing Troy Crews 12/13/2021
Passed: Building - Masonry Wall Reinforcing Troy Crews 12/15/2021
Passed: Mechanical - Rough In Main Trunk Lines And Exhaust Troy Crews 12/15/2021
Passed: Building - Lintel/Tie Beam Troy Crews 12/16/2021
Passed: Building - Monolithic Slab Troy Crews 12/21/2021
Passed: Engineering - Setbacks Troy Crews 12/21/2021
Passed: Building - Lintel/Tie Beam Also Front Slab, And Slab At Dumpster Apron. Troy Crews 1/4/2022
Passed: Plumbing/Gas - 2nd Rough-In Call Mens Side Back In For Waste Line Tommorrow Troy Crews 1/19/2022
Passed: Plumbing/Gas - Water Pipe 100 P.s.i. Troy Crews 1/19/2022
Passed: Building - Slab West Half Troy Crews 1/21/2022
Passed: Plumbing/Gas - 2nd Rough-In Waste Lines Test East Side Troy Crews 1/21/2022
Passed: Building - Roof Decking Troy Crews 1/25/2022
Passed: Building - Strapping Troy Crews 1/25/2022
Passed: Building - Slab East Half Entrance Area. Troy Crews 1/31/2022
Passed: Electrical - Above Ceiling Gang Bath Areas Troy Crews 2/18/2022
Passed: Mechanical - Rough In Gang Bath Areas Troy Crews 2/18/2022
Passed: Electrical - Above Ceiling Troy Crews 3/7/2022
Passed: Mechanical - Rough In Troy Crews 3/7/2022
Passed: Electrical - Above Ceiling Troy Crews 3/15/2022
Passed: Mechanical - Rough In Troy Crews 3/15/2022
Passed: Electrical - Above Ceiling Troy Crews 3/28/2022
Passed: Mechanical - Rough In Troy Crews 3/28/2022
Rescheduled 5/23/2022:Mechanical - Rough In Troy Crews 5/19/2022
Passed: Mechanical - Rough In Mechanical Room Tie In To Units Troy Crews 5/23/2022
Rescheduled 8/1/2022:Electrical - Above Ceiling Troy Crews 7/26/2022
Passed: Electrical - Above Ceiling Troy Crews 8/1/2022
Passed: Electrical - Permanent Power Troy Crews 8/15/2022
Release to power company Troy Crews 8/15/2022
Rescheduled 11/10/2022:Building - Final Troy Crews 11/7/2022
Passed: Building - Final Release Of Co Pending Fire Marshal Inspection. Troy Crews 11/10/2022
Certificate-Release Certificate Fire Inspection Received Troy Crews 11/17/2022
Documents
File Name Date File Size
I-10 Rest Area Elevation Confirmation 2021-04-12 07.22.04.850.pdf 2025.07.05 26.70kB
Certificate Of Occupancy 20221117.pdf 2025.07.05 53.32kB
Energy Code.pdf 2025.07.05 93.21kB
Rest Area Fire Inspection 2022-11-17 07.20.23.794.pdf 2025.07.05 71.44kB
Ground Location Site Plan 20201221 161844.pdf 2025.07.04 4.44MB
41141 Pics 2021-08-05 09.15.16.331.pdf 2025.07.04 5.57MB
Engineering_windload Calculations 20201201 150736.pdf 2025.07.04 11.48MB
41141 Slab 2 2021-02-26 16.38.18.132.jpg 2025.06.20 2.01MB
41141 Block Cells 2021-05-14 14.22.04.221.jpeg 2025.06.20 2.97MB
41141 Block Cells 2 2021-05-14 14.22.18.50.jpeg 2025.06.20 3.22MB
Structural Plans 20201201 130142.pdf 2025.06.20 4.23MB
Manual J.pdf 2025.06.19 2.03MB
Owner And Contractor Signature Page 20201201 141702.pdf 2023.12.26 672.30kB
Site Plan 20201201 130142.pdf 2023.12.26 763.32kB
41141 Slab 2021-02-26 16.38.02.804.msg 2023.12.26 2.28MB
Fdot Pa 2020-09-24 11.29.25.719 (1) 2020-12-01 14.57.56.208.pdf 2023.12.26 158.13kB
Property Appraiser Parcel Details Printed Page 20201201 150744.pdf 2023.12.26 457.98kB
Permit_ 000041141 Request To Change Applicant Email 2021-05-03 11.20.23.326.pdf 2023.12.26 100.38kB
I-10 Rest Area_columbia_drawings 100 2020-12-01 14.52.20.258.pdf 2023.12.26 14.27MB
Signature Page 41141 2021-02-01 09.02.39.345.pdf 2023.12.26 121.65kB
Img_6277.jpeg 41141 Nailing Porch Decking East Side 2021-11-29 08.02.27.592.msg 2023.12.26 4.87MB
Power Release-electrical-permanent Power 20220815.pdf 2022.08.15 38.98kB
Original Permit 20210111.pdf 2021.01.11 42.70kB