Permit Details

Permit Search

Permit

Mobile Home

947 SE GILES MARTIN AVE
LAKE CITY, FL 32024

Permit #
000040924
Application #
47738
Status Completed
  1. Submitted Nov 9, 2020
  2. Issued Nov 20, 2020
  3. Expires Jun 21, 2021
  4. Completed Dec 29, 2020

Property

Parcel #
09669-000
Owner
Keen Darrell A (luke Davenport-mh)
Acres
12.50
Subdivision
—
Zoning
A-3
Flood zone
X
District
4

Permit

Status
Completed
Septic release
Released
Related permit
—

Job Details

Elevation regulation
Minimum Requirement
Finished floor requirement
One foot above the road
Fema map number
12023C0505C
In floodway
N
Mobile Home is a:
Double Wide
Year Built
2021
Width (Ft.In)
32
Length (Ft.In)
80
Driveway access to home:
Culvert Permit
Installation Decal #
74448
Septic #
20-0911
Setbacks Front
30'
Setback Side 1
25'
Setbacks Rear
25'
Dev Permit #
F023-
Setback Side 2
25'
Are you applying for a 5 year temporary permit?
No
Serial #
SBHGA12012798AB
Wind Zone?
2
Residential or Commercial Use?
Residential

Status & Review History

  1. Application pending.
  2. Point Review - On Hold-Incomplete
  3. Point Review - Reviewed
  4. Zoning Review - Reviewed
  5. Plan Review - Reviewed
  6. Final Review - Documents Required
  7. Permit Issued

Contractors

  • Ernest S Johnson

    Dependable Mobile Home Service

    License
    IH1025249
    Title
    Mh Installer (ih)
    Role
    Contractor

    County License & State License Expired.

  • Glenn Whittington

    Whittington Electric Inc

    License
    EC13002957
    Title
    Electrical Contractor
    Role
    Subcontractor
  • Timothy D Shatto

    Shatto Heating & Air, Inc.

    License
    CAC057875
    Title
    A/c Class B
    Role
    Subcontractor

Inspections

  1. Dec 23, 2020

    Passed: Mobile Home - Mobile Home Set-Up Final

    Need To Connect Ground On Trailer Frame. A/c Duct Strap At Supply And Return Remove And Put Foam Blocks. Send Pictures Of Completed Items.

    Inspected by Anthony Aslan

  2. Dec 23, 2020

    Passed: Engineering - Setbacks

    Inspected by Anthony Aslan

  3. Dec 29, 2020

    Release to power company

    Inspected by Melissa Garber

  4. Dec 29, 2020

    Certificate-Release Certificate

    Inspected by Anthony Aslan

  5. Dec 29, 2020

    Septic Release Inspection

    Inspected by Health Dept