Inspection |
Notes |
Performed By |
Date |
Passed: Electrical - Temporary Service |
|
Anthony Aslan |
12/31/2020 |
Release to power company |
|
Anthony Aslan |
12/31/2020 |
Passed: Building - Footer |
Need Porta Potty Before Next Inspection. |
Anthony Aslan |
2/2/2021 |
Passed: Engineering - Setbacks |
|
Anthony Aslan |
2/2/2021 |
Failed: Plumbing/Gas - 1st Underground Rough–In |
Need To Get Air Out Of Drain Piping, |
Anthony Aslan |
2/26/2021 |
Failed: Plumbing/Gas - 1st Underground Rough–In |
Water Test Incomplete. Still Have Pipe With No Water. |
Anthony Aslan |
3/2/2021 |
Passed: Plumbing/Gas - 1st Underground Rough–In |
|
Anthony Aslan |
3/4/2021 |
Passed: Building - Slab |
|
Anthony Aslan |
3/15/2021 |
Failed: Building - Framing |
Missing H2.5's. Truss Check Engineering On R04, R09. Gables Show Ltsa24 4'ft O.c., Also Show 2x4 Blocking Between Truss With H2.5 Horizontally Strapped. Straps Missing Nails, No Post Set. Red Marker Where Missing Nails On Exterior Sheathing. |
Anthony Aslan |
4/26/2021 |
Passed: Building - Roof Decking |
|
Anthony Aslan |
4/26/2021 |
Failed: Building - Wall Sheathing |
Missing Nails Red Marker |
Anthony Aslan |
4/26/2021 |
Passed: Building - Wall Sheathing |
|
Anthony Aslan |
4/27/2021 |
Cancelled: Building - Wall Sheathing |
|
Anthony Aslan |
6/30/2021 |
Passed: Building - Strapping |
|
Anthony Aslan |
6/30/2021 |
Failed: Building - Framing |
Missing Anchors At Bottom Plate Splices |
Anthony Aslan |
6/30/2021 |
Passed: Electrical - 2nd Rough-In |
|
Anthony Aslan |
6/30/2021 |
Passed: Plumbing/Gas - 2nd Rough-In |
|
Anthony Aslan |
6/30/2021 |
Failed: Mechanical - Rough In |
Fresh Air Needs To Be Accessible And Have Automatic Or Gravity Damper Installed
kitchen Exhaust Missing Screws In Seam Joints |
Anthony Aslan |
7/1/2021 |
Failed: Mechanical - Rough In |
Fresh Air Not Corrected |
Anthony Aslan |
7/2/2021 |
Passed: Building - Framing |
|
Anthony Aslan |
7/2/2021 |
Passed: Building - Insulation |
Fresh Air Damper Still Not Corrected |
Anthony Aslan |
7/16/2021 |
Passed: Electrical - Permanent Power |
Need Septic Final |
Troy Crews |
9/15/2021 |
Release to power company |
|
Melissa Garber |
9/27/2021 |
Septic Release Inspection |
|
Health Dept |
9/27/2021 |
Cancelled: Building - Final |
|
Melissa Garber |
10/22/2021 |
Passed: Building - Final |
Two Outlets In Kitchen Counter Corner Not Gfci |
Anthony Aslan |
10/29/2021 |