Inspection |
Notes |
Performed By |
Date |
Passed: Plumbing/Gas - 1st Underground Rough–In |
|
Anthony Aslan |
1/5/2021 |
Passed: Building - Footer |
|
Matt Forsyth |
1/27/2021 |
Passed: Engineering - Setbacks |
|
Matt Forsyth |
1/27/2021 |
Passed: Building - Monolithic Slab |
|
Matt Forsyth |
1/28/2021 |
Passed: Engineering - Setbacks |
|
Matt Forsyth |
1/28/2021 |
Passed: Building - Roof Decking |
|
Matt Forsyth |
3/15/2021 |
Passed: Building - Wall Sheathing |
|
Matt Forsyth |
3/15/2021 |
Failed: Building - Framing |
1) 2"washers On Anchor Bolts Plans Spec 3"washers.
2) Missing Anchors On Bottom Plate At Splices Joints
3) Missing H2.5 On Front Gable Out Lookers, Also Missing On Hip Jacks In Back Room
4) Missing Truss Engineering. |
Anthony Aslan |
3/30/2021 |
Failed: Building - Framing |
No Truss Engineering, No H2.5 On Front Gable. |
Anthony Aslan |
4/6/2021 |
Passed: Electrical - 1st Underground Rough–In |
Need To Strap Up Hall Bath Exhaust Wiring.. |
Anthony Aslan |
4/6/2021 |
Passed: Plumbing/Gas - 2nd Rough-In |
|
Anthony Aslan |
4/6/2021 |
Passed: Plumbing/Gas - Tub Set/Shower Pan |
|
Anthony Aslan |
4/6/2021 |
Passed: Building - Framing |
Truss Engineering Installed |
Anthony Aslan |
4/8/2021 |
Cancelled: Building - Fire Rated Wall |
|
Anthony Aslan |
4/23/2021 |
Passed: Building - Insulation |
|
Anthony Aslan |
5/4/2021 |
Failed: Mechanical - Rough In |
Outside, Fresh Air, Make Up Air, Can Not Be Direct Pull. Need Automatic Or Gravity Damper Installed. |
Anthony Aslan |
5/4/2021 |
Passed: Mechanical - Rough In |
|
Anthony Aslan |
5/6/2021 |
Septic Release Inspection |
|
Health Dept |
6/2/2021 |
Passed: Electrical - Permanent Power |
|
Anthony Aslan |
6/25/2021 |
Release to power company |
|
Anthony Aslan |
6/25/2021 |
Passed: Building - Final |
|
Anthony Aslan |
10/20/2021 |