Inspection |
Notes |
Performed By |
Date |
Passed: Engineering - Initial Driveway |
|
Mccormick, David |
12/30/2020 |
Cancelled: Building - Footer |
|
Troy Crews |
2/23/2021 |
Cancelled: Engineering - Setbacks |
|
Troy Crews |
2/23/2021 |
Passed: Building - Footer |
Install Footer Grounding Wire Per Plan |
Troy Crews |
3/10/2021 |
Passed: Engineering - Setbacks |
|
Troy Crews |
3/10/2021 |
Passed: Plumbing/Gas - 1st Underground Rough–In |
|
Troy Crews |
3/31/2021 |
Passed: Building - Slab |
Reminder Need Floor Elevation Confirmation Prior To Nailing Inspection. |
Troy Crews |
4/13/2021 |
Cancelled: Building - Strapping |
|
Troy Crews |
5/14/2021 |
Passed: Building - Ext Strapping/Wall Sheathing |
|
Troy Crews |
5/14/2021 |
Passed: Building - Wall Sheathing |
|
Troy Crews |
5/14/2021 |
Passed: Building - Roof Decking |
|
Troy Crews |
6/10/2021 |
Passed: Building - Framing |
Partial |
Troy Crews |
6/14/2021 |
Passed: Building - Slab |
2 Front Covered Porches |
Troy Crews |
6/23/2021 |
Passed: Electrical - Temporary Service |
|
Troy Crews |
7/16/2021 |
Release to power company |
|
Troy Crews |
7/16/2021 |
Passed: Electrical - 2nd Rough-In |
|
Troy Crews |
7/27/2021 |
Passed: Plumbing/Gas - 2nd Rough-In |
|
Troy Crews |
7/27/2021 |
Passed: Building - Insulation |
Exterior Walls, Call Back In For Second Floor And Sunroom Ceiling |
Troy Crews |
8/9/2021 |
Passed: Mechanical - Rough In |
Reminder Need Updated Ac And Floor Plans |
Troy Crews |
8/11/2021 |
Failed: Electrical - Permanent Power |
Need Driveway Final, Also Need All Exterior Doors . |
Troy Crews |
9/20/2021 |
Passed: Electrical - Temporary Service |
Driveway Must Be Done Prior To C.o. |
Troy Crews |
10/8/2021 |
Release to power company |
|
Troy Crews |
10/8/2021 |
Passed: Electrical - Permanent Power |
As Built Plans, Including Electric Service Change And New Driveway Final Prior To Co |
Troy Crews |
10/14/2021 |
Release to power company |
|
Troy Crews |
10/14/2021 |
Passed: Building - Final |
Waiting On Zoning Final And Culvert Final For Release |
Troy Crews |
12/2/2021 |
Passed: Engineering - Zoning Final |
|
Brandon Stubbs |
12/3/2021 |
Passed: Engineering - Final Driveway |
|
Jones, Richard |
12/3/2021 |
Passed: Engineering - Zoning Final |
|
Brandon Stubbs |
12/6/2021 |