Permit Details

Permit Search

Permit

New Residential Construction

856 SE RACETRACK LN
LAKE CITY, FL 32025

Permit #
000040962
Application #
47801
Status Completed
  1. Submitted Nov 18, 2020
  2. Issued Dec 3, 2020
  3. Expires Oct 31, 2021
  4. Completed May 11, 2021

Property

Parcel #
08632-000
Owner
Morgan Nathan & Janet
Acres
14.30
Subdivision
—
Zoning
A-3
Flood zone
X
District
4

Permit

Status
Completed
Septic release
Released
Related permit
—

Job Details

Elevation regulation
Minimum Requirement
Finished floor requirement
One foot above the road
Fema map number
12023C0401C
In floodway
N
This is the construction of a
Single Family Dwelling
Setbacks Front
30
Setback Side 1
25
Setback Side 2
25
Setbacks Rear
25
Stories
1
Heated Area (Sqft)
2560
Total Area (Sqft)
3197
Building Height
20
Building Code Construction Type
V
Building Code Element
B
Building Code Occupancy Types
Residential
Occupancy Use Title
single family
Building Code Edition
Florida Building Code 2017 6th Edition & 2014 National Electrical Code
Septic# (00-0000) or (X00-000)
20-0920

Status & Review History

  1. Application pending.
  2. Point Review - Printed-Online Application
  3. Zoning Review - Reviewed
  4. Plan Review - Reviewed
  5. Zoning Review - Reviewed
  6. Final Review - Documents Required
  7. Final Review - Payment Needed
  8. Permit Issued
  9. Final Review - Payment Needed

Contractors

  • Kevin L Bedenbaugh Jr

    Plumb Level Construction Co Llc

    License
    CGC1516042
    Title
    General Contractor
    Role
    Contractor
  • Mark A Ganskop

    Express Plumbing Inc

    License
    CFC1428040
    Title
    Plumbing Contractor
    Role
    Subcontractor
  • Kevin L Bedenbaugh Jr

    Plumb Level Construction Co Llc

    License
    CCC1329482
    Title
    Roofing Contractor
    Role
    Subcontractor
  • Ryan Felknor

    Felknor Electric, Inc.

    License
    EC13003153
    Title
    Electrical Contractor
    Role
    Subcontractor
  • Timothy D Shatto

    Shatto Heating & Air, Inc.

    License
    CAC057875
    Title
    A/c Class B
    Role
    Subcontractor

Inspections

  1. Dec 7, 2020

    Passed: Building - Footer

    Inspected by Troy Crews

  2. Dec 7, 2020

    Passed: Engineering - Setbacks

    Need Porta Pottie

    Inspected by Troy Crews

  3. Dec 14, 2020

    Passed: Plumbing/Gas - 1st Underground Rough–In

    Inspected by Troy Crews

  4. Dec 21, 2020

    Passed: Building - Slab

    Inspected by Troy Crews

  5. Jan 7, 2021

    Passed: Building - Roof Decking

    Inspected by Troy Crews

  6. Jan 7, 2021

    Passed: Building - Wall Sheathing

    Inspected by Troy Crews

  7. Jan 7, 2021

    Failed: Building - Framing

    Anchor Bolts Not Complete Call Back In With Rough In Inspections

    Inspected by Troy Crews

  8. Jan 7, 2021

    Passed: Electrical - Temporary Service

    Inspected by Troy Crews

  9. Jan 7, 2021

    Release to power company

    Inspected by Troy Crews

  10. Jan 20, 2021

    Passed: Building - Framing

    Items Completed

    Inspected by Troy Crews

  11. Jan 20, 2021

    Passed: Electrical - 1st Underground Rough–In

    Inspected by Troy Crews

  12. Jan 20, 2021

    Failed: Mechanical - Rough In

    Need Seals On Flange Of All Registers, Oven Duct No Male Inside Connections In Vertical Piping To Catch Grease

    Inspected by Troy Crews

  13. Jan 20, 2021

    Failed: Plumbing/Gas - 2nd Rough-In

    No Pressure Water Lines, No Nail Plates On Any Drain Lines

    Inspected by Troy Crews

  14. Jan 26, 2021

    Failed: Building - Insulation

    Need Clearance For Triple-wall Fireplace Duct

    Inspected by Matt Forsyth

  15. Jan 26, 2021

    Passed: Mechanical - Rough In

    Inspected by Matt Forsyth

  16. Jan 26, 2021

    Passed: Plumbing/Gas - 2nd Rough-In

    Inspected by Matt Forsyth

  17. Jan 27, 2021

    Passed: Building - Insulation

    Phone Removed From Chimney Pipe And Replaced With Firewool

    Inspected by Troy Crews

  18. Mar 11, 2021

    Septic Release Inspection

    Inspected by Health Dept

  19. Mar 23, 2021

    Passed: Electrical - Permanent Power

    Inspected by Troy Crews

  20. Mar 23, 2021

    Release to power company

    Inspected by Troy Crews

  21. May 4, 2021

    Passed: Building - Final

    Need Letter From A/c Contractor On Equipment Line Size And Warranty.

    Inspected by Anthony Aslan

  22. May 11, 2021

    Certificate-Release Certificate

    Rec'd Hvac Letter

    Inspected by Anthony Aslan

Documents