Permit Details

Permit Search

Permit

New Residential Construction

504 SW PACES GLN
LAKE CITY, FL 32024

Permit #
000040961
Application #
47702
Status Completed
  1. Submitted Nov 3, 2020
  2. Issued Dec 3, 2020
  3. Expires May 8, 2022
  4. Completed Nov 9, 2021

Property

Parcel #
02431-206
Owner
Otero Alfred & Serana
Acres
5.16
Subdivision
West Paces
Zoning
RR
Flood zone
X
District
3

Permit

Status
Completed
Septic release
Released
Related permit
—

Job Details

Elevation regulation
Minimum Requirement
Finished floor requirement
One foot above the road
Fema map number
12023C0290D
In floodway
N
This is the construction of a
Single Family Dwelling
Setbacks Front
25
Setback Side 1
10
Setback Side 2
10
Setbacks Rear
15
Stories
1
Heated Area (Sqft)
3465
Total Area (Sqft)
4655
Building Height
22
Building Code Construction Type
V
Building Code Element
B
Building Code Occupancy Types
Residential
Occupancy Use Title
single family
Building Code Edition
Florida Building Code 2017 6th Edition & 2014 National Electrical Code
Septic# (00-0000) or (X00-000)
20-0917

Status & Review History

  1. Application pending.
  2. Point Review - Printed-Online Application
  3. Plan Review - Reviewed
  4. Zoning Review - Reviewed
  5. Final Review - Documents Required
  6. Final Review - Payment Needed
  7. Permit Issued
  8. Final Review - Payment Needed

Contractors

  • Kevin L Bedenbaugh Jr

    Plumb Level Construction Co Llc

    License
    CGC1516042
    Title
    General Contractor
    Role
    Contractor
  • Mark A Ganskop

    Express Plumbing Inc

    License
    CFC1428040
    Title
    Plumbing Contractor
    Role
    Subcontractor
  • Ryan Felknor

    Felknor Electric, Inc.

    License
    EC13003153
    Title
    Electrical Contractor
    Role
    Subcontractor
  • Timothy D Shatto

    Shatto Heating & Air, Inc.

    License
    CAC057875
    Title
    A/c Class B
    Role
    Subcontractor
  • Kevin L Bedenbaugh Jr

    Plumb Level Construction Co Llc

    License
    CCC1329482
    Title
    Roofing Contractor
    Role
    Subcontractor

Inspections

  1. Dec 14, 2020

    Passed: Building - Footer

    Inspected by Matt Forsyth

  2. Dec 14, 2020

    Passed: Engineering - Setbacks

    Inspected by Matt Forsyth

  3. Jan 11, 2021

    Failed: Plumbing/Gas - 1st Underground Rough–In

    Test Stack Needs To Be On High End Of System

    Inspected by Matt Forsyth

  4. Jan 11, 2021

    Passed: Plumbing/Gas - 1st Underground Rough–In

    Inspected by Matt Forsyth

  5. Jan 13, 2021

    Failed: Building - Slab

    Missing #5 Bar In Garage Footing

    Inspected by Matt Forsyth

  6. Jan 13, 2021

    Passed: Building - Slab

    #5 Bar In Continuous Footing For Garage

    Inspected by Matt Forsyth

  7. Feb 9, 2021

    Passed: Building - Roof Decking

    Inspected by Matt Forsyth

  8. Feb 9, 2021

    Passed: Building - Wall Sheathing

    Inspected by Matt Forsyth

  9. Mar 24, 2021

    Failed: Building - Framing

    2 Windows Upstairs Need To Be Tempered Glass

    Inspected by Matt Forsyth

  10. Mar 24, 2021

    Failed: Building - Strapping

    Strapping Was Covered Up With Finished Hardie Board

    Inspected by Matt Forsyth

  11. Mar 24, 2021

    Passed: Electrical - 2nd Rough-In

    Inspected by Matt Forsyth

  12. Mar 24, 2021

    Failed: Mechanical - Rough In

    Exhaust Fans In Bathrooms Were Not Installed

    Inspected by Matt Forsyth

  13. Mar 24, 2021

    Failed: Plumbing/Gas - 2nd Rough-In

    Need Nail Plate For Top Of Wall For Gas Line On Exterior Wall

    Inspected by Matt Forsyth

  14. Apr 9, 2021

    Passed: Electrical - Temporary Service

    Inspected by Matt Forsyth

  15. Apr 9, 2021

    Release to power company

    Inspected by Matt Forsyth

  16. Apr 15, 2021

    Passed: Building - Insulation

    Inspected by Matt Forsyth

  17. Apr 15, 2021

    Passed: Building - Framing

    Inspected by Matt Forsyth

  18. Apr 15, 2021

    Passed: Building - Strapping

    Inspected by Matt Forsyth

  19. Apr 15, 2021

    Passed: Mechanical - Rough In

    Inspected by Matt Forsyth

  20. Apr 15, 2021

    Passed: Plumbing/Gas - 2nd Rough-In

    Inspected by Matt Forsyth

  21. Aug 4, 2021

    Septic Release Inspection

    Inspected by Health Dept

  22. Aug 11, 2021

    Passed: Electrical - Permanent Power

    Inspected by Matt Forsyth

  23. Aug 11, 2021

    Release to power company

    Inspected by Matt Forsyth

  24. Oct 25, 2021

    Failed: Building - Final

    House Needs To Be Finished,blower Door Test

    Inspected by Matt Forsyth

  25. Nov 9, 2021

    Passed: Building - Final

    Check Front And Back Porch Plugs Make Sure Gfci Protected

    Inspected by Troy Crews

Documents