| Application #: | 47786 |
| Permit #: |
000040952 |
| Related Permit: |
|
| Submitted: | |
| Issued: | Wednesday, December 2, 2020 |
| Expires: | Tuesday, August 3, 2021 |
| Completed: | |
| Status: |
Permit Issued |
| Septic Release? |
Yes |
| Elevation regulation |
Accessory Use |
| Finished floor requirement |
Meet existing structure |
| Fema map number |
12023C0293D |
| In floodway |
N |
| Description of addition: |
garage addition |
| Select driveway access to property: |
Existing Drive |
| Fire sprinklers? |
No |
| Setbacks Front |
25 |
| Setback Side 1 |
10 |
| Setback Side 2 |
10 |
| Setback Rear |
15 |
| Stories |
1 |
| Heated Area (Sqft) |
0 |
| Total Area (Sqft) |
414 |
| Total Estimated Cost |
18000 |
| Building Height |
12 |
| Building Code Construction Type |
V |
| Building Code Element |
B |
| Building Code Occupancy Types |
Storage |
| Occupancy Use Title |
garage |
| Dev Permit # |
F023- |
| Design Occupant Load |
0 |
| Building Code Edition |
Florida Building Code 2017 6th Edition & 2014 National Electrical Code |
| Septic# |
20-0838 |
| Is this an addition for commercial or residential use? |
Residential |
| 11/17/2020 |
Point Review - Received-Hard Copy Application |
| 11/17/2020 |
Point Review - Reviewed |
| 11/18/2020 |
Zoning Review - Reviewed |
| 11/23/2020 |
Plan Review - Documents Required |
| 12/2/2020 |
Plan Review - Reviewed |
| 12/2/2020 |
Final Review - Payment Needed |
| 12/2/2020 |
Permit Issued |
| Name / Business |
License |
Title |
Role |
| Inspection |
Notes |
Performed By |
Date |
| Septic Release Inspection |
|
Health Dept |
12/2/2020 |
| Passed: Building - Footer |
|
Matt Forsyth |
12/4/2020 |
| Passed: Engineering - Setbacks |
|
Matt Forsyth |
12/4/2020 |
| Passed: Building - Slab |
|
Matt Forsyth |
12/4/2020 |
| Passed: Building - Vertical Cells/Columns |
|
Matt Forsyth |
12/9/2020 |
| Passed: Building - Lintel/Tie Beam |
|
Matt Forsyth |
12/9/2020 |
| Passed: Building - Masonry Wall Reinforcing |
|
Matt Forsyth |
12/9/2020 |
| Passed: Building - Lintel/Tie Beam |
Top Of Wall |
Matt Forsyth |
12/11/2020 |
| Passed: Building - Masonry Wall Reinforcing |
Top Of Wall |
Matt Forsyth |
12/11/2020 |
| Passed: Building - Framing |
|
Matt Forsyth |
2/4/2021 |