Columbia County is committed to ensuring accessibility to this website regardless of disability. If anyone encounters a feature on this website that is inaccessible due to a disability, please contact the County Manger’s Office and the Columbia County Board of County Commissioners at (386) 758-1005. You may also email that office at patrick_weaver@columbiacountyfla.com and provide a brief description of the inaccessible feature. The County will either correct the inaccessible feature or, if correction is not possible due to technical limitations, provide the desired information through alternative means.

Skip to content

Columbia County, FL | Permit Details

New Residential Construction Permit

Address 292 SW BRADSHAW GLN
LAKE CITY, FL 32024
Parcel #: 03397-021
Acres: 4.69
Owner: Handy Brent
Subdivision:
Zoning: A-3
Flood Zone: X
District: 5
Application #: 47546
Permit #: 000041066
Related Permit:
Submitted: Friday, October 16, 2020
Issued: Wednesday, December 23, 2020
Expires: Tuesday, November 23, 2021
Completed: Tuesday, November 23, 2021
Status: Completed
Septic Release? Yes
Notes:
SPECIAL FAMILY LOT PERMIT (SFLP 2021) TO SON THE DRIVE IS ACROSS A SEPERATE PARCEL OF THE SAME OWNERSHIP, IF OWNERSHIP OF THAT PARCEL CHANGES AN EASEMENT MUST BE GRANTED TO THIS REAR PARCEL TO REMAIN LEGAL.
Job Details
Elevation regulation Minimum Requirement
Finished floor requirement One foot above the road
Fema map number 12023C0383D
In floodway N
This is the construction of a Single Family Dwelling
Setbacks Front 30'
Setback Side 1 25'
Setback Side 2 25'
Setbacks Rear 25'
Stories 2
Heated Area (Sqft) 2709
Total Area (Sqft) 3073
Building Height 27
Building Code Construction Type V
Building Code Element B
Building Code Occupancy Types Residential
Occupancy Use Title single family
Building Code Edition Florida Building Code 2017 6th Edition & 2014 National Electrical Code
Septic# (00-0000) or (X00-000) 20-0988
Review Notes
10/16/2020 Application pending.
10/16/2020 Point Review - Printed-Online Application
10/20/2020 Zoning Review - Corrections Needed
10/22/2020 Zoning Review - Reviewed
10/29/2020 Plan Review - Documents Required
11/10/2020 Plan Review - Documents Required
11/25/2020 Plan Review - Reviewed
11/25/2020 Final Review - Documents Required
12/23/2020 Final Review - Payment Needed
12/23/2020 Permit Issued
9/8/2021 Final Review - Payment Needed
Contractors
Name/ Business License Title Role
Isaiah Cully
Ic Construction Llc
CBC1259655 Building Contractor Contractor
Everton D Ruddock
D&s Lighting Inc
EC13003800 Electrical Contractor Subcontractor
Clinton G Wilson
Wilson Heat & Air Inc
CAC057886 Class B A/c Subcontractor
Cody Barrs
Barrs Plumbing Inc
CFC1427145 Plumbing Contractor Subcontractor
Tyler M Turner
Tmt Roofing Llc
CCC1330410 Cert Roofing Subcontractor
Inspections
Inspection Notes Performed By Date
Passed: Plumbing/Gas - 1st Underground Rough–In Matt Forsyth 1/11/2021
Passed: Building - Slab Matt Forsyth 1/14/2021
Passed: Building - Ext Strapping/Wall Sheathing Still Need Inspection On North End Bonus Room Wall For Nailing Matt Forsyth 2/25/2021
Failed: Building - Ext Strapping/Wall Sheathing Need Strapping Lst30 Tieing Wall And Gable Matt Forsyth 3/4/2021
Passed: Building - Ext Strapping/Wall Sheathing Strapping Completed Matt Forsyth 3/10/2021
Passed: Building - Framing Matt Forsyth 4/23/2021
Passed: Electrical - 2nd Rough-In Nail Plate Needed Bedrm4 Matt Forsyth 4/23/2021
Failed: Mechanical - Rough In Need Exaustfan Duct In Toilet Room. Condensate Line Needs Nail Plate Laundry Rm Matt Forsyth 4/23/2021
Failed: Plumbing/Gas - 2nd Rough-In Pex Piping In Top Of Wall On The Exterior Needs Pipe Insulation Matt Forsyth 4/23/2021
Passed: Mechanical - Rough In Matt Forsyth 5/7/2021
Failed: Plumbing/Gas - 2nd Rough-In Item Was Not Taken Care Of On The Last Inspection Protection Of Water Pipe On Exterior Wall Top Plate Matt Forsyth 5/7/2021
Passed: Plumbing/Gas - 2nd Rough-In Foam Insulation Will Be Used For Protection Matt Forsyth 5/7/2021
Failed: Building - Insulation Installation Was Started But Not Finished Matt Forsyth 5/21/2021
Passed: Building - Insulation Matt Forsyth 5/25/2021
Septic Release Inspection Health Dept 8/3/2021
Passed: Electrical - Permanent Power Troy Crews 9/8/2021
Release to power company Troy Crews 9/8/2021
Passed: Building - Final Matt Forsyth 11/23/2021
Documents
File Name Date File Size