Columbia County is committed to ensuring accessibility to this website regardless of disability. If anyone encounters a feature on this website that is inaccessible due to a disability, please contact the County Manger’s Office and the Columbia County Board of County Commissioners at (386) 758-1005. You may also email that office at patrick_weaver@columbiacountyfla.com and provide a brief description of the inaccessible feature. The County will either correct the inaccessible feature or, if correction is not possible due to technical limitations, provide the desired information through alternative means.

Skip to content

Columbia County, FL | Permit Details

Remodel Permit
Address 6779 SW COUNTY ROAD 240
LAKE CITY, FL 32024
Parcel #: 03522-004
Acres: 1.00
Owner: Brewer Larry A & Sallie Jean Demaio
Subdivision:
Zoning: A-3
Flood Zone: X
District: 5
Application #: 47780
Permit #: 000041074
Related Permit:
Submitted: Friday, November 20, 2020
Issued: Tuesday, December 29, 2020
Expires: Thursday, July 1, 2021
Completed: Thursday, July 1, 2021
Status: Completed
Septic Release? No
Notes:

Job Details
Description of the work being performed: Reconstruction to repair damage sustained during a windstorm
Type of Structure House
Commercial or Residential? Residential
Dev Permit # F023-
Building Code Edition Florida Building Code 2017 6th Edition & 2014 National Electrical Code
Fema map number 12023C0379C
Review Notes
11/16/2020 Application pending.
11/20/2020 Point Review - Printed-Online Application
11/20/2020 Point Review - Reviewed
11/23/2020 Zoning Review - Reviewed
12/1/2020 Plan Review - Documents Required
12/21/2020 Plan Review - Documents Required
12/29/2020 Plan Review - Reviewed
12/29/2020 Final Review - Reviewed
12/29/2020 Permit Issued Permit #000041074 created and approved.
Contractors
Name/ Business License Title Role
Eric Ehrlund
Restoration Specialists
CGC042165 General Contractor Contractor
Eric B Ehrlund
Restoration Specialists
County License & State License Expired.
CCC056803 Roofing Contractor Subcontractor
Inspections
Inspection Notes Performed By Date
Passed: Engineering - Spot Check Call Back In For Lintel When Block Work Repaired With Steel And Ready To Pour Troy Crews 1/14/2021
Passed: Electrical - Temporary Service Troy Crews 1/28/2021
Passed: Modular - Lintel/Tie Beam Block Repair Troy Crews 2/2/2021
Release to power company 0 2/9/2021
Release to power company Melissa Garber 2/11/2021
Cancelled: Building - Wall Sheathing Troy Crews 2/19/2021
Passed: Building - Roof Decking Deck Ok , Need To Strap Trusses Down Don't Cover Until Inside Inspection Done, House Locked. Troy Crews 2/19/2021
Passed: Building - Framing Troy Crews 3/1/2021
Passed: Electrical - 2nd Rough-In Close Up Junction Boxes With Plates Troy Crews 3/1/2021
Passed: Mechanical - Rough In Nee To Complete Bath Fan Ducts Will See When I Come Back For Insulation Inspection Troy Crews 3/1/2021
Failed: Building - Insulation Get All Wiring In Place, Finish All Outside Walls With Insulation, Send Mold Remediation Report. Troy Crews 4/29/2021
Failed: Building - Insulation Need To Inspect Plumbing Prior To Sheetrock Troy Crews 5/3/2021
Passed: Building - Insulation Plumbing Area Not To Be Covered At This Time Per Contractor, Plumbing Rough To Be Called In Prior To Backer Board Installation. Troy Crews 5/5/2021
Passed: Engineering - Spot Check Let Us Know If Ready For Power Troy Crews 5/24/2021
Passed: Electrical - Permanent Power Troy Crews 5/26/2021
Release to power company Troy Crews 5/26/2021
Failed: Plumbing/Gas - Tub Set/Shower Pan Tub Set Was Fine But We Need Pressure On Water Lines Before Any Cover Up Matt Forsyth 5/28/2021
Passed: Plumbing/Gas - Tub Set/Shower Pan Bathroom Vanities And Showers Troy Crews 6/4/2021
Failed: Building - Final Not Complete Bathrooms, Doors, Trim, Paint, Ac Repair Etc. Troy Crews 6/9/2021
Cancelled: Building - Final Troy Crews 6/11/2021
Failed: Building - Final Trim On Half Gable, Fan Living Room, Valves Under Sink, Move Vanity For Drawers. Troy Crews 6/24/2021
Passed: Building - Final Troy Crews 7/1/2021