Permit Information

New Residential Construction Permit

Address 180 NW GOBBLER DR
LAKE CITY, FL 32055
Parcel #: 02279-129
Acres:0.28
Owner:Woodborough North Llc
Subdivision:Turkey Creek Unit 1
Zoning:PRD
Flood Zone:X
District:1
Application #:47599
Permit #: 000041043
Related Permit:
Submitted:Monday, December 20, 2021
Issued:Tuesday, June 8, 2021
Expires:Friday, January 7, 2022
Completed:Friday, January 7, 2022
Status: Completed
Septic Release? Yes

Notes

CHECK SETBACKS IN FIELD REISSUED PERMIT DUE TO CHANGE IN SQUARE FOOTAGE OF SFD. ELEVATION CONFIRMATION REC'D @ 158.56'

Job Details

Elevation regulation Engineers Elevation Letter
Finished floor requirement 158.56'
Requirement needed By Nailing Inspection
Document needed is a Surveyor letter giving the Finished Floor Elevation
Document receieved Yes
Fema map number 12023C0283D
In floodway N
This is the construction of a Single Family Dwelling
Setbacks Front 20'
Setback Side 1 10'
Setback Side 2 10'
Setbacks Rear 20'
Stories 1
Heated Area (Sqft) 1703
Total Area (Sqft) 2518
Building Height 22
Building Code Construction Type V
Building Code Element B
Building Code Occupancy Types Residential
Occupancy Use Title single family
Building Code Edition Florida Building Code 2017 6th Edition & 2014 National Electrical Code
Septic# (00-0000) or (X00-000) 20-0891

Review Notes

10/22/2020 Point Review - Received-Hard Copy Application
10/23/2020 Zoning Review - On Hold-Incomplete
10/23/2020 Zoning Review - Reviewed
11/5/2020 Plan Review - Reviewed
11/6/2020 Zoning Review - Reviewed
12/3/2020 Final Review - Documents Required
12/18/2020 Final Review - Payment Needed
12/18/2020 Permit Issued
3/18/2021 Plan Review - Reviewed
3/18/2021 Permit reissued to reflect updated information.
6/8/2021 Permit reissued to reflect updated information.
1/5/2022 Final Review - Payment Needed

Contractors

Name / Business License Title Role
James Lipscomb
Lipscomb & Eagle Development Inc
County License & State License & Liability Insurance & Workers Comp Expired.
CBC1253543 Building Contractor Contractor
Mervin L Hines
Hines Electrical & Communication Inc
Liability Insurance & Workers Comp Expired.
EC13003393 Electrical Contractor Subcontractor
David E Hall
David Hall's Air Cond & Heating Svc,inc.
CAC057424 Class B A/c Contractor Subcontractor
Cody Barrs
Barrs Plumbing Inc
CFC1427145 Plumbing Contractor Subcontractor
Kevin L Bedenbaugh Jr
Plumb Level Construction Co Llc
CCC1329482 Roofing Contractor Subcontractor

Inspections

Inspection Notes Performed By Date
Passed: Plumbing/Gas - 1st Underground Rough–In Anthony Aslan 4/30/2021
Passed: Electrical - 1st Underground Rough–In Anthony Aslan 4/30/2021
Passed: Building - Monolithic Slab Anthony Aslan 5/7/2021
Passed: Engineering - Setbacks Tight Lot Lines Need Survey Confirmation. Anthony Aslan 5/7/2021
Passed: Building - Roof Decking Anthony Aslan 6/9/2021
Passed: Building - Wall Sheathing Picture On Gable Straps Anthony Aslan 6/9/2021
Passed: Building - Strapping Porch Post Anthony Aslan 6/9/2021
Passed: Building - Framing Gable Small Truss At Entrance Needs Heavy Strapping. Truss Plan Show 695 & 814 Uplift On Each End. Anthony Aslan 6/11/2021
Failed: Electrical - 2nd Rough-In Smoke Detector To Close To Main Return In Hallway. Anthony Aslan 7/9/2021
Failed: Mechanical - Rough In Laundry Wall Needs To Be Furred Out For Dryer Vent, Dryer Box Needs To Be Change Out So That Dryer Pipe Is Not Oval. main Return Flex Needs Strap At Boot, 1 1/2 Times The Diameter From Proper Flow. bath Exhaust Fans Missing Strapping On Venting. plenums Minimum 4" Clearance Around Plenums. Anthony Aslan 7/9/2021
Failed: Plumbing/Gas - 2nd Rough-In Nail Guards Missing Master Bed, Supply Lines At Water Heater, Hall Bath Vent And Shower Supply Lines. Anthony Aslan 7/9/2021
Passed: Mechanical - Rough In Anthony Aslan 7/20/2021
Passed: Plumbing/Gas - 2nd Rough-In Anthony Aslan 7/20/2021
Passed: Electrical - 2nd Rough-In Anthony Aslan 7/20/2021
Passed: Building - Insulation Anthony Aslan 7/26/2021
Septic Release Inspection Health Dept 12/14/2021
Passed: Electrical - Permanent Power Need Driveway Release Anthony Aslan 12/16/2021
Release to power company Anthony Aslan 12/20/2021
Release to power company Laurie Hodson 12/20/2021
Passed: Building - Final Anthony Aslan 1/7/2022

Documents

File Name Date File Size
Certificate Of Completion 20260721.pdf 2026.07.21 19.09kB
Image.jpg 2026.06.16 3.41MB
Driveway_application_drawing.jpg 2026.06.04 238.93kB
Inspections Checklist.pdf 2026.05.26 300.75kB
300-3_unpavednoculvert.pdf 2026.05.26 128.11kB
Original Permit 20260526.pdf 2026.05.26 12.37kB
Application.pdf 2026.05.15 94.63kB
Proposed Site Plan 20260515 151721.pdf 2026.05.15 78.64kB

Contact Us

Building Department

Office Hours

Monday-Friday
8:00 A.M. - 4:30 P.M.

Contact Information

Phone: 386-758-1008
Fax: 386-758-2160

Email: bldginfo@columbiacountyfla.com

Location

135 NE Hernando Ave.
Lake City, FL 32055 (opens in new window)

Mailing Address

P.O. Box 1529
Lake City, FL 32056-1529

Public Records

Public records policy and fees

Board of County Commissioners
Tel. (386) 758-1326
Fax: (386) 758-2182
Email: publicrecords@columbiacountyfla.com

Mailing Address:
P.O. Box 1529
Lake City, FL 32056-1529

Citizen Feedback

Let us know how we're doing

ADA Accessibility

Columbia County is committed to ensuring accessibility to this website regardless of disability. If anyone encounters a feature on this website that is inaccessible due to a disability, please contact the Columbia County ADA Coordinator at (386) 758-3344. You may also email that office at hr@columbiacountyfla.com and provide a brief description of the inaccessible feature.

Columbia County strives to provide reasonable accommodations to help people with disabilities have an equal opportunity to participate in our public meetings. Please notify our ADA Coordinator at least 48 hours prior to the public meeting by calling (386) 758-3344.