Columbia County is committed to ensuring accessibility to this website regardless of disability. If anyone encounters a feature on this website that is inaccessible due to a disability, please contact the County Manger’s Office and the Columbia County Board of County Commissioners at (386) 758-1005. You may also email that office at patrick_weaver@columbiacountyfla.com and provide a brief description of the inaccessible feature. The County will either correct the inaccessible feature or, if correction is not possible due to technical limitations, provide the desired information through alternative means.

Skip to content

Columbia County, FL | Permit Details

New Residential Construction Permit
Address 3176 SW CUSTOM MADE CIR
LAKE CITY, FL 32024
Parcel #: 09280-144
Acres: 4.49
Owner: Steve & Theresa Patterson
Subdivision: Oaks Of Lake City Phase 1
Zoning: PRRD
Flood Zone: X
District: 5
Application #: 47736
Permit #: 000041052
Related Permit:
Submitted: Monday, November 9, 2020
Issued: Thursday, February 25, 2021
Expires: Monday, September 20, 2021
Completed: Monday, September 20, 2021
Status: Completed
Septic Release? Yes
Notes:
PERMIT ISSUED UNDER INCORRECT TYPE, CORRECTED AND UPDATED THIS PERMIT SURVEYOR LETTER AT 98.88' REC'D
Job Details
This is the construction of a Accessory Dwelling
If Other, explain the use of the structure. MOTHER - IN - LAW- SUITE
Heated Area (Sqft) 792
Total Area (Sqft) 792
Stories 1
Building Height 16
Building Code Construction Type V
Building Code Element B
Building Code Occupancy Types Residential
Occupancy Use Title ACCESSORY DWELLING
Setbacks Front 30'
Setback Side 1 25'
Setback Side 2 25'
Setbacks Rear 25'
Septic# (00-0000) or (X00-000) 20-0933
Building Code Edition Florida Building Code 2017 6th Edition & 2014 National Electrical Code
Elevation regulation Subdivision Plat
Finished floor requirement 94'
Requirement needed By Nailing Inspection
Document needed is a Surveyor letter giving the Finished Floor Elevation
Document receieved Yes
Fema map number 12023C0395C
In floodway N
Sealed roof decking options. (Must select one option per FBC 2020 7th Edition) Other
Sealed roof decking explanation for other option. Other
Review Notes
11/9/2020 Application pending.
11/10/2020 Point Review - Printed-Online Application
11/19/2020 Plan Review - Documents Required
11/19/2020 Zoning Review - Reviewed
11/24/2020 Plan Review - Documents Required
12/3/2020 Plan Review - Documents Required
12/11/2020 Plan Review - Documents Required
12/16/2020 Plan Review - Reviewed
12/17/2020 Zoning Review - Reviewed
12/18/2020 Final Review - Payment Needed
12/22/2020 Permit Issued Permit #000041052 created and approved.
2/25/2021 Application Converted Application was converted from Storage Building to New Residential Construction
2/25/2021 Permit reissued to reflect updated information.
Contractors
Name/ Business License Title Role
Marcus Matthews
Matthews Electric Llc
EC13005459 Electrical Contractor Subcontractor
Anthony R Franks
Franks & Lane Heating And Air Llc
CAC1818631 Cert. A/c Class “b” Subcontractor
Cody Barrs
Barrs Plumbing Inc
CFC1427145 Plumbing Contractor Subcontractor
Robert Ogles Ii
Ogles Roofing & Construction Llc
CCC1328699 Cert Roofing Subcontractor
Bryan Zecher
Bryan Zecher Construction Inc
CBC054575 Cert.building Contractor Contractor
Inspections
Inspection Notes Performed By Date
Passed: Building - Footer Troy Crews 1/5/2021
Passed: Engineering - Setbacks Troy Crews 1/5/2021
Passed: Building - Slab Troy Crews 2/25/2021
Passed: Building - Roof Decking Need To Call Exterior Strapping In Anthony Aslan 4/13/2021
Cancelled: Building - Ext Strapping/Wall Sheathing Anthony Aslan 4/13/2021
Passed: Building - Wall Sheathing Anthony Aslan 4/13/2021
Passed: Building - Framing Troy Crews 4/20/2021
Passed: Electrical - 2nd Rough-In Troy Crews 5/3/2021
Passed: Mechanical - Rough In Troy Crews 5/3/2021
Passed: Plumbing/Gas - 2nd Rough-In Troy Crews 5/3/2021
Passed: Building - Ext Strapping/Wall Sheathing Troy Crews 5/5/2021
Passed: Building - Insulation Troy Crews 5/7/2021
Passed: Electrical - Permanent Power Need Septic Release Troy Crews 7/14/2021
Septic Release Inspection Health Dept 7/20/2021
Passed: Building - Final Troy Crews 9/20/2021